XI-IATI-IADB-HO-L1186
Inter-American Development Bank
Support for the National Electricity Transmission Program
Apoyo al Programa Nacional de Transmisión de Energía Eléctrica
The general objective is to strengthen the National Transmission System (STN) by financing priorityworks in the ENEE investment plan. The specific objectives are to: (i) build capacity for interconnection with the RegionalElectricity Market (MER), in order to make full use of the Central American Electric Interconnection System (SIEPAC);(ii) improve the ENEE's financial sustainability and institutional capacity; (iii) improve transmission quality by makingelectricity service more reliable; and (iv) facilitate transport of electricity generated with renewable energy projects tothe STN.
El objetivo general es reforzar el Sistema de Transmisión Nacional (STN) mediante financiamientode obras prioritarias del plan de inversiones de la ENEE. Los objetivos específicos son: (i) fortalecer la capacidad deinterconexión con el MER para potenciar el uso del Sistema de Interconexión Eléctrica de los Países de América Central(SIEPAC); (ii) mejorar la sostenibilidad financiera y capacidad institucional de la ENEE; (iii) mejorar la calidad de latransmisión aumentando la confiabilidad del servicio eléctrico; y (iv) facilitar el transporte al STN de electricidad generadacon proyectos de Energía Renovable (ER).
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
EMPRESA NACIONAL DE ENERGIA ELECTRICA
Strategic Climate Fund
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
EMPRESA NACIONAL DE ENERGIA ELECTRICA
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
ENERGY
ENERGIA
2543550.0
2456750.0
2365300.0
2272300.0
2177750.0
2083200.0
1987100.0
1894100.0
1798000.0
1706550.0
1616650.0
1528300.0
1443050.0
1359350.0
1278750.0
1204350.0
1128400.0
1058650.0
992000.0
928450.0
868000.0
810650.0
756400.0
705250.0
655650.0
612250.0
8606250.0
223000
Disbursement in second quarter of 2020
1088.91
Interest repayment in forth quarter of 2020
15500000
Disbursement in forth quarter of 2020
500000
Disbursement in forth quarter of 2020
54260.56
Interest repayment in second quarter of 2021
36880000
Disbursement in forth quarter of 2021
1200000
Disbursement in forth quarter of 2021
64086.95
Interest repayment in forth quarter of 2021
229247.33
Interest repayment in second quarter of 2022
595861.09
Interest repayment in forth quarter of 2022
1000000
Disbursement in forth quarter of 2022
26100000
Disbursement in forth quarter of 2022
1326122.5
Interest repayment in second quarter of 2023
1608798.39
Interest repayment in forth quarter of 2023
24560000
Disbursement in forth quarter of 2023
2200000
Disbursement in forth quarter of 2023
Honduras. Loan Proposal.pdf
PEP HO-L1186 final.pdf
HO-L1186_1631_8_SP.pdf
HO-L1186_9648_8_SP.pdf
Plan General de Adquisiciones.XLSX
Plan de desembolsos por componente y producto.xlsx
HO-L1186_7215_2_SP.pdf
HO-L1186_7215_3_SP.pdf
Borrador del Reglamento Operativo.DOCX
HO-L1186_9648_7_SP.pdf
Apoyo al Programa Nacional de Transmisión de Energía Eléctrica - SX.pdf
HO-L1186_9648_5_SP.pdf
HO-L1186_9648_1_SP.pdf
HO-L1186 First period Jan-Jun 2020 - Public Report.pdf
HO-L1186_P2059501_SP.pdf
Plan de Monitoreo y Evaluacion (FINAL).doc
HO-L1186_9648_6_SP.pdf
HO-L1186_P1208428_2_SP.pdf
HO-L1186 First period Jan-Jun 2021 - Public Report.pdf
HO-L1186 First period Jan-Jun 2022 - Public Report.PDF
HO-L1186_7215_4_SP.pdf
HO-L1186 Informe Evaluacion Economica.docx
Honduras. Propuesta de Préstamo.pdf
HO-L1186_P2059501_2_SP.pdf
HO-L1186_P679390_SP.pdf
HO-L1186_SPF_20170920_1039.pdf
HO-L1186 4599.pdf
HO-L1186 Second period Jan-Dec 2019-Public Report.pdf
HO-L1186_1631_10_SP.pdf
HO-L1186_P807215_2_SP.pdf
HO-L1186 -Análisis Contribución Integracion_Regional V1.docx
HO-L1186_1631_12_SP.pdf
HO-L1186_P615567_SP.pdf
HO-L1186_1631_5_SP.pdf
HO-L1186_P807215_1_SP.pdf
HO-L1186_P2059501_1_SP.pdf
HO-L1186_4396_2_SP.pdf
HO-L1186_P669648_SP.pdf
HO-L1186 Second period Jan-Dec 2018-Public Report.pdf
HO-L1186_9648_3_SP.pdf
HO-L1186_9390_3_SP.pdf
HO-L1186_P883052_SP.pdf
HO-L1186 First period Jan-Jun 2019-Public Report.pdf
HO-L1186_P978057_SP.pdf
HO-L1186_7215_1_SP.pdf
HO-L1186 - Propuesta Intervencion Genero.docx
HO-L1186_6772_2_SP.pdf
HO-L1186_9390_1_SP.pdf
HO-L1186_7215_5_SP.pdf
HO-L1186_SSF_20170920_1039.pdf
HO-L1186_8057_1_SP.pdf
HO-L1186 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1186_P1208428_1_SP.pdf
HO-L1186_1631_6_SP.pdf
HO-L1186_P526772_SP.pdf
HO-L1186 - Analisis cumplimiento Política Servicos Públicos PSP.doc
HO-L1186_9648_9_SP.pdf
HO-L1186_P807215_SP.pdf
Perfil técnico. Amp. SEs Laínez y Miraflores y Línea de Transmisión.doc
HO-L1186_P531751_SP.pdf
HO-L1186 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1186 4598.pdf
HO-L1186_7215_9_SP.pdf
HO-L1186_7215_6_SP.pdf
HO-L1186 First period Jan-Jun 2023 - Public Report.PDF
HO-L1186_9648_11_SP.pdf
HO-L1186_7215_8_SP.pdf
Evaluacion de la Capacidad Institucional (SECI)-oct 2017 REV.DOCX
Apoyo al Programa Nacional de Transmisión de Energía Eléctrica - BL.pdf
HO-L1186_1631_7_SP.pdf
HO-L1186_9648_2_SP.pdf
HO-L1186_9648_10_SP.pdf
HO-L1186_P1208428_SP.pdf
HO-L1186_7215_7_SP.pdf
Perfil técnico. LT San Pedro Sular Sur- San Buenaventura - 09_Ago-2017.docx
HO-L1186_9390_2_SP.pdf
HO-L1186 Second period Jan-Dec 2022 - Public Report.PDF
XI-IATI-IADB-HO-L1198
Inter-American Development Bank
HONDURAS TRANSPORTATION AND FREIGHT LOGISTICS SECTOR REFORM Program
Programa de Reformas del Sector Transporte y Logística de Carga de Honduras
The program's objective is to support improvements in Honduras's logistics performance through regulatory, institutional, planning, and trade facilitation reforms in the sector, with a view to boosting competitiveness and regional integration. The specific objectives are to: (i) develop a regulatory framework with specific rules aimed at improving freight logistics services as part of a long-term vision; (ii) strengthen the institutional framework for the logistics sector by creating the National Logistics Council and a technical entity; (iii) improve integrated planning in the sector and delivery of the associated services; and (iv) modernize and simplify trade facilitation processes and technological systems.This loan is the first in a series of three operations that are technically linked but financed separately as programmatic policy-based loan operations (document CS-3633-2).
El objetivo del programa es contribuir a la mejora del desempeño logístico de Hondurasa través de reformas sectoriales en los ámbitos regulatorio, institucional, de planificación y de facilitación comercial, que permita ganancias en la competitividad e integración regional. Los objetivos específicos del programa son: (i) consolidar unmarco normativo con reglamentos específicos para la mejora de servicios de logística de carga con visión de largo plazo;(ii) el fortalecimiento de la institucionalidad del sector logístico a través de la creación del Consejo Nacional de Logística (CNL)e instancia a nivel técnico; (iii) la mejora de la planificación integral en el sector y la prestación de servicios asociados; y (iv) lamodernización y simplificación de los procesos y los sistemas tecnológicos de facilitación comercial. El presente préstamo es el primero de una serie de tres operaciones, vinculadas técnicamente entre sí, pero financiadasen forma independiente, bajo la modalidad de Préstamo Programático de Apoyo a Reformas de Políticas (CS-3633-2).
REPUBLICA DE HONDURAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
SECRETARIA DE FINANZAS
SECRETARIA DE FINANZAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRANSPORT
TRANSPORTE
90000000
Disbursement in forth quarter of 2018
743123.84
Interest repayment in second quarter of 2019
966836.71
Interest repayment in forth quarter of 2019
802770.28
Interest repayment in second quarter of 2020
452906.57
Interest repayment in forth quarter of 2020
371373.01
Interest repayment in second quarter of 2021
369271.24
Interest repayment in forth quarter of 2021
385121.09
Interest repayment in second quarter of 2022
828670.62
Interest repayment in forth quarter of 2022
1552136.52
Interest repayment in second quarter of 2023
1816044.7
Interest repayment in forth quarter of 2023
Contrato - Programa de Reformas del Sector Transporte y Logística de Carga de Honduras.pdf
XI-IATI-IADB-HO-L1213
Inter-American Development Bank
Potable Water and Sanitation Program in Honduras
Programa de Agua Potable y Saneamiento en Honduras
The general objective of the program is to contribute to improving the quality of life of the population in Honduras without quality access to basic water and sanitation services. The specific objectives are: (i) increase access and improve the quality of WSS services with a focus on water security in urban and rural areas; and (ii) strengthen sector entities to improve the management and sustainability of service provision.
El objetivo general del programa es contribuir a mejorar la calidad de vida de la población en Honduras sin acceso de calidad a AyS básico. Los objetivos específicos son: (i) incrementar el acceso y mejorar la calidad de los servicios de APyS con un enfoque de seguridad hídrica en zonas urbanas y rurales; y (ii) fortalecer las entidades sectoriales para mejorar la gestión y la sostenibilidad de la prestación del servicio.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
SECRETARIA DESARROLLO COMUNITARIO AGUA Y SANAMIENTO
SECRETARIA DESARROLLO COMUNITARIO AGUA Y SANAMIENTO
Inter-American Development Bank
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
WATER AND SANITATION
AGUA Y SANEAMIENTO
458100.0
484200.0
511200.0
537750.0
565650.0
593100.0
620550.0
648000.0
675450.0
702000.0
728100.0
752850.0
776250.0
798750.0
819000.0
837450.0
854100.0
868500.0
879750.0
889200.0
895050.0
898650.0
899100.0
897300.0
891900.0
883800.0
873900.0
860400.0
844650.0
827100.0
807750.0
785700.0
763200.0
738450.0
713250.0
686700.0
659700.0
632250.0
604800.0
576900.0
549900.0
522000.0
495450.0
469350.0
443700.0
418950.0
394650.0
371250.0
349650.0
327600.0
307350.0
288000.0
269550.0
252000.0
235350.0
219600.0
204750.0
190350.0
177750.0
7772300.0
1000000
Disbursement in first quarter of 2024
Contrato - Programa de Agua Potable y Saneamiento en Honduras.pdf
Honduras. Propuesta de préstamo para el _Programa de Agua Potable y Saneamiento.pdf
Programa de Agua Potable y Saneamiento en Honduras.pdf
HO-L1213 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1213_P2083119_GN.pdf
HO-L1213 First period Jan-Jun 2023 - Public Report.PDF
HO-L1213 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1213 First period Jan-Jun 2022 - Public Report.PDF
Honduras. Loan proposal for the Potable Water and Sanitation Program in Honduras.pdf
HO-L1213_P2063967_SP.pdf
HO-L1213 First period Jan-Jun 2021 - Public Report.pdf
Potable Water and Sanitation Program in Honduras.pdf
XI-IATI-IADB-HO-L1216
Inter-American Development Bank
Global Credit Program for Safeguarding the Productive Fabric and Employment
Programa Global de Crédito para la Defensa del Tejido Productivo y el Empleo
The objective of this operation is to support the sustainability in the face of the crisis of COVID-19, of Micro, Small and Medium-sized Enterprises (MSMEs) to maintain employment in Honduras
El objetivo de esta operación es apoyar la sostenibilidad frente a la crisis del COVID-19, de las Micro, Pequeñas y Medianas Empresas (MIPYME) como sostén del empleo en Honduras
INTER AMERICAN DEVELOPMENT BANK
BANCO HONDURENO PARA LA PRODUCCION Y LA VIVIENDA
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
BULEVAR JUAN PABLO II, CONTIGUO A PLAZA COLPROSUMAH, ,HONDURAS ,TEGUCIGALPA, HONDURAS, BULEVAR JUAN PABLO II, CONTIGUO A PLAZA COLPROSUMAH,, BANCO HONDURENO PARA LA PRODUCCION Y LA VIVIENDA, Honduras
13.77306, -87.46222
FINANCIAL MARKETS
MERCADOS FINANCIEROS
292613.6
280438.0
268262.4
255887.2
243911.2
231536.0
219759.6
208182.8
196805.6
185827.6
175049.2
164670.0
155089.2
145308.8
136326.8
127744.0
119560.4
111776.0
104390.8
97404.8
90818.0
84430.8
78842.0
985365.2
15000000
Disbursement in forth quarter of 2020
35630.1
Interest repayment in second quarter of 2021
43541.71
Interest repayment in forth quarter of 2021
45513.28
Interest repayment in second quarter of 2022
106992.45
Interest repayment in forth quarter of 2022
164171.5
Interest repayment in second quarter of 2023
186739.3
Interest repayment in forth quarter of 2023
HO-L1216 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1216_DLP_EEO9_Reglamento de Crédito.docx
HO-L1216_DLP_EEO4_Sistema Financiero de Honduras.docx
HO-L1216 First period Jan-Jun 2021 - Public Report.pdf
HO-L1216_DLP_EEO2_Diagnóstico de la Problemática de la MIPYME.docx
Honduras. HO-L1216. Propuesta de prestamo para el _Programa Global de Credito para la Defensa del Tejido Productivo y el Empleo”.pdf
HO-L1216_DLP_EER2_IGAS.docx
HO-L1216 _DLP_EEO8_Informe de Gestión de BANHPROVI 2019.pdf
HO-L1216 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1216 Second period Jan-Dec 2022 - Public Report.PDF
Honduras. HO-L1216. Loan proposal for the _Global Credit Program for Safeguarding the Productive Fabric and Employment”.pdf
HO-L1216_DLP_EEO5_Resumen Principales Medidas Política.pdf
HO-L1216 First period Jan-Jun 2022 - Public Report.PDF
HO-L1216_DLP_EER1_Plan de monitoreo y evaluacio´n.docx
HO-L1216_DLP_EEO7_Calificación de Riesgo BANHPROVI.pdf
HO-L1216_DLP_EEO3_Referencias Bibliográficas.docx
HO-L1216_DLP_EEO1_Racionalidad de la Viabilidad Económica.docx
HO-L1216 First period Jan-Jun 2023 - Public Report.PDF
HO-L1216_DLP_Anexo IV_SPF Filtro Salvaguardias.pdf
Contrato - Programa Global de Crédito para la Defensa Tejido del Tejido Productivo y el Empleo.pdf
HO-L1216_DLP_EEO6_Vulnerabilidad de sectores productivos ante expansión del COVID-19.docx
XI-IATI-IADB-HO-L1039
Inter-American Development Bank
Support for the Integration of Honduras in the Regional Electricity Market
Apoyo a la Integración de Honduras en el Mercado Eléctrico Regional
The overall objective is to improve the infrastructure of Honduras in order to enable effective participation in the regional electricity integration, improve the reliability and quality service and support the strenghtening and institutional capacity building of ENEE. This will allow Honduras to participate in SIEPAC/MER.
El objetivo general es mejorar las condiciones de infraestructura física de Honduras que le permita una participación efectiva en la integración eléctrica regional, mejorar la confiabilidad y calidad del servicio y apoyar el fortalecimiento de la capacidad institucional de la ENEE que le permita a Honduras una efectiva participación en el SIEPAC/MER; apoyando así a la recuperación operacional y financiera de la Empresa Nacional de Energía Eléctrica (ENEE).
EMPRESA NACIONAL DE ENERGIA ELECTRICA
BLENDED LOANS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Nuevas líneas de distribución terminadas Apoyo a la Integración de Honduras en el Mercado Eléctrico Regional, Honduras
14.824173968, -86.600264243
ENERGY
ENERGIA
600000
Disbursement in third quarter of 2014
1400000
Disbursement in third quarter of 2014
1710000
Disbursement in forth quarter of 2014
3990000
Disbursement in forth quarter of 2014
5390000
Loan repayment in first quarter of 2015
2826.17
Interest repayment in second quarter of 2015
70496.95
Interest repayment in second quarter of 2015
2911.23
Interest repayment in forth quarter of 2015
93660.18
Interest repayment in forth quarter of 2015
900000
Disbursement in forth quarter of 2015
2100000
Disbursement in forth quarter of 2015
3894.82
Interest repayment in second quarter of 2016
123549.64
Interest repayment in second quarter of 2016
1879485
Disbursement in forth quarter of 2016
4385465
Disbursement in forth quarter of 2016
4034.43
Interest repayment in forth quarter of 2016
121610.84
Interest repayment in forth quarter of 2016
6485465
Loan repayment in first quarter of 2017
4000000
Disbursement in second quarter of 2017
215947.16
Interest repayment in second quarter of 2017
258223.03
Interest repayment in forth quarter of 2017
326000
Disbursement in second quarter of 2018
256411.31
Interest repayment in second quarter of 2018
275817.25
Interest repayment in forth quarter of 2018
1639050
Disbursement in forth quarter of 2018
295725.52
Interest repayment in second quarter of 2019
292586.94
Interest repayment in forth quarter of 2019
274676.13
Interest repayment in second quarter of 2020
334395.83
Loan repayment in second quarter of 2020
495953.98
Interest repayment in forth quarter of 2020
668791.66
Loan repayment in forth quarter of 2020
264376.7
Interest repayment in second quarter of 2021
334395.81
Loan repayment in second quarter of 2021
258524.77
Interest repayment in forth quarter of 2021
334395.85
Loan repayment in forth quarter of 2021
248787.52
Interest repayment in second quarter of 2022
334395.83
Loan repayment in second quarter of 2022
247389.9
Interest repayment in forth quarter of 2022
334395.83
Loan repayment in forth quarter of 2022
235244.74
Interest repayment in second quarter of 2023
334395.83
Loan repayment in second quarter of 2023
232800.23
Interest repayment in forth quarter of 2023
334395.83
Loan repayment in forth quarter of 2023
HO-L1039 - Apoyo a la Integración de Honduras en el Mercado Eléctrico Regional (publication) [38248643].PDF
HO-L1039 [39320085].PDF
HO-L1039 Second period Jan-Dec 2019-Public Report.pdf
Anexo_tecnico_integración_regional_HO-L1039__Apoyo_a_la_Integración_de_Honduras_en_el_Mercado_Eléctrico_Regional [38060222].PDF
Informe de Gestion Ambiental y Social (IGAS) HO-L1039 [38082028].docx
HO-L1039 First period Jan-Jun 2019-Public Report.pdf
Plan de Adquisiciones POD HO-L1039 [38029049].xlsx
HO-L1039 First period Jan-Jun 2017-Public Report.pdf
HO-L1039 [39538916].PDF
PCR HO-L1039; HO-G1006.pdf
HO-L1039 [39226389].PDF
Informe de evaluacion tecnica subestacion La Entrada [38029297].docx
HO-L1039 [39383378].PDF
Contrato - Apoyo a la Integración de Honduras en el Mercado Eléctrico Regional [39039521].PDF
HO-L1039 Second period Jan-Dec 2018-Public Report.pdf
HO-L1039 First period Jan-Jun 2020 - Public Report.pdf
HO-L1039 [40251747].PDF
Sistema de Evaluación de la Capacidad Institucional (SECI) [38029371].docx
AUDITORÍA SOCIO-AMBIENTAL HO-L1039 [38029236].docx
HO-L1039 First period Jan-Jun 2021 - Public Report.pdf
Evaluacion Economica HO-L1039 [38029253].docx
HO-L1039 Second period Jan-Dec 2017-Public Report.pdf
HO-L1039 [40281155].PDF
HO-L1039 [40710347].PDF
HO-L1039 [40142642].PDF
HO-L1039 Second period Jan-Dec 2016-Public Report.pdf
M_E HO-L1039 [37958693].doc
Plan Operativo Anual (POA) HO-L1039 [38029339].xlsx
HO-L1039 - Support for the Integration of Honduras in the Regional Electricity Market (publicación) [38248647].PDF
HO-L1039 First period Jan-Jun 2018-Public Report.pdf
HO-L1039 Second period Jan-Dec 2020 - Public Report.pdf
Componente I. Inversión en obras relacionadas con la integración de Honduras al SIEPAC
Componente I. Inversión en obras relacionadas con la integración de Honduras al SIEPAC
Subestación El Progreso Ampliada de 300MVA a 450MVA
Subestación El Progreso Ampliada de 300MVA a 450MVA
Subestación San Nicolás terminada
Subestación San Nicolás terminada
Rehabilitación de líneas de distribución terminadas
Rehabilitación de líneas de distribución terminadas
Subestación Toncontín Etapa 1 Ampliada de 75MVA a 150MVA
Subestación Toncontín Etapa 1 Ampliada de 75MVA a 150MVA
Nuevas líneas de distribución terminadas
Nuevas líneas de distribución terminadas
Componente II. Fortalecimiento de ENEE en comercialización en el MER
Componente II. Fortalecimiento de ENEE en comercialización en el MER
Unidad de Comercialización / Transacciones Eléctricas capacitada
Unidad de Comercialización / Transacciones Eléctricas capacitada
XI-IATI-IADB-HO-L1088
Inter-American Development Bank
Program for integration and urban coexistence
Programa de Integración y Convivencia Urbana
Improve the habitability and environmental conditions of families in circumstances of poverty and risk, through the provision of basic infrastructure and social support services.
Mejorar las condiciones de habitabilidad y socio ambientales de las familias en condiciones de pobreza y de riesgo, mediante la provisión de infraestructura básica y prestación de servicios de apoyo social.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
FONDO HONDURENO DE INVERSION SOCIAL
FONDO HONDURENO DE INVERSION SOCIAL
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Convivencias de integración para líderes comunitarios de las colonias de Zona 1 Programa de Integración y Convivencia Urbana, Honduras
-31.5, -61.13333
URBAN DEVELOPMENT AND HOUSING
DESARROLLO Y VIVIENDA URBANOS
90000
Disbursement in forth quarter of 2013
210000
Disbursement in forth quarter of 2013
210000
Disbursement in second quarter of 2014
490000
Disbursement in second quarter of 2014
131.3
Interest repayment in second quarter of 2014
1416.04
Interest repayment in second quarter of 2014
2250000
Disbursement in forth quarter of 2014
5250000
Disbursement in forth quarter of 2014
401.92
Interest repayment in forth quarter of 2014
4233.11
Interest repayment in forth quarter of 2014
5950000
Loan repayment in first quarter of 2015
3440.76
Interest repayment in second quarter of 2015
92108.93
Interest repayment in second quarter of 2015
1350000
Disbursement in third quarter of 2015
3150000
Disbursement in third quarter of 2015
3150000
Loan repayment in forth quarter of 2015
3945.2
Interest repayment in forth quarter of 2015
109686.04
Interest repayment in forth quarter of 2015
750000
Disbursement in second quarter of 2016
1750000
Disbursement in second quarter of 2016
4876.24
Interest repayment in second quarter of 2016
201001.95
Interest repayment in second quarter of 2016
240000
Disbursement in forth quarter of 2016
560000
Disbursement in forth quarter of 2016
5853.48
Interest repayment in forth quarter of 2016
189508.85
Interest repayment in forth quarter of 2016
189701.65
Interest repayment in second quarter of 2017
900000
Disbursement in second quarter of 2017
198227.9
Interest repayment in forth quarter of 2017
214095.08
Interest repayment in second quarter of 2018
217770.56
Interest repayment in forth quarter of 2018
216580.57
Interest repayment in second quarter of 2019
250833.33
Loan repayment in second quarter of 2019
213344.33
Interest repayment in forth quarter of 2019
250833.33
Loan repayment in forth quarter of 2019
208400.24
Interest repayment in second quarter of 2020
250833.33
Loan repayment in second quarter of 2020
204005.21
Interest repayment in forth quarter of 2020
250833.33
Loan repayment in forth quarter of 2020
204006.58
Interest repayment in second quarter of 2021
250833.33
Loan repayment in second quarter of 2021
201167.52
Interest repayment in forth quarter of 2021
250833.33
Loan repayment in forth quarter of 2021
195565.1
Interest repayment in second quarter of 2022
250833.33
Loan repayment in second quarter of 2022
192111.72
Interest repayment in forth quarter of 2022
250833.33
Loan repayment in forth quarter of 2022
184290.97
Interest repayment in second quarter of 2023
250833.33
Loan repayment in second quarter of 2023
180603.58
Interest repayment in forth quarter of 2023
250833.33
Loan repayment in forth quarter of 2023
Plan de Adquisiciones (PA) (HO-L1088) [37132264].xls
Reglamento Operativo del Programa (ROP) (HO-L1088) [37146599].docx
Relatório para publicação_PMR-_HO-L1088-2013-1º-Período [38265528].PDF
HO-L1088 Second period Jan-Dec 2017-Public Report.pdf
Integration and Urban Coexistence Program [37309913].PDF
Programa de Integración y Convivencia Urbana [37309927].PDF
Nota Explicativa del Indice de Marginacion (HO-L1088) [37132272].docx
HO-L1088 [39002021].PDF
Evaluacion Economica del Programa (HO-L1088) [37132270].docx
Rapport pour Publication_PMR-_HO-L1088-2012-2º-Período [37873974].PDF
Informe de Gestion Ambiental y Social (IGAS) (HO-L1088 [37132269].doc
Plan de Monitoreo y Evaluacion_ (HO-L1088) [37132255].docx
HO-L1088 Second period Jan-Dec 2015-Public Report [40377519].PDF
Raking de Marginacion de San Pedro de Sula (HO-L1088 [37132276].xlsx
Report for Publication_PMR-_HO-L1088-2013-1º-Period [38267531].PDF
HO-L1088 [39002026].PDF
Plan Operativo Anual (POA) (HO-L1088) [37132260].xlsx
HO-L1088 Second period Jan-Dec 2016-Public Report.pdf
HO-L1088 First period Jan-Jun 2014-Public Report [40182080].PDF
Ranking de Marginacion del Distrito Central (HO-L1088) [37132274].xlsx
Plan de Gestion Ambiental y Social (PGAS) (HO-L1088) [37132287].doc
Presupuesto Detallado del Programa (HO-L1088) [37132285].xlsx
HO-L1088 [38925112].PDF
HO-L1088 Second period Jan-Dec 2014-Public Report [40185556].PDF
Relatório para publicação_PMR-_HO-L1088-2012-2º-Período [37873306].PDF
Ranking de Marginacion de la Ceiba (HO-L1088) [37132278].xlsx
HO-L1088 First period Jan-Jun 2016-Public Report [40799122].PDF
HO-L1088 [38925109].PDF
HO-L1088 [38990073].PDF
Filtros Ambientales (HO-L1088) [37132203].docx
HO-L1088 [38990081].PDF
Informe para Publicación_PMR-_HO-L1088-2013-1º-Periodo [38266857].PDF
Plan de Ejecucion del Programa (PEP) [37146780].PDF
Contrato Parte I - Programa de Integración y Convivencia Urbana [37891988].PDF
HO-L1088 First period Jan-Jun 2017-Public Report.pdf
Rapport pour Publication_PMR-_HO-L1088-2013-1º-Período [38266192].PDF
Mejora en la convivencia social
Mejora en la convivencia social
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Convivencias de integración para líderes comunitarios de las colonias de Zona 1
Convivencias de integración para líderes comunitarios de las colonias de Zona 1
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Eventos recreativos para niños de las colonias de la Zona 1
Eventos recreativos para niños de las colonias de la Zona 1
Eventos recreativos para niños de la zona 2
Eventos recreativos para niños de la zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Curso de capacitación laboral en colonias de la Zona 1
Curso de capacitación laboral en colonias de la Zona 1
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 2
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Convivencias de integración para líderes comunitarios de las colonias de Zona 2
Convivencias de integración para líderes comunitarios de las colonias de Zona 2
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Talleres capacitación laboral en colonias de la Zona 2 que incluye los barrios: David Betancourt, Arcieri (1 y 2), Ramón Amaya Amador y Montes de Bendición
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Convivencias de integración y convivencia para jóvenes de las colonias de Zona 1
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres de capacitación laboral en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Talleres sobre valores, liderazgo, convivencia comunitaria y prevención de violencia en colonias de la Zona 1 que incluye los barrios: San Juan del Norte (1 y 2), Buenas Nuevas, Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Proyectos de integración urbana
Proyectos de integración urbana
Proyectos de Integración Urbana en Zona 1, Lote 2 que incluye los barrios: Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Proyectos de Integración Urbana en Zona 1, Lote 2 que incluye los barrios: Brisas de la Laguna, Las Pavas y Alemania (1 y 2)
Proyectos de integración urbana en la Zona 2 que incluye los barrios: David Betancourt, Arcieri, Ramón Amaya Amador y Montes de Bendición
Proyectos de integración urbana en la Zona 2 que incluye los barrios: David Betancourt, Arcieri, Ramón Amaya Amador y Montes de Bendición
Proyectos de Integración Urbana en Zona 1, Lote 1 que incluye barrios: San Juan del Norte 1 y 2, Buenas Nuevas
Proyectos de Integración Urbana en Zona 1, Lote 1 que incluye barrios: San Juan del Norte 1 y 2, Buenas Nuevas
XI-IATI-IADB-HO0219
Inter-American Development Bank
Financial Sector Program
Programa Sectorial Financiero
EN
El objetivo general del programa es contribuir al desarrollo del sector financiero de Honduras, apoyando al Gobierno en la creación de las condiciones para el mantenimiento de la solvencia y estabilidad del sistema bancario.
SECRETARIA DE FINANZAS
Fund for Special Operations
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
15000000
Disbursement in forth quarter of 2004
19000
Disbursement in forth quarter of 2004
49735.3
Interest repayment in first quarter of 2005
21000
Disbursement in first quarter of 2005
21000
Disbursement in second quarter of 2005
21000
Disbursement in third quarter of 2005
75870.44
Interest repayment in forth quarter of 2005
21000
Disbursement in forth quarter of 2005
74841.4
Interest repayment in first quarter of 2006
21000
Disbursement in first quarter of 2006
21000
Disbursement in second quarter of 2006
76293.89
Interest repayment in third quarter of 2006
21000
Disbursement in third quarter of 2006
21000
Disbursement in forth quarter of 2006
780.17
Interest repayment in first quarter of 2007
21000
Disbursement in first quarter of 2007
153353.47
Interest repayment in second quarter of 2007
21000
Disbursement in second quarter of 2007
1005.12
Interest repayment in third quarter of 2007
21000
Disbursement in third quarter of 2007
9750000
Disbursement in first quarter of 2008
19265.05
Interest repayment in first quarter of 2008
50177.7
Interest repayment in forth quarter of 2008
49425.34
Interest repayment in first quarter of 2009
50315.18
Interest repayment in third quarter of 2009
49494.82
Interest repayment in second quarter of 2010
50315.18
Interest repayment in third quarter of 2010
49494.82
Interest repayment in first quarter of 2011
50315.18
Interest repayment in third quarter of 2011
49701.78
Interest repayment in first quarter of 2012
50177.7
Interest repayment in third quarter of 2012
49425.34
Interest repayment in first quarter of 2013
50315.18
Interest repayment in third quarter of 2013
49494.82
Interest repayment in first quarter of 2014
100630.36
Interest repayment in third quarter of 2014
166350
Loan repayment in third quarter of 2014
97339.82
Interest repayment in first quarter of 2015
166350
Loan repayment in first quarter of 2015
97276.01
Interest repayment in third quarter of 2015
166350
Loan repayment in third quarter of 2015
94433.38
Interest repayment in first quarter of 2016
166350
Loan repayment in first quarter of 2016
93665.05
Interest repayment in third quarter of 2016
166350
Loan repayment in third quarter of 2016
90613.12
Interest repayment in first quarter of 2017
166350
Loan repayment in first quarter of 2017
90567.32
Interest repayment in third quarter of 2017
166350
Loan repayment in third quarter of 2017
87431.73
Interest repayment in first quarter of 2018
166350
Loan repayment in first quarter of 2018
87185.64
Interest repayment in third quarter of 2018
166349.99
Loan repayment in third quarter of 2018
.01
Loan repayment in third quarter of 2018
84122.97
Interest repayment in first quarter of 2019
166350
Loan repayment in first quarter of 2019
83849.51
Interest repayment in third quarter of 2019
166350
Loan repayment in third quarter of 2019
81179.57
Interest repayment in first quarter of 2020
166350
Loan repayment in first quarter of 2020
80257.06
Interest repayment in third quarter of 2020
166350
Loan repayment in third quarter of 2020
77433.03
Interest repayment in first quarter of 2021
166350
Loan repayment in first quarter of 2021
77149.94
Interest repayment in third quarter of 2021
166350
Loan repayment in third quarter of 2021
74242.23
Interest repayment in first quarter of 2022
166350
Loan repayment in first quarter of 2022
73795.59
Interest repayment in third quarter of 2022
166350
Loan repayment in third quarter of 2022
70942.58
Interest repayment in first quarter of 2023
166350
Loan repayment in first quarter of 2023
70441.25
Interest repayment in third quarter of 2023
166350
Loan repayment in third quarter of 2023
Financial Sector Program [416313].PDF
XI-IATI-IADB-HO-L1215
Inter-American Development Bank
Emergency Program for Macroeconomic and Fiscal Sustainability
Programa de Emergencia para la Sostenibilidad Macroeconomica y Fiscal
The objective of the program is to support the policies that the Government of Honduras is implementing to address the COVID-19 pandemic, with a view to preserve macroeconomic stability and fiscal sustainability.
El objetivo del programa es apoyar las politicas que el Gobierno de Honduras está implementando para enfrentar la pandemia del COVID-19, con miras a preservar la estabilidad macroeconómica y la sostenibilidad fiscal.
SECRETARIA DE FINANZAS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
76200000
Disbursement in forth quarter of 2020
334174.84
Interest repayment in second quarter of 2021
375804.82
Interest repayment in forth quarter of 2021
383299.57
Interest repayment in second quarter of 2022
700281.92
Interest repayment in forth quarter of 2022
988195.66
Interest repayment in second quarter of 2023
1105395.96
Interest repayment in forth quarter of 2023
3333750
Loan repayment in forth quarter of 2023
Contrato - Honduras - Programa de Emergencia para la Sostenibilidad Macroeconómica y Fiscal.pdf
Honduras. Loan proposal for the Emergency Program for Macroeconomic and Fiscal Sustainability.pdf
Honduras. Propuesta de préstamo para el Programa de Emergencia para la Sostenibilidad Macroeconómica y Fiscal.pdf
XI-IATI-IADB-HO0223
Inter-American Development Bank
Public Management Reform Program
Programa de Reforma de la Gestión Pública
The program would have the following action areas: support the implementation of strategies which would allow formal planning mechanisms for public investment, and follow-up and evaluation of public sector budget execution; (ii) support institutional reform to improve public finance information, simplify processes and reorganize the functional competencies at the Ministry of Finance; (iii) support high quality management training to enable human resources to identify new and efficient practices to lead changes in public resource management; y (iv) support the development and implementation of information and technical requirements requested by the economic cabinet for improved performance. Likewise, there would be support for administrative reforms in the institutions responsible for revenue collection, and for analysis of potential tax policy reform, which could be part of a fiscal pact for the country.
El programa está dirigido a mejorar la eficiencia y eficacia de las instituciones del sector público en el gestión de los recursos. En particular, se busca apoyar el proceso de reforma de la administración financiera del Estado que esta liderando la Secretaría de Finanzas, tanto por el lado de la gestión del gasto como de la recolección y registro de los ingresos.
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS, HONDURAS
Fund for Special Operations
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
15000000
Disbursement in forth quarter of 2006
34000
Disbursement in forth quarter of 2006
38000
Disbursement in first quarter of 2007
38000
Disbursement in second quarter of 2007
111037.32
Interest repayment in third quarter of 2007
38000
Disbursement in third quarter of 2007
38000
Disbursement in forth quarter of 2007
75508.94
Interest repayment in first quarter of 2008
38000
Disbursement in first quarter of 2008
38000
Disbursement in second quarter of 2008
14700000
Disbursement in third quarter of 2008
27247.16
Interest repayment in third quarter of 2008
9215.82
Interest repayment in third quarter of 2008
13804.06
Interest repayment in third quarter of 2008
101.57
Interest repayment in third quarter of 2008
53136.37
Interest repayment in third quarter of 2008
38000
Disbursement in third quarter of 2008
148502.46
Interest repayment in first quarter of 2009
151232.88
Interest repayment in third quarter of 2009
4458.62
Interest repayment in first quarter of 2010
96.18
Interest repayment in first quarter of 2010
80
Interest repayment in first quarter of 2010
144172.32
Interest repayment in second quarter of 2010
151232.88
Interest repayment in third quarter of 2010
148767.12
Interest repayment in first quarter of 2011
151232.88
Interest repayment in third quarter of 2011
149427.35
Interest repayment in first quarter of 2012
150819.67
Interest repayment in third quarter of 2012
148520.09
Interest repayment in first quarter of 2013
151232.88
Interest repayment in third quarter of 2013
148767.12
Interest repayment in first quarter of 2014
151232.88
Interest repayment in third quarter of 2014
148767.12
Interest repayment in first quarter of 2015
151232.88
Interest repayment in third quarter of 2015
149427.35
Interest repayment in first quarter of 2016
150819.67
Interest repayment in third quarter of 2016
297040.2
Interest repayment in first quarter of 2017
500000
Loan repayment in first quarter of 2017
297424.66
Interest repayment in third quarter of 2017
500000
Loan repayment in third quarter of 2017
287616.44
Interest repayment in first quarter of 2018
500000
Loan repayment in first quarter of 2018
287342.47
Interest repayment in third quarter of 2018
500000
Loan repayment in third quarter of 2018
277698.63
Interest repayment in first quarter of 2019
500000
Loan repayment in first quarter of 2019
277260.27
Interest repayment in third quarter of 2019
500000
Loan repayment in third quarter of 2019
268969.23
Interest repayment in first quarter of 2020
500000
Loan repayment in first quarter of 2020
266448.09
Interest repayment in third quarter of 2020
500000
Loan repayment in third quarter of 2020
257380.19
Interest repayment in first quarter of 2021
500000
Loan repayment in first quarter of 2021
257068.49
Interest repayment in third quarter of 2021
500000
Loan repayment in third quarter of 2021
247945.21
Interest repayment in first quarter of 2022
500000
Loan repayment in first quarter of 2022
246958.9
Interest repayment in third quarter of 2022
500000
Loan repayment in third quarter of 2022
238027.4
Interest repayment in first quarter of 2023
500000
Loan repayment in first quarter of 2023
236931.51
Interest repayment in third quarter of 2023
500000
Loan repayment in third quarter of 2023
229121.94
Interest repayment in first quarter of 2024
500000
Loan repayment in first quarter of 2024
Honduras_ Public Management Reform Program [767680].PDF
Programa de Reforma de la Gestión Pública [751118].PDF
Programa de Reforma de la Gestión Pública [578047].DOC
Programa de Reforma de la Gestión Pública [578009].DOC
HONDURAS_ Programa de Reforma de la Gestión Pública_ Informe de Terminación de Proyecto (PCR) [35831002].PDF
Programa de Reforma de la Gestión Pública [578051].DOC
Programa de Reforma de la Gestión Pública [758531].PDF
XI-IATI-IADB-HO0212
Inter-American Development Bank
Poverty Reduction Sector Program
Programa Sectorial Reducción de Pobreza
Sectorial loan program in two tranches of US$15 millions each. The Program has three components: (i) institute at the highest levels the culture of planning based on results and monitor the projects seeking for intermediate goals; (ii) establish the mechanism for a continuous definition and evaluation of priority programs related with the PRSP; and (iii) solve key problems in management and supervision.
Fund for Special Operations
SECRETARIA DE FINANZAS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SOCIAL INVESTMENT
INVERSIONES SOCIALES
15000000
Disbursement in third quarter of 2004
36000
Disbursement in third quarter of 2004
33000
Disbursement in forth quarter of 2004
85160.48
Interest repayment in first quarter of 2005
33000
Disbursement in first quarter of 2005
33000
Disbursement in second quarter of 2005
76193.01
Interest repayment in third quarter of 2005
33000
Disbursement in third quarter of 2005
33000
Disbursement in forth quarter of 2005
75277.23
Interest repayment in first quarter of 2006
33000
Disbursement in first quarter of 2006
33000
Disbursement in second quarter of 2006
76858.44
Interest repayment in third quarter of 2006
33000
Disbursement in third quarter of 2006
14700000
Disbursement in forth quarter of 2006
368.7
Interest repayment in first quarter of 2007
7632.13
Interest repayment in first quarter of 2007
202123.72
Interest repayment in first quarter of 2007
69120.86
Interest repayment in second quarter of 2007
75268.6
Interest repayment in third quarter of 2007
74363.28
Interest repayment in first quarter of 2008
75062.95
Interest repayment in third quarter of 2008
73925.16
Interest repayment in first quarter of 2009
75268.6
Interest repayment in third quarter of 2009
74041.4
Interest repayment in first quarter of 2010
75268.6
Interest repayment in third quarter of 2010
74041.4
Interest repayment in first quarter of 2011
75268.6
Interest repayment in third quarter of 2011
74363.28
Interest repayment in first quarter of 2012
75062.95
Interest repayment in third quarter of 2012
73925.16
Interest repayment in first quarter of 2013
75268.6
Interest repayment in third quarter of 2013
74041.4
Interest repayment in first quarter of 2014
150537.21
Interest repayment in third quarter of 2014
248850
Loan repayment in third quarter of 2014
145614.75
Interest repayment in first quarter of 2015
248850
Loan repayment in first quarter of 2015
145519.3
Interest repayment in third quarter of 2015
248850
Loan repayment in third quarter of 2015
141276.6
Interest repayment in first quarter of 2016
248850
Loan repayment in first quarter of 2016
140103.91
Interest repayment in third quarter of 2016
248850
Loan repayment in third quarter of 2016
135529.46
Interest repayment in first quarter of 2017
248850
Loan repayment in first quarter of 2017
135456.21
Interest repayment in third quarter of 2017
248850
Loan repayment in third quarter of 2017
130806.47
Interest repayment in first quarter of 2018
248850
Loan repayment in first quarter of 2018
130465.58
Interest repayment in third quarter of 2018
248850
Loan repayment in third quarter of 2018
125870.38
Interest repayment in first quarter of 2019
248850
Loan repayment in first quarter of 2019
125447.67
Interest repayment in third quarter of 2019
248850
Loan repayment in third quarter of 2019
121460.04
Interest repayment in first quarter of 2020
248850
Loan repayment in first quarter of 2020
120059.92
Interest repayment in third quarter of 2020
248850
Loan repayment in third quarter of 2020
115802.48
Interest repayment in first quarter of 2021
248850
Loan repayment in first quarter of 2021
115411.86
Interest repayment in third quarter of 2021
248850
Loan repayment in third quarter of 2021
111034.83
Interest repayment in first quarter of 2022
248850
Loan repayment in first quarter of 2022
110380.31
Interest repayment in third quarter of 2022
248850
Loan repayment in third quarter of 2022
106126
Interest repayment in first quarter of 2023
248850
Loan repayment in first quarter of 2023
105348.77
Interest repayment in third quarter of 2023
248850
Loan repayment in third quarter of 2023
Poverty Reduction Support Program [416319].PDF
XI-IATI-IADB-HO-L1104
Inter-American Development Bank
Regional Road Integration Program and Proposed Reformulation of Loan 2470/BL-HO
Programa de Integración Vial Regional y Propuesta de Reformulación de 2470/BL-HO
The overall objective of the program is to promote physical integration and road connectivity of El Salvador. The specific objectives are to improve the conditions of transporting people and goods in the CPM, besides being a cargo trunk corridor regional competitiveness. To achieve these objectives, the program includes the rehabilitation and improvement of sections located on the CPM.
El objetivo general del programa es contribuir a la mejora de la integración física regional y la conectividad vial de Honduras. Los objetivos específicos son el mejoramiento de las condiciones de transporte de personas y mercancías en el CPM, además de constituir un corredor troncal de carga de competitividad regional. Para lograr estos objetivos propuestos, el programa incluye la rehabilitación y mejoramiento de tramos localizados sobre el CPM.
BLENDED LOANS
INVERSION ESTRATEGICA DE HONDURAS INVESTH
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Otras Adquisiciones Realizadas Programa de Integración Vial Regional y Propuesta de Reformulación de 2470/BL-HO, Honduras
14.824173968, -86.600264243
TRANSPORT
TRANSPORTE
97600.0
91000.0
84600.0
79000.0
1002041.52
54476.8
Disbursement in third quarter of 2016
81715.2
Disbursement in third quarter of 2016
10986.8
Disbursement in forth quarter of 2016
16480.2
Disbursement in forth quarter of 2016
619.27
Interest repayment in first quarter of 2017
259622.46
Disbursement in second quarter of 2017
2064.75
Interest repayment in third quarter of 2017
133200
Disbursement in forth quarter of 2017
3589.54
Interest repayment in first quarter of 2018
260000
Disbursement in second quarter of 2018
6434.5
Interest repayment in third quarter of 2018
572656
Disbursement in forth quarter of 2018
11518.98
Interest repayment in forth quarter of 2018
150609
Disbursement in second quarter of 2019
16278.52
Interest repayment in third quarter of 2019
3000000
Disbursement in forth quarter of 2019
28059.02
Interest repayment in first quarter of 2020
34317.01
Interest repayment in third quarter of 2020
13045000
Disbursement in forth quarter of 2020
28982.69
Interest repayment in first quarter of 2021
145125.51
Interest repayment in third quarter of 2021
2415253.54
Disbursement in third quarter of 2021
163512.26
Interest repayment in first quarter of 2022
250000
Loan repayment in first quarter of 2022
164882.1
Interest repayment in third quarter of 2022
250000
Loan repayment in third quarter of 2022
164281.33
Interest repayment in first quarter of 2023
250000
Loan repayment in first quarter of 2023
151336.87
Interest repayment in third quarter of 2023
233501.17
Loan repayment in third quarter of 2023
142758.95
Interest repayment in first quarter of 2024
230385.73
Loan repayment in first quarter of 2024
HO-L1104 Second period Jan-Dec 2017-Public Report.pdf
HO-L1104 First period Jan-Jun 2021 - Public Report.pdf
PCR Programa de integracion vial regional (HO-L1037 y L1104)_vf.pdf
HO-L1104 Second period Jan-Dec 2015-Public Report [40377555].PDF
HO-L1104 First period Jan-Jun 2020 - Public Report.pdf
HO-L1104 First period Jan-Jun 2022 - Public Report.PDF
HO-L1104 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1104 First period Jan-Jun 2017-Public Report.pdf
HO-L1104 Second period Jan-Dec 2018-Public Report.pdf
HO-L1104_P577999_SP.pdf
HO-L1104 First period Jan-Jun 2018-Public Report.pdf
HO-L1104 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1104 First period Jan-Jun 2019-Public Report.pdf
HO-L1104 Second period Jan-Dec 2019-Public Report.pdf
HO-L1104 First period Jan-Jun 2016-Public Report [40799135].PDF
HO-L1104 Second period Jan-Dec 2021 - Public Report.PDF
COMPONENTE 2. Fortalecimiento Institucional
COMPONENTE 2. Fortalecimiento Institucional
Otras Adquisiciones Realizadas
Otras Adquisiciones Realizadas
Unidad de Concesiones Fortalecida
Unidad de Concesiones Fortalecida
COMPONENTE 3. Mantenimiento
COMPONENTE 3. Mantenimiento
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
km de caminos secundarios y/o
vecinales que alimentan el CPM
intervenidos con microempresas de
mantenimiento (Intervencion anual en mismos tramos)
Componene 1: Obras civiles y supervisión
Componene 1: Obras civiles y supervisión
km de carretera del Tramo II Jícaro
Galán-Choluteca (CA-1)
Rehabilitados por el programa
km de carretera del Tramo II Jícaro
Galán-Choluteca (CA-1)
Rehabilitados por el programa
km de carretera del Tramo III
Choluteca-Guasaule (CA-3)
rehabilitados por el programa
km de carretera del Tramo III
Choluteca-Guasaule (CA-3)
rehabilitados por el programa
km de carretera del Tramo II Jícaro
Galán-Choluteca (CA-1)
Rehabilitados por el programa
km de carretera del Tramo II Jícaro
Galán-Choluteca (CA-1)
Rehabilitados por el programa
km de carretera del Tramo I El
Amatillo-Jícaro Galán (CA-1)
Rehabilitados por el programa
km de carretera del Tramo I El
Amatillo-Jícaro Galán (CA-1)
Rehabilitados por el programa
XI-IATI-IADB-HO-L1002
Inter-American Development Bank
Improvement of Health Conditions in Honduras
Mejoramiento del Nivel de Salud en Honduras
The objective is to reduce maternal and infant mortality and malnutrition, which is a goal of both the country's poverty reduction strategy and the UN Millenium Development Goals. The project contains service delivery elements and support for strengthening primary care services in areas that are direct causes of malnutrition and mortality.
La operación espera contribuir a una reducción de los indicadores de desnutrición y mortalidad materno-infantil que vayan alineados a las metas intermedias y finales de la ERP.
SECRETARIA DE SALUD
Fund for Special Operations
INTER AMERICAN DEVELOPMENT BANK
GO CONSULTORES S. DE R.L.
GO CONSULTORES S. DE R.L.
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
HEALTH
SALUD
10000
Disbursement in second quarter of 2006
13000
Disbursement in third quarter of 2006
27.12
Interest repayment in forth quarter of 2006
13000
Disbursement in forth quarter of 2006
13000
Disbursement in first quarter of 2007
3300000
Disbursement in second quarter of 2007
151.72
Interest repayment in second quarter of 2007
13000
Disbursement in second quarter of 2007
13000
Disbursement in third quarter of 2007
15924.52
Interest repayment in forth quarter of 2007
13000
Disbursement in forth quarter of 2007
13000
Disbursement in first quarter of 2008
16934.02
Interest repayment in second quarter of 2008
13000
Disbursement in second quarter of 2008
13000
Disbursement in third quarter of 2008
17042.65
Interest repayment in forth quarter of 2008
13000
Disbursement in forth quarter of 2008
13000
Disbursement in first quarter of 2009
17103.03
Interest repayment in second quarter of 2009
13000
Disbursement in second quarter of 2009
34632.57
Interest repayment in second quarter of 2010
25851.94
Disbursement in third quarter of 2010
1503916
Disbursement in forth quarter of 2010
3384213
Disbursement in forth quarter of 2010
17421.39
Interest repayment in forth quarter of 2010
4985567.58
Disbursement in first quarter of 2011
41939.61
Interest repayment in second quarter of 2011
68240.15
Interest repayment in forth quarter of 2011
66913.79
Interest repayment in first quarter of 2012
3234451.48
Disbursement in second quarter of 2012
79730.2
Interest repayment in forth quarter of 2012
82665.73
Interest repayment in second quarter of 2013
83227.4
Interest repayment in forth quarter of 2013
82772.6
Interest repayment in second quarter of 2014
83227.4
Interest repayment in forth quarter of 2014
82772.6
Interest repayment in second quarter of 2015
166454.79
Interest repayment in forth quarter of 2015
276666.66
Loan repayment in forth quarter of 2015
163428.34
Interest repayment in second quarter of 2016
276666.68
Loan repayment in second quarter of 2016
160466.67
Interest repayment in forth quarter of 2016
276666.66
Loan repayment in forth quarter of 2016
157019.54
Interest repayment in second quarter of 2017
276666.68
Loan repayment in second quarter of 2017
155357.81
Interest repayment in forth quarter of 2017
276666.67
Loan repayment in forth quarter of 2017
151673.97
Interest repayment in second quarter of 2018
276666.67
Loan repayment in second quarter of 2018
149794.15
Interest repayment in forth quarter of 2018
276666.67
Loan repayment in forth quarter of 2018
146140.64
Interest repayment in second quarter of 2019
276666.67
Loan repayment in second quarter of 2019
144230.5
Interest repayment in forth quarter of 2019
276666.67
Loan repayment in forth quarter of 2019
141281.67
Interest repayment in second quarter of 2020
276666.67
Loan repayment in second quarter of 2020
138333.33
Interest repayment in forth quarter of 2020
276666.67
Loan repayment in forth quarter of 2020
135020.71
Interest repayment in second quarter of 2021
276666.67
Loan repayment in second quarter of 2021
133163.84
Interest repayment in forth quarter of 2021
276666.67
Loan repayment in forth quarter of 2021
129646.75
Interest repayment in second quarter of 2022
276666.67
Loan repayment in second quarter of 2022
127615.34
Interest repayment in forth quarter of 2022
276666.67
Loan repayment in forth quarter of 2022
124113.43
Interest repayment in second quarter of 2023
276666.67
Loan repayment in second quarter of 2023
122006.22
Interest repayment in forth quarter of 2023
276666.67
Loan repayment in forth quarter of 2023
Relatório para publicação_PMR-_HO-L1002-2010-2º-Período [36310277].PDF
Informe para Publicación_PMR-_HO-L1002-2011-1º-Periodo [36625175].PDF
Report for Publication_PMR-_HO-L1002-2011-2º-Period [36928013].PDF
EQUIPAMIENTO PARA CLÍNICAS MATERNO INFANTIL Y HOGARES MATERNOS [35769329].PDF
Rapport pour Publication_PMR-_HO-L1002-2010-2º-Período [36312177].PDF
Rapport pour Publication_PMR-_HO-L1002-2012-1º-Período [37352840].PDF
Relatório para publicação_PMR-_HO-L1002-2011-1º-Período [36624040].PDF
Contrato Modificatorio - Mejoramiento del Nivel de Salud en Honduras.pdf
Improvement of Health Conditions in Honduras [504461].PDF
Rapport pour Publication_PMR-_HO-L1002-2011-2º-Período [36922689].PDF
Report for Publication_PMR-_HO-L1002-2010-2º-Period [36313339].PDF
Informe para Publicación_PMR-_HO-L1002-2012-1º-Periodo [37353497].PDF
Report for Publication_PMR-_HO-L1002-2012-1º-Period [37354159].PDF
Informe para Publicación_PMR-_HO-L1002-2011-2º-Periodo [36925274].PDF
Informe para Publicación_PMR-_HO-L1002-2010-2º-Periodo [36312765].PDF
Relatório para publicação_PMR-_HO-L1002-2012-1º-Período [37352177].PDF
Mejoramiento del Nivel de Salud en Honduras [504463].PDF
Rapport pour Publication_PMR-_HO-L1002-2011-1º-Período [36624621].PDF
Report for Publication_PMR-_HO-L1002-2011-1º-Period [36625738].PDF
Relatório para publicação_PMR-_HO-L1002-2011-2º-Período [36918681].PDF
XI-IATI-IADB-HO-L1093
Inter-American Development Bank
Social Protection System Support Program I
Programa de Apoyo al Sistema de Protección Social I
The overall objective of the program is to foster the accumulation of human capital in families in extreme poverty. The specific objectives are: (i) promote the formation of human capital through the use of education services, health and nutrition, (ii) support the consumption of beneficiary households, (iii) strengthen and consolidate processes to increase efficiency, and (iv) support the strengthening of Ministry of Social Development by supporting the design and implementation of the "Estrategia Vivir Mejor"(EVM)
El objetivo general del programa es fomentar la acumulación de capital humano en las familias en situación de pobreza extrema. Los objetivos específicos son: (i) promover la formación de capital humano a través del aumentoar del uso de servicios de educación, salud y nutrición; (ii) apoyar el consumo de las familias beneficiarias; (iii) fortalecer y consolidar los procesos operativos para aumentar la eficiencia en la gestión del BVM; y (iv) apoyar el fortalecimiento del rol rector de la SDS mediante el apoyo al diseño e implementación de la EVM.
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Centros de Educación Básica con Instalaciones de Tercer Ciclo Construidas Programa de Apoyo al Sistema de Protección Social I, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
6000000
Disbursement in forth quarter of 2015
14000000
Disbursement in forth quarter of 2015
4469.24
Interest repayment in second quarter of 2016
74890.42
Interest repayment in second quarter of 2016
8700000
Disbursement in third quarter of 2016
7500
Interest repayment in third quarter of 2016
20300000
Disbursement in third quarter of 2016
131963.38
Interest repayment in third quarter of 2016
34300000
Loan repayment in forth quarter of 2016
585654.17
Interest repayment in first quarter of 2017
25000000
Disbursement in second quarter of 2017
687534.13
Interest repayment in third quarter of 2017
20000000
Disbursement in first quarter of 2018
800522.53
Interest repayment in first quarter of 2018
31500000
Loan repayment in second quarter of 2018
1140335.37
Interest repayment in forth quarter of 2018
5000000
Disbursement in forth quarter of 2018
1375766.22
Interest repayment in second quarter of 2019
5000000
Disbursement in third quarter of 2019
1289789.13
Interest repayment in forth quarter of 2019
4500000
Disbursement in first quarter of 2020
1341900.03
Interest repayment in second quarter of 2020
1313535.52
Interest repayment in forth quarter of 2020
1370000
Disbursement in forth quarter of 2020
1329753.47
Interest repayment in first quarter of 2021
1398562.61
Interest repayment in forth quarter of 2021
1602270.83
Loan repayment in forth quarter of 2021
1377130.78
Interest repayment in second quarter of 2022
1595367.74
Loan repayment in second quarter of 2022
1353824.53
Interest repayment in third quarter of 2022
1595367.74
Loan repayment in third quarter of 2022
1309038.93
Interest repayment in first quarter of 2023
1595367.74
Loan repayment in first quarter of 2023
1279000.4
Interest repayment in third quarter of 2023
1595367.74
Loan repayment in third quarter of 2023
HO-L1093 [40710159].PDF
Social Protection System Support Program [39234312].PDF
Enlace - Estrategia de extensión de cobertura del tercer ciclo [38769796].docx
HO-L1093 Second period Jan-Dec 2020 - Public Report.pdf
Enlace - Análisis Institucional de la SEDIS [38770793].docx
HO-L1093 Second period Jan-Dec 2014-Public Report [40185544].PDF
HO-L1093 [40681618].PDF
HO-L1093 [40418963].PDF
HO-L1093 [40682109].PDF
HO-L1093 1194 1.pdf
HO-L1093 [40484487].PDF
Programa de Apoyo al Sistema de Protección Social [39234310].PDF
HO-L1093 [40207892].PDF
HO-L1093 First period Jan-Jun 2020 - Public Report.pdf
PCR Aprobado - Programa de Apoyo al Sistema de Proteccion Social I (HO-L1093).pdf
HO-L1093 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1093 Second period Jan-Dec 2017-Public Report.pdf
HO-L1093 Second period Jan-Dec 2018-Public Report.pdf
Filtros Ambientales [39213328].docx
HO-L1093 Second period Jan-Dec 2021 - Public Report.PDF
Enlace - Análisis Económico [38725038].docx
HO-L1093 First period Jan-Jun 2021 - Public Report.pdf
HO-L1093 First period Jan-Jun 2018-Public Report.pdf
Enlace - POA [38726214].docx
Enlace - Monitoreo y Evaluación [38725044].docx
Enlace opcional - Nota Multisectorial de Inclusión Social [39155279].docx
HO-L1093 First period Jan-Jun 2019-Public Report.pdf
HO-L1093 [40718515].PDF
HO-L1093 First period Jan-Jun 2016-Public Report [40799124].PDF
Enlace - IGAS [38769806].doc
HO-L1093 Second period Jan-Dec 2015-Public Report [40377526].PDF
Enlace opcional - Análisis institucional SECI [39155376].docx
HO-L1093 First period Jan-Jun 2022 - Public Report.PDF
Enlace - Plan de Adquisiciones [38771690].xlsx
Contrato - Programa de Apoyo al Sistema de Protección Social_ [40013848].PDF
HO-L1093 First period Jan-Jun 2015-Public Report [40193993].PDF
HO-L1093 Second period Jan-Dec 2016-Public Report.pdf
HO-L1093 Second period Jan-Dec 2019-Public Report.pdf
HO-L1093 First period Jan-Jun 2017-Public Report.pdf
COMPONENTE 1. Transferencias Monetarias Condicionadas
COMPONENTE 1. Transferencias Monetarias Condicionadas
Número de personas en hogares que reciben transferencias monetarias
Número de personas en hogares que reciben transferencias monetarias
Número de personas en hogares que reciben transferencias monetarias
Número de personas en hogares que reciben transferencias monetarias
COMPONENTE 2. Fortalecimiento de la oferta de servicios de tercer ciclo de educación básica con énfasis en zonas rurales focalizadas
COMPONENTE 2. Fortalecimiento de la oferta de servicios de tercer ciclo de educación básica con énfasis en zonas rurales focalizadas
Centros de Educación Básica con Instalaciones de Tercer Ciclo Construidas
Centros de Educación Básica con Instalaciones de Tercer Ciclo Construidas
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Centros de Educación Básica con Instalaciones de Tercer Ciclo Construidas
Centros de Educación Básica con Instalaciones de Tercer Ciclo Construidas
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Número de centros educativos que reportan verificación de corresponsabilidades mediante el SACE de acuerdo con los cronogramas del nuevo RO.
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Centros de Educación Básica que ofrecen servicios de tercer ciclo en convenio con el IHER
Centros de Educación Básica con Instalaciones de Tercer Ciclo Equipadas con Tecnologia educativa
Centros de Educación Básica con Instalaciones de Tercer Ciclo Equipadas con Tecnologia educativa
Informes de Evaluación Operativa y de Resultados de la Estratega de Expansión del Tercer Ciclo
Informes de Evaluación Operativa y de Resultados de la Estratega de Expansión del Tercer Ciclo
Centros de Educación Básica con Instalaciones de Tercer Ciclo Equipadas con Mobiliario
Centros de Educación Básica con Instalaciones de Tercer Ciclo Equipadas con Mobiliario
COMPONENTE 3. Fortalecimiento Institucional
COMPONENTE 3. Fortalecimiento Institucional
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
Talleres de capacitación en temas de género.
Talleres de capacitación en temas de género.
Mancomunidades con procesos de verificación de corresponsabilidad de salud descentralizados.
Mancomunidades con procesos de verificación de corresponsabilidad de salud descentralizados.
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Número de fichas del RUP levantadas.
Número de fichas del RUP levantadas.
Informe de revisión técnica de cumplimiento de corresponsabilidades.
Informe de revisión técnica de cumplimiento de corresponsabilidades.
Mancomunidades con procesos de verificación de corresponsabilidad de salud descentralizados.
Mancomunidades con procesos de verificación de corresponsabilidad de salud descentralizados.
Consultorías para mejorar procesos de focalización y administración del padrón de beneficiarios.
Consultorías para mejorar procesos de focalización y administración del padrón de beneficiarios.
Encuesta de evaluación de Impacto (seguimiento)
Encuesta de evaluación de Impacto (seguimiento)
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Número de centros de salud que reportan verificación de corresponsabilidades mediante el sistema del RENPI al menos una vez al semestre.
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
Personal operativo de gestion para la implementacion del programa Bono Vida Mejor en la SSIS.
XI-IATI-IADB-HO-L1030
Inter-American Development Bank
Fiscal Reform Support Program
Programa de Apoyo a la Reforma Fiscal
The general objective of the program is to support the Republic of Honduras in strengthening its fiscal revenue in order to consolidate macroeconomic stability and resume a sustainable growth path, by modernizing the tax system and boosting the revenue of State-owned enterprises. The program has three components: (i) macroeconomic stability; (ii) reform of the tax system; and (iii) increase in the revenues of State-owned enterprises. The estimated amount of the loan is US$45.8 million. The proceeds from the loan will be disbursed in two equal tranches of US$22.9 million.
El objetivo general del programa es apoyar a la República de Hondurasen el fortalecimiento de sus recursos fiscales para consolidar la estabilidad macroeconómica y recuperar una senda de crecimiento sostenible, a través de la modernización del sistema tributario y del mejoramiento de los ingresos de las empresas públicas. El programa tiene tres componentes: (i) estabilidad macroeconómica; (ii) reforma tributaria; y (iii) mejora en los ingresos de las empresas públicas. El monto del financiamiento se estima en US$45,8 millones. Los recursos del financiamiento se desembolsarán en dos tramos, cada uno de US$22,9 millones.
REPUBLICA DE HONDURAS
MINISTERIO DE FINANZAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
6870000
Disbursement in forth quarter of 2010
16030000
Disbursement in forth quarter of 2010
16030000
Loan repayment in first quarter of 2011
7952.26
Interest repayment in second quarter of 2011
323924.57
Interest repayment in second quarter of 2011
8611.03
Interest repayment in forth quarter of 2011
414707.08
Interest repayment in forth quarter of 2011
6870000
Disbursement in forth quarter of 2011
16030000
Disbursement in forth quarter of 2011
16570.99
Interest repayment in second quarter of 2012
633115.74
Interest repayment in second quarter of 2012
17175
Interest repayment in forth quarter of 2012
684481
Interest repayment in forth quarter of 2012
17120.23
Interest repayment in second quarter of 2013
711670.52
Interest repayment in second quarter of 2013
17222.05
Interest repayment in forth quarter of 2013
721718.91
Interest repayment in forth quarter of 2013
17127.95
Interest repayment in second quarter of 2014
719110.19
Interest repayment in second quarter of 2014
17222.05
Interest repayment in forth quarter of 2014
723326.3
Interest repayment in forth quarter of 2014
17127.95
Interest repayment in second quarter of 2015
719373.7
Interest repayment in second quarter of 2015
17222.05
Interest repayment in forth quarter of 2015
723326.3
Interest repayment in forth quarter of 2015
17182.72
Interest repayment in second quarter of 2016
810365.64
Interest repayment in second quarter of 2016
17175
Interest repayment in forth quarter of 2016
769440
Interest repayment in forth quarter of 2016
654285.72
Loan repayment in forth quarter of 2016
729561.42
Interest repayment in second quarter of 2017
654285.72
Loan repayment in second quarter of 2017
711024.83
Interest repayment in forth quarter of 2017
654285.72
Loan repayment in forth quarter of 2017
686110.9
Interest repayment in second quarter of 2018
654285.72
Loan repayment in second quarter of 2018
674040.66
Interest repayment in forth quarter of 2018
654285.72
Loan repayment in forth quarter of 2018
655759.2
Interest repayment in second quarter of 2019
654285.72
Loan repayment in second quarter of 2019
644765.4
Interest repayment in forth quarter of 2019
654285.72
Loan repayment in forth quarter of 2019
628887.33
Interest repayment in second quarter of 2020
654285.72
Loan repayment in second quarter of 2020
614047.15
Interest repayment in forth quarter of 2020
654285.72
Loan repayment in forth quarter of 2020
608476.38
Interest repayment in second quarter of 2021
654285.72
Loan repayment in second quarter of 2021
599327.5
Interest repayment in forth quarter of 2021
654285.72
Loan repayment in forth quarter of 2021
580718.91
Interest repayment in second quarter of 2022
654285.72
Loan repayment in second quarter of 2022
569475.95
Interest repayment in forth quarter of 2022
654285.72
Loan repayment in forth quarter of 2022
546615.39
Interest repayment in second quarter of 2023
654285.72
Loan repayment in second quarter of 2023
533883.7
Interest repayment in forth quarter of 2023
654285.72
Loan repayment in forth quarter of 2023
Informe para Publicación_PMR-_HO-L1030-2011-1º-Periodo [36625184].PDF
Informe para Publicación_PMR-_HO-L1030-2010-2º-Periodo [36312773].PDF
Relatório para publicação_PMR-_HO-L1030-2010-2º-Período [36310285].PDF
Report for Publication_PMR-_HO-L1030-2011-1º-Period [36625746].PDF
Report for Publication_PMR-_HO-L1030-2010-2º-Period [36313347].PDF
Relatório para publicação_PMR-_HO-L1030-2011-1º-Período [36624048].PDF
Rapport pour Publication_PMR-_HO-L1030-2011-1º-Período [36624629].PDF
Honduras_ Programa de Apoyo a la Reforma Fiscal_ (2452_BL-HO;HO-L1030) [38062910].PDF
Rapport pour Publication_PMR-_HO-L1030-2010-2º-Período [36312186].PDF
HONDURAS_ Fiscal Reform Support Program (HO-L1030) [35577155].PDF
Contrato - Programa de Apoyo a la Reforma Fiscal.pdf
HONDURAS_ Programa de Apoyo a la Reforma Fiscal (HO-L1030) [35577087].PDF
XI-IATI-IADB-HO-L1031
Inter-American Development Bank
Disaster Risk Prevention and Mitigation Project
Proyecto de Prevención y Mitigación del Riesgo de Desastres Naturales
To support the country in the reduction of losses due to disasters through investments in prevention and mitigation, as well as in setting up institutional systems for disaster risk management.
Apoyar al país en la reducción de perdidas de desastres a través de inversiones en prevención y mitigación, así como en sistemas institucionales para gestión de riesgo de desastres
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
COMISION PERMANENTE DE CONTINGENCIAS COPECO
COMISION PERMANENTE DE CONTINGENCIAS COPECO
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Producto 1.1: Obras estructurales de mitigación de riesgo construidas. Proyecto de Prevención y Mitigación del Riesgo de Desastres Naturales, Honduras
14.824173968, -86.600264243
ENVIRONMENT AND NATURAL DISASTERS
MEDIO AMBIENTE Y DESASTRES NATURALE
195000
Disbursement in first quarter of 2011
455000
Disbursement in first quarter of 2011
203.01
Interest repayment in third quarter of 2011
6499.15
Interest repayment in third quarter of 2011
258343.57
Disbursement in third quarter of 2011
602801.68
Disbursement in third quarter of 2011
150000
Disbursement in first quarter of 2012
350000
Disbursement in first quarter of 2012
519.53
Interest repayment in first quarter of 2012
15851.82
Interest repayment in first quarter of 2012
456965.4
Disbursement in second quarter of 2012
1066252.6
Disbursement in second quarter of 2012
976.65
Interest repayment in third quarter of 2012
23514.75
Interest repayment in third quarter of 2012
600000
Disbursement in forth quarter of 2012
1400000
Disbursement in forth quarter of 2012
1740.17
Interest repayment in first quarter of 2013
45907.68
Interest repayment in first quarter of 2013
690000
Disbursement in first quarter of 2013
1610000
Disbursement in first quarter of 2013
2852.3
Interest repayment in third quarter of 2013
73556.81
Interest repayment in third quarter of 2013
690000
Disbursement in third quarter of 2013
1610000
Disbursement in third quarter of 2013
3826.89
Interest repayment in first quarter of 2014
90495.92
Interest repayment in first quarter of 2014
690000
Disbursement in second quarter of 2014
1610000
Disbursement in second quarter of 2014
4142.51
Interest repayment in third quarter of 2014
96256.01
Interest repayment in third quarter of 2014
990000
Disbursement in forth quarter of 2014
2310000
Disbursement in forth quarter of 2014
5426.76
Interest repayment in first quarter of 2015
123262.02
Interest repayment in first quarter of 2015
270000
Disbursement in third quarter of 2015
630000
Disbursement in third quarter of 2015
5955.45
Interest repayment in third quarter of 2015
128141.87
Interest repayment in third quarter of 2015
210000
Disbursement in forth quarter of 2015
490000
Disbursement in forth quarter of 2015
6381.32
Interest repayment in first quarter of 2016
158094.59
Interest repayment in first quarter of 2016
6464.86
Interest repayment in third quarter of 2016
149308.55
Interest repayment in third quarter of 2016
252792.78
Loan repayment in third quarter of 2016
499691.03
Disbursement in forth quarter of 2016
1165945.72
Disbursement in forth quarter of 2016
177388.85
Interest repayment in first quarter of 2017
277600.17
Loan repayment in first quarter of 2017
165004.95
Interest repayment in third quarter of 2017
277600.15
Loan repayment in third quarter of 2017
183788.98
Interest repayment in first quarter of 2018
277600.15
Loan repayment in first quarter of 2018
183483.1
Interest repayment in third quarter of 2018
277600.14
Loan repayment in third quarter of 2018
.01
Loan repayment in third quarter of 2018
214535.69
Interest repayment in first quarter of 2019
277600.15
Loan repayment in first quarter of 2019
237086.01
Interest repayment in third quarter of 2019
276996.08
Loan repayment in third quarter of 2019
241568.37
Interest repayment in first quarter of 2020
276996.08
Loan repayment in first quarter of 2020
207183.29
Interest repayment in third quarter of 2020
276996.08
Loan repayment in third quarter of 2020
161198.54
Interest repayment in first quarter of 2021
276996.08
Loan repayment in first quarter of 2021
156813.88
Interest repayment in third quarter of 2021
276996.08
Loan repayment in third quarter of 2021
158685.12
Interest repayment in first quarter of 2022
276996.08
Loan repayment in first quarter of 2022
158862.9
Interest repayment in third quarter of 2022
276996.08
Loan repayment in third quarter of 2022
159103.65
Interest repayment in first quarter of 2023
276996.08
Loan repayment in first quarter of 2023
219916.48
Interest repayment in third quarter of 2023
276996.08
Loan repayment in third quarter of 2023
230413.05
Interest repayment in first quarter of 2024
276996.08
Loan repayment in first quarter of 2024
HO-L1031 Second period Jan-Dec 2016-Public Report.pdf
HO-L1031 Second period Jan-Dec 2017-Public Report.pdf
Rapport pour Publication_PMR-_HO-L1031-2011-2º-Período [37297998].PDF
Relatório para publicação_PMR-_HO-L1031-2011-1º-Período [36624049].PDF
Rapport pour Publication_PMR-_HO-L1031-2012-1º-Período [37352850].PDF
HO-L1031 First period Jan-Jun 2018-Public Report.pdf
Report for Publication_PMR-_HO-L1031-2013-1º-Period [38267519].PDF
HO-L1031 [38920765].PDF
Report for Publication_PMR-_HO-L1031-2011-2º-Period [37298383].PDF
HO-L1031 First period Jan-Jun 2017-Public Report.pdf
Rapport pour Publication_PMR-_HO-L1031-2013-1º-Período [38266180].PDF
Informe para Publicación_PMR-_HO-L1031-2010-2º-Periodo [36312774].PDF
Report for Publication_PMR-_HO-L1031-2012-1º-Period [37354170].PDF
Rapport pour Publication_PMR-_HO-L1031-2010-2º-Período [36312187].PDF
Report for Publication_PMR-_HO-L1031-2011-1º-Period [36625747].PDF
Rapport pour Publication_PMR-_HO-L1031-2011-1º-Período [36624630].PDF
Informe para Publicación_PMR-_HO-L1031-2012-1º-Periodo [37353506].PDF
Informe para Publicación_PMR-_HO-L1031-2013-1º-Periodo [38266845].PDF
Informe para Publicación_PMR-_HO-L1031-2011-1º-Periodo [36625185].PDF
Informe para Publicación_PMR-_HO-L1031-2011-2º-Periodo [37298188].PDF
Report for Publication_PMR-_HO-L1031-2010-2º-Period [36313348].PDF
Relatório para publicação_PMR-_HO-L1031-2011-2º-Período [37297806].PDF
Relatório para publicação_PMR-_HO-L1031-2010-2º-Período [36310286].PDF
Relatório para publicação_PMR-_HO-L1031-2012-1º-Período [37352185].PDF
Relatório para publicação_PMR-_HO-L1031-2012-2º-Período [37873293].PDF
HO-L1031 [40746660].PDF
Rapport pour Publication_PMR-_HO-L1031-2012-2º-Período [37873961].PDF
HO-L1031 [40765545].PDF
Relatório para publicação_PMR-_HO-L1031-2013-1º-Período [38265516].PDF
Educación e información para la gestión del riesgo
Educación e información para la gestión del riesgo
Producto 4.2: Curricula relacionada a la gestión integral de riesgos de desastres implementada en escuelas primarias y secundarias de los Municipios Intervenidos.
Producto 4.2: Curricula relacionada a la gestión integral de riesgos de desastres implementada en escuelas primarias y secundarias de los Municipios Intervenidos.
Producto 4.4: Funcionarios municipales capacitados sobre la nueva reglamentación y normas técnicas de contrución impartida.
Producto 4.4: Funcionarios municipales capacitados sobre la nueva reglamentación y normas técnicas de contrución impartida.
Producto 4.3: Curricula de gestión integral de riesgos de desastres incorporada a carreras universitarias
Producto 4.3: Curricula de gestión integral de riesgos de desastres incorporada a carreras universitarias
Producto 4.3: Curricula de gestión integral de riesgos de desastres incorporada a carreras universitarias
Producto 4.3: Curricula de gestión integral de riesgos de desastres incorporada a carreras universitarias
Fortalecimiento de la capacidad de gestión integral de riesgos de desastres a nivel comunitario y municipal
Fortalecimiento de la capacidad de gestión integral de riesgos de desastres a nivel comunitario y municipal
Producto 2.2: Medidas prioritarias de gestión de riesgos a desastres a nivel comunitario implementadas
Producto 2.2: Medidas prioritarias de gestión de riesgos a desastres a nivel comunitario implementadas
Producto 2.1: Medidas de gestión integral de riesgos a desastres a nivel municipal implementadas
Producto 2.1: Medidas de gestión integral de riesgos a desastres a nivel municipal implementadas
Producto 2.1: Medidas de gestión integral de riesgos a desastres a nivel municipal implementadas
Producto 2.1: Medidas de gestión integral de riesgos a desastres a nivel municipal implementadas
Fortalecimiento institucional para la gestión integral de riesgo de desastres
Fortalecimiento institucional para la gestión integral de riesgo de desastres
Producto 3.2: Gestión integral de riesgos de desastres incorporada a los planes estratégicos sectoriales
Producto 3.2: Gestión integral de riesgos de desastres incorporada a los planes estratégicos sectoriales
Prevención y mitigación a nivel municipal
Prevención y mitigación a nivel municipal
Producto 1.3: Planes de gestión de riesgo a nivel municipal formulados.
Producto 1.3: Planes de gestión de riesgo a nivel municipal formulados.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.2: Obras no estructurales de mitigación de riesgo ejecutadas
Producto 1.2: Obras no estructurales de mitigación de riesgo ejecutadas
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.2: Obras no estructurales de mitigación de riesgo ejecutadas
Producto 1.2: Obras no estructurales de mitigación de riesgo ejecutadas
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
Producto 1.1: Obras estructurales de mitigación de riesgo construidas.
XI-IATI-IADB-HO-L1200
Inter-American Development Bank
Program for the Restoration of Climate-resilient Forests and Forestry for Sustainable Water-related Ecosystem Services
Programa de Restauración de Bosques Resilientes al Clima y Silvicultura para la Sostenibilidad de los Servicios Ecosistémicos Relacionados con el Agua
The program's general objective is to help improve the climate resilience of forests in areas critical to the water supply. Its specific objectives are to: (i) restore forest cover; and (ii) strengthen governance and financial sustainability for adaptive forest management. The program will encourage the participation of women by incorporating a gender perspective into its activities.
El objetivo general del programa es contribuir a mejorar la resiliencia climática de los bosques localizados en zonas críticas para la provisión de agua. Los objetivos específicos son: (i) restaurar la cobertura forestal; y (ii) fortalecer la gobernanza y sostenibilidad financiera para el Manejo Forestal Adaptativo (MFA). Se incentivará la participación de mujeres, considerándose la perspectiva de género en las actividades.
INTER AMERICAN DEVELOPMENT BANK
Green Climate Fund
AGENCIA ESTRATEGICA PARA EJECUCION PROYECTOS PRODUCTIVOS AMBIENTALES Y SOCIALES
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
ENVIRONMENT AND NATURAL DISASTERS
MEDIO AMBIENTE Y DESASTRES NATURALE
109306.21
115533.88
121976.28
128311.32
134968.48
141518.26
148068.04
154617.83
161167.61
167502.64
173730.31
179635.85
185219.27
190587.94
195419.75
199822.06
203794.88
207230.84
209915.17
212170.02
213565.87
214424.86
214532.23
214102.74
212814.26
210881.53
208519.32
205298.11
201540.04
197352.47
192735.41
187474.11
182105.44
176199.9
170186.98
163851.95
157409.54
150859.75
144309.97
137652.81
131210.4
124553.25
118218.21
111990.55
105870.26
99964.72
94166.55
88583.13
83429.2
78167.9
73336.09
68719.03
64316.72
60129.15
56156.34
52398.26
48854.94
45418.99
42412.53
1843138.81
250000
Disbursement in forth quarter of 2021
Programa de Restauración de Bosques Resilientes al Clima y Silvicultura para la Sostenib de los S Ecosist. LP Público.pdf
HO-L1200 First period Jan-Jun 2022 - Public Report.PDF
Enlace Opcional - Propuesta Fondo Verde para el Clima - HO-L1200; HO-L1252.pdf
HO-L1200 First period Jan-Jun 2020 - Public Report.pdf
Program for the Restoration of Climate-resilient Forests and Forestry for Sustainable Water-related Ecosyst Services. LP Public.pdf
HO-L1200 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1200 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1200 First period Jan-Jun 2021 - Public Report.pdf
HO-L1200_P964144_GN.pdf
Enlace Opcional - Referencias Bibliográficas - HO-L1200; HO-G1252.doc
Contrato - Programa de Restauración de Bosques Resilientes al Clima y Silvicultura para la Sostenibilidad de los Servicios Ecosistémicos Relacionados
Enlace Opcional - ROP - HO-L1200; HO-G1252.docx
HO-L1200 Second period Jan-Dec 2019-Public Report.pdf
Enlace Opcional - Evaluación Económica - HO-L1200; HO-G1252.docx
Enlace Requerido - Plan de Monitoreo y Evaluación - HO-L1200; HO-G1252.docx
HO-L1200 First period Jan-Jun 2023 - Public Report.PDF
Enlace Opcional - Plan de Acción de Género - HO-L1200; HO-G1252.docx
HO-L1200 Second period Jan-Dec 2021 - Public Report.PDF
Enlace Requerido - IGAS - HO-L1200; HO-G1252.docx
Enlace Requerido - PEP y POA - HO-L1200; HO-G1252.xlsx
XI-IATI-IADB-HO-L1118
Inter-American Development Bank
Programmatic Support for Structural Reforms in the Electricity Sector
Apoyo Programático a Reformas del Sector Eléctrico Segundo Préstamo
The general objective of the programmatic series and this second operation is to support the Government of Honduras in implementing the sector reforms and policies needed to enhance financial sustainability, operational efficiency, and security of supply in the electricity sector. The specific objectives are to: (i) strengthen the sector¿s institutional capacity and regulatory framework; (ii) enhance financial sustainability and operational efficiency; and (iii) adopt energy policies aimed at ensuring a secure supply of electricity.
El objetivo general de la serie programática y de la segundaoperación es apoyar al Gobierno de Honduras en la implementación de las reformas y políticas sectoriales necesarias para mejorar la sostenibilidad financiera, la eficiencia operativa y la seguridad del suministro en su sector eléctrico. Los objetivos específicos son: (i) fortalecer la capacidad institucional y el marco regulatorio sectorial; (ii) mejorar la sostenibilidad financiera y eficiencia operativa; y (iii) adopter políticas energéticas orientadas a garantizar la seguridad del suministro eléctrico.
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
SECRETARIA DE FINANZAS
SECRETARIA DE FINANZAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Al menos, 10 planes de eficiencia y ahorro energético en instituciones de la administración pública aprobados Apoyo Programático a Reformas del Sector Eléctrico Segundo Préstamo, Honduras
14.824173968, -86.600264243
ENERGY
ENERGIA
16000000
Disbursement in forth quarter of 2015
24000000
Disbursement in forth quarter of 2015
19235.87
Interest repayment in second quarter of 2016
444433.77
Interest repayment in second quarter of 2016
20000
Interest repayment in forth quarter of 2016
488520
Interest repayment in forth quarter of 2016
473121.9
Interest repayment in second quarter of 2017
473814.57
Interest repayment in forth quarter of 2017
465570.64
Interest repayment in second quarter of 2018
467798.13
Interest repayment in forth quarter of 2018
465241.87
Interest repayment in second quarter of 2019
467798.13
Interest repayment in forth quarter of 2019
466589.84
Interest repayment in second quarter of 2020
466520
Interest repayment in forth quarter of 2020
476481.61
Interest repayment in second quarter of 2021
479831.01
Interest repayment in forth quarter of 2021
500000
Loan repayment in forth quarter of 2021
467682.67
Interest repayment in second quarter of 2022
500000
Loan repayment in second quarter of 2022
460673.66
Interest repayment in forth quarter of 2022
500000
Loan repayment in forth quarter of 2022
443328.64
Interest repayment in second quarter of 2023
500000
Loan repayment in second quarter of 2023
436001.25
Interest repayment in forth quarter of 2023
500000
Loan repayment in forth quarter of 2023
Contrato - Apoyo Programático a Reformas Estructurales del Sector Eléctrico - Segundo Préstamo [40115758].PDF
XI-IATI-IADB-HO0197
Inter-American Development Bank
Comprehensive Development Autochthonous People
Desarrollo Integral Pueblos Autóctonos
The Program will contribute to improving the quality of life of the native population of Honduras and will contribute to its integral and sustainable development in the economic, social, cultural and environmental areas. In particular, the Program will seek to: (i) improve the productive and human development capacities and opportunities of the communities; (ii) strengthen the internal organization and representativeness of the indigenous and afro-descendant organizations at the local, regional and national level, as well as that of the government institutions that interact with these groups; and (iii) strengthen the SGJ in its regulatory role with respect to the native population. The Program has an integral, intersectorial and participatory character, and incorporates social inclusion, gender and environmental aspects into its interventions.
El objetivo general del Programa es contribuir a mejorar las condiciones de vida de los pueblos autóctonos de Honduras y contribuir a su desarrollo integral y sostenible en los ámbitos económico, social, cultural y ambiental. Los objetivos específicos son: (i) mejorar las capacidades y oportunidades de las comunidades en el ámbito productivo y de desarrollo humano; (ii) fortalecer la auto gestión de las organizaciones indígenas y afro-descendientes representativas a nivel comunitario, local, regional y nacional así como las instituciones del gobierno que interactúen con ellas; y (iii) fortalecer a la SGJ en su rol rector en los asuntos de los pueblos autóctonos. El Programa tiene un carácter integral, intersectorial y participativo, incorporando de manera transversal los aspectos de inclusión social, de género y de medio ambiente en sus intervenciones.
Fund for Special Operations
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
FONDO HONDURENO DE INVERSION SOCIAL
FONDO HONDURENO DE INVERSION SOCIAL
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos. Desarrollo Integral Pueblos Autóctonos, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
24000
Disbursement in first quarter of 2007
18000
Disbursement in second quarter of 2007
146950
Disbursement in third quarter of 2007
9000
Disbursement in third quarter of 2007
334045
Disbursement in forth quarter of 2007
9000
Disbursement in forth quarter of 2007
9000
Disbursement in first quarter of 2008
2105.24
Interest repayment in second quarter of 2008
86905.27
Disbursement in second quarter of 2008
9000
Disbursement in second quarter of 2008
54877.56
Disbursement in third quarter of 2008
9000
Disbursement in third quarter of 2008
59485.07
Disbursement in forth quarter of 2008
3302.68
Interest repayment in forth quarter of 2008
52536.82
Disbursement in forth quarter of 2008
107938.43
Disbursement in forth quarter of 2008
9000
Disbursement in forth quarter of 2008
73027.78
Disbursement in first quarter of 2009
9000
Disbursement in first quarter of 2009
58487.48
Disbursement in second quarter of 2009
4376.18
Interest repayment in second quarter of 2009
160650.23
Disbursement in second quarter of 2009
9000
Disbursement in second quarter of 2009
9000
Disbursement in third quarter of 2009
9000
Disbursement in forth quarter of 2009
46536.2
Disbursement in second quarter of 2010
316300
Disbursement in second quarter of 2010
12361.35
Interest repayment in second quarter of 2010
66928.3
Disbursement in second quarter of 2010
39126.07
Disbursement in third quarter of 2010
54026.65
Disbursement in third quarter of 2010
101989.42
Disbursement in forth quarter of 2010
316300
Disbursement in forth quarter of 2010
8585.01
Interest repayment in forth quarter of 2010
68900
Disbursement in forth quarter of 2010
201641.29
Disbursement in forth quarter of 2010
141672.58
Disbursement in first quarter of 2011
12438.27
Interest repayment in second quarter of 2011
301163.06
Disbursement in second quarter of 2011
200232.23
Disbursement in third quarter of 2011
448976.19
Disbursement in third quarter of 2011
15357.39
Interest repayment in forth quarter of 2011
632600
Disbursement in forth quarter of 2011
461700
Disbursement in forth quarter of 2011
375048.44
Disbursement in forth quarter of 2011
516301.93
Disbursement in forth quarter of 2011
428048.3
Disbursement in forth quarter of 2011
27889.08
Interest repayment in second quarter of 2012
700886.21
Disbursement in second quarter of 2012
739949.05
Disbursement in second quarter of 2012
981000
Disbursement in third quarter of 2012
1039000
Disbursement in third quarter of 2012
1510770.44
Disbursement in third quarter of 2012
39795.49
Interest repayment in forth quarter of 2012
744.84
Interest repayment in first quarter of 2013
56780.28
Interest repayment in second quarter of 2013
165000.04
Disbursement in second quarter of 2013
54848.44
Interest repayment in forth quarter of 2013
.04
Disbursement in first quarter of 2014
156.17
Interest repayment in first quarter of 2014
55045.89
Interest repayment in second quarter of 2014
55180.06
Interest repayment in forth quarter of 2014
55033.85
Interest repayment in second quarter of 2015
55336.23
Interest repayment in forth quarter of 2015
55242.05
Interest repayment in second quarter of 2016
55185.04
Interest repayment in forth quarter of 2016
109953.69
Interest repayment in second quarter of 2017
183950.14
Loan repayment in second quarter of 2017
108827.93
Interest repayment in forth quarter of 2017
183950.14
Loan repayment in forth quarter of 2017
106398.78
Interest repayment in second quarter of 2018
183950.14
Loan repayment in second quarter of 2018
105138.84
Interest repayment in forth quarter of 2018
183950.14
Loan repayment in forth quarter of 2018
102729.86
Interest repayment in second quarter of 2019
183950.14
Loan repayment in second quarter of 2019
101449.76
Interest repayment in forth quarter of 2019
183950.14
Loan repayment in forth quarter of 2019
99435.69
Interest repayment in second quarter of 2020
183950.14
Loan repayment in second quarter of 2020
97493.57
Interest repayment in forth quarter of 2020
183950.14
Loan repayment in forth quarter of 2020
95283.14
Interest repayment in second quarter of 2021
183950.14
Loan repayment in second quarter of 2021
94061.52
Interest repayment in forth quarter of 2021
183950.14
Loan repayment in forth quarter of 2021
91702.92
Interest repayment in second quarter of 2022
183950.14
Loan repayment in second quarter of 2022
90362.36
Interest repayment in forth quarter of 2022
183950.14
Loan repayment in forth quarter of 2022
88054.16
Interest repayment in second quarter of 2023
183950.14
Loan repayment in second quarter of 2023
86693.43
Interest repayment in forth quarter of 2023
183950.14
Loan repayment in forth quarter of 2023
Report for Publication_PMR-_HO0197-2012-2º-Period [37875467].PDF
Rapport pour Publication_PMR-_HO0197-2011-1º-Período [36624643].PDF
Relatório para publicação_PMR-_HO0197-2012-1º-Período [37352204].PDF
Informe para Publicación_PMR-_HO0197-2012-2º-Periodo [37874638].PDF
Report for Publication_PMR-_HO0197-2012-1º-Period [37354188].PDF
Report for Publication_PMR-_HO0197-2013-1º-Period [38267536].PDF
Relatório para publicação_PMR-_HO0197-2010-2º-Período [36310296].PDF
Relatório para publicação_PMR-_HO0197-2011-1º-Período [36624063].PDF
Report for Publication_PMR-_HO0197-2011-2º-Period [37298398].PDF
Rapport pour Publication_PMR-_HO0197-2012-2º-Período [37873978].PDF
Programa de Desarrollo Integral de los Pueblos Autóctonos [584460].DOC
Programa de Desarrollo Integral de los Pueblos Autóctonos [592221].DOC
Relatório para publicação_PMR-_HO0197-2012-2º-Período [37873311].PDF
Report for Publication_PMR-_HO0197-2010-2º-Period [36313359].PDF
Relatório para publicação_PMR-_HO0197-2011-2º-Período [37297819].PDF
Informe para Publicación_PMR-_HO0197-2011-1º-Periodo [36625199].PDF
Rapport pour Publication_PMR-_HO0197-2012-1º-Período [37352867].PDF
Rapport pour Publication_PMR-_HO0197-2011-2º-Período [37298011].PDF
Rapport pour Publication_PMR-_HO0197-2013-1º-Período [38266197].PDF
Programa de Desarrollo Integral de los Pueblos Autóctonos [584928].DOC
Informe para Publicación_PMR-_HO0197-2011-2º-Periodo [37298202].PDF
Informe para Publicación_PMR-_HO0197-2010-2º-Periodo [36312784].PDF
Informe para Publicación_PMR-_HO0197-2013-1º-Periodo [38266862].PDF
Report for Publication_PMR-_HO0197-2011-1º-Period [36625760].PDF
Informe para Publicación_PMR-_HO0197-2012-1º-Periodo [37353525].PDF
Relatório para publicação_PMR-_HO0197-2013-1º-Período [38265533].PDF
Rapport pour Publication_PMR-_HO0197-2010-2º-Período [36312197].PDF
Desarrollo Productivo.
Desarrollo Productivo.
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Proyectos productivos y de emergencia están funcionando en las comunidades objetivo (FHIS).
Desarrollo de Capital Humano.
Desarrollo de Capital Humano.
Proyectos concursables generando oportunidades de desarrollo humano funcionando en las comunidades objetivo (SEDINAFROH).
Proyectos concursables generando oportunidades de desarrollo humano funcionando en las comunidades objetivo (SEDINAFROH).
Proyectos concursables generando oportunidades de desarrollo humano funcionando en las comunidades objetivo (SEDINAFROH).
Proyectos concursables generando oportunidades de desarrollo humano funcionando en las comunidades objetivo (SEDINAFROH).
Fortalecimiento Institucional.
Fortalecimiento Institucional.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
Emprendedores de grupos indigenas y afrodescendientes capacitadas en Gestión de Proyectos.
XI-IATI-IADB-HO-L1187
Inter-American Development Bank
Civic Coexistence and Neighborhood Improvement Program
Programa de Convivencia Ciudadana y Mejoramiento de Barrios
The general objective is to improve civic coexistence in Honduras byimproving the quality of life in vulnerable neighborhoods and reducing the incidence of violent crime. Thespecific objectives are: (i) to improve the habitat of vulnerable urban neighborhoods, by increasing access tobasic services and prevention infrastructure to reduce robberies and sex crimes; (ii) to reduce homicide anddomestic violence rates in the beneficiary neighborhoods, by improving violence prevention and victimassistance services; and (iii) to improve police effectiveness in criminal investigations, by increasing theproportion of homicide cases with an identified suspect and investigative report accepted by the PublicProsecutor's Office.
Contribuir a mejorar la convivencia ciudadana en Honduras a través de la mejoraen la calidad de vida en barrios vulnerables y la reducción de la incidencia de delitos violentos. Los objetivos específicosson: (i) mejorar el hábitat de barrios urbanos vulnerables, aumentando el acceso a infraestructura de servicios básicos yde prevención para disminuir delitos de robos y delitos sexuales; (ii) reducir los niveles de incidencia de homicidios yviolencia intrafamiliar en los municipios intervenidos mejorando los servicios de prevención y atención a víctimas de laviolencia; y (iii) mejorar la efectividad policial en investigación criminal, a través del incremento de la proporción de casosde homicidio con agresor identificado e informe de investigación aceptado por el Ministerio Público.
SECRETARÍA DE ESTADO EN EL DESPACHO DE SEGURIDAD
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Academia Nacional de Policía diseñada. Programa de Convivencia Ciudadana y Mejoramiento de Barrios, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
313800.0
292800.0
273000.0
253800.0
237000.0
2929600.0
1600000
Disbursement in forth quarter of 2018
900000
Disbursement in forth quarter of 2018
18731.04
Interest repayment in second quarter of 2019
2000000
Disbursement in third quarter of 2019
38004.45
Interest repayment in forth quarter of 2019
4000000
Disbursement in forth quarter of 2019
6000000
Disbursement in forth quarter of 2019
109788.8
Interest repayment in second quarter of 2020
6970850
Disbursement in third quarter of 2020
82519.48
Interest repayment in forth quarter of 2020
3000000
Disbursement in forth quarter of 2020
2000000
Disbursement in forth quarter of 2020
104802.67
Interest repayment in second quarter of 2021
8029150
Disbursement in second quarter of 2021
9000000
Disbursement in second quarter of 2021
2185000
Disbursement in second quarter of 2021
173828.73
Interest repayment in forth quarter of 2021
2000000
Disbursement in forth quarter of 2021
202787.31
Interest repayment in second quarter of 2022
1200000
Disbursement in third quarter of 2022
2215000
Disbursement in third quarter of 2022
2215000
Disbursement in forth quarter of 2022
2215000
Disbursement in forth quarter of 2022
445986.72
Interest repayment in forth quarter of 2022
2215000
Disbursement in forth quarter of 2022
3100000
Disbursement in forth quarter of 2022
920702.27
Interest repayment in second quarter of 2023
1093660.89
Interest repayment in forth quarter of 2023
1500000
Disbursement in forth quarter of 2023
Honduras. Propuesta de Préstamo para el Programa de Convivencia Ciudadana y Mejoramiento de Barrios.pdf
HO-L1187_1791_1_SP.pdf
HO-L1187_P817238_SP.pdf
Anexo 14. Opciones de Política Pública para el sector de Seguridad Ciudadana post periodo no objecion.docx
POD. HO-L1187 Manual operativo Post periodo no objecion.docx
HO-L1187_0415_2_SP.pdf
HO-L1187 First period Jan-Jun 2022 - Public Report.PDF
HO-L1187_P2043248_3_SP.pdf
HO-L1187_9733_2_SP.pdf
HO-L1187_P2043248_2_SP.pdf
HO-L1187_P2043248_SP.pdf
HO-L1187_4682_7_SP.pdf
HO-L1187_P2043248_4_SP.pdf
Informe de consulta publica UMEP-2-editado.pdf
Contrato - Programa de Convivencia Ciudadana y Mejoramiento de Barrios.pdf
Opcionales 2. Presupuesto Detallado post periodo no objecion.xlsx
HO-L1187 Second period Jan-Dec 2019-Public Report.pdf
HO-L1187_0392_2_SP.pdf
HO-L1187_P805825_SP.pdf
Opcionales 6. Censo de línea de base de barrios a intervenir.docx
HO-L1187_P1084020_SP.pdf
HO-L1187 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1187_P1090143_SP.pdf
HO-L1187 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1187_4682_3_SP.pdf
HO-L1187_P748823_SP.pdf
HO-L1187_1791_2_SP.pdf
EEO 18_Análisis del Cumplimiento de la Política de Servicios Públicos Domiciliarios post periodo no objecion.docx
Opcionales 8. Informe de terminación de proyectos para el Programa de Integración y Convivencia Urbana HO-L1088.pdf
PA revisado BIDADQ24102019.xlsx
Requerido 2. Plan de Ejecución Plurianual PEP y POA V05MAR18.pdf
HO-L1187_P741298_SP.pdf
POD. HO-L1187 Plan de monitoreo y evaluacion Post QRR.docx
HO-L1187 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1187_0392_4_SP.pdf
Opcionales 7. Encuesta Nacional de Convivencia y Seguridad Ciudadana en Honduras 2017.docx
HO-L1187_P1057377_SP.pdf
POD. EEO 16. Matriz de Lógica Vertical POST QRR.xlsb
HO-L1187_0392_5_SP.pdf
HO-L1187 Second period Jan-Dec 2018-Public Report.pdf
Opcional 4. Recomendaciones a aspectos institucionales.docx
Opcionales 5. Criterios de focalización y metodología del Índice de marginación urbana y violencia.docx
Requerido 4 . Plan de Adquisiciones post periodo no objecion.xlsx
HO-L1187_0415_5_GN.pdf
Opcionales 12. Lecciones aprendidas de la experiencia de la Reforma Policial en Honduras_02132018.docx
HO-L1187_P2043248_5_SP.pdf
Opcionales 10. Análisis de los mecanismos de prevención, atención y derivación de la violencia contra la mujer en Honduras.docx
HO-L1187 First period Jan-Jun 2019-Public Report.pdf
HO-L1187_P500415_SP.pdf
POD. Anexo IV. Filtros de Salvaguardas POST QRR.pdf
HO-L1187 First period Jan-Jun 2018-Public Report.pdf
HO-L1187_P731791_SP.pdf
Opcionales 11. Análisis del Sistema Educativo Policial y del Sistema de Investigación Criminal.docx
Caso de Estudio en Honduras.pdf
HO-L1187 First period Jan-Jun 2023 - Public Report.PDF
IGAS HO-L1187 post-negociación.docx
Civic Coexistence and Neighborhood Improvement Program. Amended.pdf
HO-L1187_P2043248_1_SP.pdf
Programa de Desarrollo Urbano Integral de Ciudades con Vocación Turística.pdf
Informe de consulta publica ANAPO-final.pdf
POD. EEO 1B. Cálculos análisis económico POST QRR.xlsx
POD. HO-L1187 Analisis Economico Post QRR.docx
HO-L1187 First period Jan-Jun 2020 - Public Report.pdf
Diseno de Obras HO-L1187.pdf
HO-L1187_P490392_SP.pdf
HO-L1187 First period Jan-Jun 2021 - Public Report.pdf
Componente # 4 Mejoramiento a la capacidad de provision de servicios de salud
Componente # 4 Mejoramiento a la capacidad de provision de servicios de salud
Número de unidades de salud equipados para la atención de pacientes COVID-19
Número de unidades de salud equipados para la atención de pacientes COVID-19
Plan de comunicación para el cambio de comportamiento social y de comunicación de riesgos ejecutado
Plan de comunicación para el cambio de comportamiento social y de comunicación de riesgos ejecutado
Número de establecimientos disponibles para brindar cuidados a los pacientes con COVI-19 financiados a través de los convenios de gestión de primer nivel de atención
Número de establecimientos disponibles para brindar cuidados a los pacientes con COVI-19 financiados a través de los convenios de gestión de primer nivel de atención
Sala situacional para la coordinación y conducción del Plan de Contención y Respuesta del COVID-19
Sala situacional para la coordinación y conducción del Plan de Contención y Respuesta del COVID-19
Plan para la contención y respuesta del COVID-19 en Honduras fortalecido
Plan para la contención y respuesta del COVID-19 en Honduras fortalecido
Número de equipos de respuesta rápida para la busqueda activa y detección de casos que operan en el terreno
Número de equipos de respuesta rápida para la busqueda activa y detección de casos que operan en el terreno
Sistema de Información Integrado de Salud (SIIS) Fortalecido
Sistema de Información Integrado de Salud (SIIS) Fortalecido
Numero de regiones de salud que usan telemedicina para el seguimiento y cuidado de pacientes
Numero de regiones de salud que usan telemedicina para el seguimiento y cuidado de pacientes
Número de laboratorios que recibieron equipo e insumos para la realización de diagnósticos
Número de laboratorios que recibieron equipo e insumos para la realización de diagnósticos
Aplicativos informáticos para fortalecer el Sistema de Información Integral de Salud (SIIS)
Aplicativos informáticos para fortalecer el Sistema de Información Integral de Salud (SIIS)
Componente #1: Mejoramiento del hábitat de barrios urbanos vulnerables
Componente #1: Mejoramiento del hábitat de barrios urbanos vulnerables
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Mujeres de los barrios intervenidos capacitadas en emprendedurismo y empleo
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Jóvenes de los barrios intervenidos capacitados
Componente #2: Atención y servicio al ciudadano en materia de convivencia ciudadana en municipios
Componente #2: Atención y servicio al ciudadano en materia de convivencia ciudadana en municipios
Gobiernos municipales capacitados para análisis de datos y elaboración de planes locales
Gobiernos municipales capacitados para análisis de datos y elaboración de planes locales
Equipo multidisciplinario contratado para la mejora del análisis de datos en la subsecretaría de asuntos interinstitucional
Equipo multidisciplinario contratado para la mejora del análisis de datos en la subsecretaría de asuntos interinstitucional
Protocolo de actuación de la PNH de policía comunitaria y de atención y derivación de VIF, elaborado
Protocolo de actuación de la PNH de policía comunitaria y de atención y derivación de VIF, elaborado
Estaciones policiales construidas con servicios de atención primaria y derivación para VIF, siendo utilizados
Estaciones policiales construidas con servicios de atención primaria y derivación para VIF, siendo utilizados
Cursos impartidos por la policía a jóvenes y familias en temas de violencias, denuncias y derechos humanos
Cursos impartidos por la policía a jóvenes y familias en temas de violencias, denuncias y derechos humanos
Documento de cartera de servicios policiales elaborado
Documento de cartera de servicios policiales elaborado
Servicios de atención integral para VIF en las DPI intervenidas, en funcionamiento de acuerdo con el protocolo de servicios
Servicios de atención integral para VIF en las DPI intervenidas, en funcionamiento de acuerdo con el protocolo de servicios
Curso de capacitación para la implementación del protocolo de la PNH de policía comunitaria y de atención y derivación de VIF, elaborado
Curso de capacitación para la implementación del protocolo de la PNH de policía comunitaria y de atención y derivación de VIF, elaborado
Estaciones policiales existentes con servicios de atención primaria y derivación para VIF, siendo utilizados
Estaciones policiales existentes con servicios de atención primaria y derivación para VIF, siendo utilizados
Componente #3: Efectividad policial
Componente #3: Efectividad policial
Academia Nacional de Policía diseñada.
Academia Nacional de Policía diseñada.
Programa de capacitación y especialización continua en IC, diseñado y efectuado
Programa de capacitación y especialización continua en IC, diseñado y efectuado
Sistema de Formación y Profesionalización Policial articulado y funcionado
Sistema de Formación y Profesionalización Policial articulado y funcionado
XI-IATI-IADB-HO-L1103
Inter-American Development Bank
Fiscal Consolidation Support Program
Programa de Apoyo a la Consolidación Fiscal
The main objective of the program is to support fiscal consolidation in Honduras through policy measures to strengthen macro-fiscal management, increase tax revenue collection, enhance public expenditure management, and improve the management of fiscal risks associated with contingent liabilities. This operation is the first of two in a programmatic series of policy-based loans
El objetivo principal del programa es contribuir a la consolidación fiscal deHonduras, por medio de medidas de política orientadas al fortalecimiento de la gestión macro fiscal, el aumento de la recaudación de los ingresos fiscales, la mejora de la gestión del gasto público y la mejora de la gestión de los riesgos fiscales asociados a los pasivos contingentes. La presente operación corresponde a la primera de dos operaciones bajo la modalidad de Préstamo Programático deApoyo a Reformas de Política (PBP).
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
SECRETARIA DE FINANZAS
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
2.1. Sistematización del uso del Marco Fiscal de Mediano Plazo (MFMP) implantado Programa de Apoyo a la Consolidación Fiscal, Honduras
14.824173968, -86.600264243
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
24000000
Disbursement in forth quarter of 2015
36000000
Disbursement in forth quarter of 2015
28689.43
Interest repayment in second quarter of 2016
665151.47
Interest repayment in second quarter of 2016
30000
Interest repayment in forth quarter of 2016
732780
Interest repayment in forth quarter of 2016
709682.83
Interest repayment in second quarter of 2017
710721.86
Interest repayment in forth quarter of 2017
698355.94
Interest repayment in second quarter of 2018
701697.21
Interest repayment in forth quarter of 2018
697862.79
Interest repayment in second quarter of 2019
701697.21
Interest repayment in forth quarter of 2019
699884.76
Interest repayment in second quarter of 2020
699780
Interest repayment in forth quarter of 2020
714722.42
Interest repayment in second quarter of 2021
719746.52
Interest repayment in forth quarter of 2021
750000
Loan repayment in forth quarter of 2021
701523.99
Interest repayment in second quarter of 2022
750000
Loan repayment in second quarter of 2022
691010.5
Interest repayment in forth quarter of 2022
750000
Loan repayment in forth quarter of 2022
664992.94
Interest repayment in second quarter of 2023
750000
Loan repayment in second quarter of 2023
654001.89
Interest repayment in forth quarter of 2023
750000
Loan repayment in forth quarter of 2023
Filtros de Salvaguardias Socio Ambientales [39838521].docx
Diseño del marco regulatorio para las inversiones de los fondos públicos por parte de los institutos de prevenci [39849784].PDF
Matriz de Medios de Verificacion_ [39838308].DOCX
Programa de Apoyo a la Consolidación Fiscal [39974381].PDF
Cuadro Resumen de recientes operaciones en materia Fiscal en Honduras [39838307].DOCX
Contrato - Programa de Apoyo a la Consolidación Fiscal [40116119].PDF
Fiscal Consolidation Support Program [39994044].PDF
Mejorando la Eficiencia de los Recursos Humanos en el Estado_ Informe sobre Empleo Público y Política Salarial e [39850221].PDF
Carta de Política_ [39847055].pdf
Plan de Monitoreo y Evaluación_ [39838301].DOCX
Analisis Económico [39838502].docx
Matriz de Resultados [39838309].DOCX
XI-IATI-IADB-HO-L1108
Inter-American Development Bank
Tax Administration Institutional and Operational Strengthening
Fortalecimiento Institucional y Operativo de la Administración Tributaria
The principal objective of the program is to improve tax revenue levels in order to create the fiscal space needed to finance priority expenditures. The program supports the Honduran government¿s decision to restructure tax and customs administration, for which purpose it is creating the SAR to replace the current DEI. This support will be provided through: (i) the revision and updating of taxation processes in accordance with the Honduran legal framework; (ii) modernization of the SAR¿s technological infrastructure and systems; and (iii) strengthening of the SAR¿s human resources.
El objetivo principal del programa es mejorar los niveles de recaudacióntributaria con miras a generar el espacio fiscal necesario para financiar gastos prioritarios. El programa apoya la decisión del Gobierno de Honduras de reestructurar la administración tributaria y aduanera para lo cual se crea el Servicio de Administración de Rentas (SAR) en sustitución de la actual Dirección Ejecutiva de Ingresos (DEI). Este apoyo es mediante: (i) la revisión y actualización de los procesos tributarios de acuerdo con el marco legal hondureño; (ii) la modernización de los sistemas e infraestructura tecnológica del SAR; y (iii) el fortalecimiento del talento humano del SAR.
BLENDED LOANS
REPUBLICA DE HONDURAS
SERVICIO DE ADMINISTRACIÓN DE RENTAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Infraestructura tecnológica de software reforzada Fortalecimiento Institucional y Operativo de la Administración Tributaria, Honduras
14.824173968, -86.600264243
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
151200.0
141210.0
131760.0
122850.0
114210.0
106650.0
1357614.0
1462068
Disbursement in second quarter of 2016
2193102
Disbursement in second quarter of 2016
918.79
Interest repayment in third quarter of 2016
10517.31
Interest repayment in third quarter of 2016
24834.06
Interest repayment in first quarter of 2017
24919.45
Interest repayment in third quarter of 2017
4000000
Disbursement in forth quarter of 2017
4593102
Loan repayment in first quarter of 2018
41357.59
Interest repayment in first quarter of 2018
120006.39
Interest repayment in third quarter of 2018
3200000
Disbursement in forth quarter of 2018
123179.36
Interest repayment in first quarter of 2019
126965.44
Interest repayment in third quarter of 2019
120242.07
Interest repayment in first quarter of 2020
110676.24
Interest repayment in third quarter of 2020
2200000
Disbursement in forth quarter of 2020
109267.24
Interest repayment in first quarter of 2021
117036.74
Interest repayment in third quarter of 2021
1700000
Disbursement in forth quarter of 2021
131249.27
Interest repayment in first quarter of 2022
184439.63
Loan repayment in first quarter of 2022
161803.35
Interest repayment in third quarter of 2022
184439.63
Loan repayment in third quarter of 2022
3545000
Disbursement in third quarter of 2022
210916.35
Interest repayment in first quarter of 2023
230678.76
Loan repayment in first quarter of 2023
3942336
Disbursement in first quarter of 2023
268463.63
Interest repayment in third quarter of 2023
283243.24
Loan repayment in third quarter of 2023
2632000
Disbursement in forth quarter of 2023
HO-L1108_P752840_SP.pdf
HO-L1108_P788653_SP.pdf
HO-L1108_8653_4_SP.pdf
Presupuesto Detallado [39597933].xlsx
HO-L1108 [40837246].PDF
HO-L1108 First period Jan-Jun 2021 - Public Report.pdf
HO-L1108 [40837187].PDF
HO-L1108_P1088589_SP.pdf
Plan Operativo Anual [39610161].XLSX
HO-L1108_3617_10_SP.pdf
HO-L1108_8653_3_SP.pdf
HO-L1108 Second period Jan-Dec 2017-Public Report.pdf
HO-L1108 First period Jan-Jun 2019-Public Report.pdf
HO-L1108 First period Jan-Jun 2016-Public Report [40799131].PDF
HO-L1108 [40824707].PDF
HO-L1108 [40712012].PDF
HO-L1108 Second period Jan-Dec 2019-Public Report.pdf
HO-L1108 [40308704].PDF
HO-L1108_8653_1_SP.pdf
Evaluación Económica [39597907].docx
HO-L1108 First period Jan-Jun 2023 - Public Report.PDF
HO-L1108 [40744752].PDF
HO-L1108 Second period Jan-Dec 2015-Public Report [40377550].PDF
HO-L1108 [40709629].PDF
HO-L1108 [40798681].PDF
HO-L1108 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1108 [40837196].PDF
HO-L1108_8653_6_SP.pdf
HO-L1108 First period Jan-Jun 2018-Public Report.pdf
HO-L1108_2840_8_SP.pdf
HO-L1108 First period Jan-Jun 2017-Public Report.pdf
HO-L1108 [40744775].PDF
HO-L1108_6341_5_SP.pdf
HO-L1108_8653_2_SP.pdf
HO-L1108 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1108 [40837222].PDF
HO-L1108 1326 3.pdf
Filtros de Política de Salvaguardias [39348223].doc
HO-L1108_3617_9_SP.pdf
Plan de Ejecución Plurianual (PEP) [39597898].xlsx
HO-L1108_P543617_SP.pdf
HO-L1108 First period Jan-Jun 2022 - Public Report.PDF
HO-L1108_P566341_SP.pdf
HO-L1108 Second period Jan-Dec 2018-Public Report.pdf
HO-L1108_8653_5_SP.pdf
HO-L1108_3617_4_SP.pdf
HO-L1108 Second period Jan-Dec 2016-Public Report.pdf
HO-L1108 [40837225].PDF
HO-L1108 [40709760].PDF
HO-L1108_P2084935_SP.pdf
Plan Operativo Anual [39632891].xlsx
HO-L1108_6341_6_SP.pdf
Plan de Adquisiciones [39601551].XLSX
HO-L1108 [40308705].PDF
Fortalecimiento Institucional y Operativo de la Administración Tributario [39858289].PDF
HO-L1108 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1108 [40712000].PDF
HO-L1108_8653_7_SP.pdf
HO-L1108 First period Jan-Jun 2020 - Public Report.pdf
Tax Administration Institutional and Operational Strengthening [39875643].PDF
Plan de Monitoreo y Evaluación [39597916].doc
HO-L1108_6341_4_SP.pdf
Contrato - Fortalecimiento Institucional y Operativo de la Administración Tributaria [40333735].PDF
COMPONENTE I: Reingeniería de los procesos de la administración tributaria.
COMPONENTE I: Reingeniería de los procesos de la administración tributaria.
UOM fortalecida
UOM fortalecida
Procesos de la administración tributaria diseñados
Procesos de la administración tributaria diseñados
Procesos de la administración tributaria diseñados
Procesos de la administración tributaria diseñados
COMPONENTE II: Modernización de los sistemas y de la infraestructura tecnológica y física del SAR.
COMPONENTE II: Modernización de los sistemas y de la infraestructura tecnológica y física del SAR.
Infraestructura tecnológica de software reforzada
Infraestructura tecnológica de software reforzada
COMPONENTE III: Fortalecimiento del talento humano del SAR.
COMPONENTE III: Fortalecimiento del talento humano del SAR.
Servidores Públicos de la DEI desvinculados e indemnizados
Servidores Públicos de la DEI desvinculados e indemnizados
Nueva Política de RH desarrollada
Nueva Política de RH desarrollada
Servidores Públicos capacitados a través de un programa permanente de capacitación
Servidores Públicos capacitados a través de un programa permanente de capacitación
Servidores Públicos capacitados a través de un programa permanente de capacitación
Servidores Públicos capacitados a través de un programa permanente de capacitación
Nuevos Servidores Públicos del SAR contratados bajo la nueva política de recursos humanos
Nuevos Servidores Públicos del SAR contratados bajo la nueva política de recursos humanos
Servidores Públicos capacitados a través de un programa permanente de capacitación
Servidores Públicos capacitados a través de un programa permanente de capacitación
XI-IATI-IADB-HO-L1206
Inter-American Development Bank
Honduras Transportation And Freight Logistics Sector Reform Program II
Programa de Reformas del Sector Transporte y Logística de Carga de Honduras II
The program's objective is to support improvements in Honduras's logistics performance through regulatory, institutional, planning, and trade facilitation reforms in the sector, with a view to boosting competitiveness and regional integration. This is the second in a series of three operations under a programmatic policy-based loan (PBL).
El objetivo del programa es contribuir a la mejora del desempeño logístico de Honduras a través de reformas sectoriales en los ámbitos regulatorio, institucional, de planificación y de facilitación comercial, que permita ganancias en la competitividad e integración regional. La presente operación es la segunda de una serie de tres operaciones bajo la modalidad de Préstamo Programático de Apoyo a Reformas de Política (PBP).
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
SECRETARIA DE FINANZAS
SECRETARIA DE FINANZAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRANSPORT
TRANSPORTE
111650000
Disbursement in second quarter of 2020
258039.63
Interest repayment in forth quarter of 2020
326670.66
Interest repayment in second quarter of 2021
325536.23
Interest repayment in forth quarter of 2021
336687.47
Interest repayment in second quarter of 2022
657983.99
Interest repayment in forth quarter of 2022
1181206.81
Interest repayment in second quarter of 2023
1372504.55
Interest repayment in forth quarter of 2023
HO-L1206 - LP para publicar - Inglés.pdf
Honduras. Loan proposal for the _Honduras Transportation and Freight Logistics Sector Reform Program II”.pdf
HO-L1206 - LP para publicar - Español.pdf
Honduras. Propuesta de prestamo para el _Programa de Reformas del Sector Transporte y Logistica de Carga de Honduras II” .pdf
XI-IATI-IADB-HO0222
Inter-American Development Bank
Social Protection Program
Programa Integral de Protección Social
EN
El objetivo principal es apoyar la acumulación de capital humano en los niños de las familias participantes en el Programa a través de una estrategia integral y comprehensiva de protección social que articule las acciones de las diversas entidades del sector.
PROGRAMA DE ASIGNACION FAMILIAR
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
Fund for Special Operations
Fund for Special Operations
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SOCIAL INVESTMENT
INVERSIONES SOCIALES
8000
Disbursement in third quarter of 2005
12000
Disbursement in forth quarter of 2005
56.33
Interest repayment in first quarter of 2006
12000
Disbursement in first quarter of 2006
150000
Disbursement in second quarter of 2006
100000
Disbursement in second quarter of 2006
12000
Disbursement in second quarter of 2006
100000
Disbursement in third quarter of 2006
762.4
Disbursement in third quarter of 2006
762.4
Interest repayment in third quarter of 2006
86051.34
Disbursement in third quarter of 2006
12000
Disbursement in third quarter of 2006
198264.58
Disbursement in forth quarter of 2006
167028.98
Disbursement in forth quarter of 2006
72312.52
Disbursement in forth quarter of 2006
97072.22
Disbursement in forth quarter of 2006
12000
Disbursement in forth quarter of 2006
36800.33
Disbursement in first quarter of 2007
4048.32
Disbursement in first quarter of 2007
4048.32
Interest repayment in first quarter of 2007
12000
Disbursement in first quarter of 2007
180417.9
Disbursement in second quarter of 2007
117557.39
Disbursement in second quarter of 2007
80000
Disbursement in second quarter of 2007
12000
Disbursement in second quarter of 2007
139679.53
Disbursement in third quarter of 2007
133227.99
Disbursement in third quarter of 2007
59929.45
Disbursement in third quarter of 2007
6996.95
Disbursement in third quarter of 2007
6996.95
Interest repayment in third quarter of 2007
81188.04
Disbursement in third quarter of 2007
12000
Disbursement in third quarter of 2007
1250000
Disbursement in forth quarter of 2007
1596648.65
Disbursement in forth quarter of 2007
609580.62
Disbursement in forth quarter of 2007
236594.03
Disbursement in forth quarter of 2007
12000
Disbursement in forth quarter of 2007
20130.44
Disbursement in first quarter of 2008
20130.44
Interest repayment in first quarter of 2008
455519.51
Disbursement in first quarter of 2008
12000
Disbursement in first quarter of 2008
400000
Disbursement in second quarter of 2008
287964.29
Disbursement in second quarter of 2008
12000
Disbursement in second quarter of 2008
176973.66
Disbursement in third quarter of 2008
1000000
Disbursement in third quarter of 2008
1015233.27
Disbursement in third quarter of 2008
32818.97
Disbursement in third quarter of 2008
32818.97
Interest repayment in third quarter of 2008
722080.37
Disbursement in third quarter of 2008
12000
Disbursement in third quarter of 2008
2475291.32
Disbursement in forth quarter of 2008
2691104.32
Disbursement in forth quarter of 2008
33554.37
Disbursement in forth quarter of 2008
230502.93
Disbursement in forth quarter of 2008
12000
Disbursement in forth quarter of 2008
68043.17
Disbursement in first quarter of 2009
68043.17
Interest repayment in first quarter of 2009
132449.98
Disbursement in first quarter of 2009
12000
Disbursement in first quarter of 2009
751226.23
Disbursement in second quarter of 2009
923588.76
Disbursement in second quarter of 2009
1000681.57
Disbursement in second quarter of 2009
12000
Disbursement in second quarter of 2009
84524.3
Disbursement in third quarter of 2009
84524.3
Interest repayment in third quarter of 2009
12000
Disbursement in third quarter of 2009
90273.5
Disbursement in first quarter of 2010
90273.5
Interest repayment in first quarter of 2010
664157
Disbursement in third quarter of 2010
92232.51
Disbursement in third quarter of 2010
92232.51
Interest repayment in third quarter of 2010
400772.68
Disbursement in third quarter of 2010
86794.99
Disbursement in forth quarter of 2010
196903.62
Disbursement in forth quarter of 2010
55169.44
Disbursement in first quarter of 2011
55169.44
Interest repayment in first quarter of 2011
42053.73
Interest repayment in first quarter of 2011
294642.55
Disbursement in third quarter of 2011
99853.23
Interest repayment in third quarter of 2011
99627.21
Interest repayment in first quarter of 2012
100546.45
Interest repayment in third quarter of 2012
99004.42
Interest repayment in first quarter of 2013
100821.92
Interest repayment in third quarter of 2013
99178.08
Interest repayment in first quarter of 2014
100821.92
Interest repayment in third quarter of 2014
99178.08
Interest repayment in first quarter of 2015
201643.84
Interest repayment in third quarter of 2015
333333.33
Loan repayment in third quarter of 2015
195933.53
Interest repayment in first quarter of 2016
333333.33
Loan repayment in first quarter of 2016
194389.8
Interest repayment in third quarter of 2016
333333.33
Loan repayment in third quarter of 2016
188108.39
Interest repayment in first quarter of 2017
333333.33
Loan repayment in first quarter of 2017
188200.91
Interest repayment in third quarter of 2017
333333.33
Loan repayment in third quarter of 2017
181844.75
Interest repayment in first quarter of 2018
333333.33
Loan repayment in first quarter of 2018
181479.45
Interest repayment in third quarter of 2018
333333.33
Loan repayment in third quarter of 2018
175214.61
Interest repayment in first quarter of 2019
333333.33
Loan repayment in first quarter of 2019
174757.99
Interest repayment in third quarter of 2019
333333.33
Loan repayment in third quarter of 2019
169348.01
Interest repayment in first quarter of 2020
333333.33
Loan repayment in first quarter of 2020
167559.2
Interest repayment in third quarter of 2020
333333.33
Loan repayment in third quarter of 2020
161707.21
Interest repayment in first quarter of 2021
333333.33
Loan repayment in first quarter of 2021
161278.54
Interest repayment in third quarter of 2021
333333.33
Loan repayment in third quarter of 2021
155379
Interest repayment in first quarter of 2022
333333.33
Loan repayment in first quarter of 2022
154593.61
Interest repayment in third quarter of 2022
333333.33
Loan repayment in third quarter of 2022
148767.12
Interest repayment in first quarter of 2023
333333.33
Loan repayment in first quarter of 2023
147872.15
Interest repayment in third quarter of 2023
333333.33
Loan repayment in third quarter of 2023
142799.01
Interest repayment in first quarter of 2024
333333.33
Loan repayment in first quarter of 2024
General Procurement Notice [35236989].PDF
Informe para Publicación_PMR-_HO0222-2011-1º-Periodo [36625205].PDF
Comprehensive Social Safety Net Program [416294].PDF
Programa Integral de Protección Social - PCR aprobado [36914783].PDF
Rapport pour Publication_PMR-_HO0222-2011-1º-Período [36624649].PDF
Relatório para publicação_PMR-_HO0222-2010-2º-Período [36310305].PDF
Rapport pour Publication_PMR-_HO0222-2010-2º-Período [36312207].PDF
Relatório para publicação_PMR-_HO0222-2011-1º-Período [36624070].PDF
Report for Publication_PMR-_HO0222-2010-2º-Period [36313368].PDF
Report for Publication_PMR-_HO0222-2011-1º-Period [36625767].PDF
Informe para Publicación_PMR-_HO0222-2010-2º-Periodo [36312793].PDF
XI-IATI-IADB-HO-L1211
Inter-American Development Bank
Comprehensive Rural Development and Productivity Project
Proyecto Integral de Desarrollo Rural y Productividad
The project's general objective is to sustainably increase the income of the beneficiary rural households in the Dry Corridor of Honduras. Its specific objective is to improve productive development in the project's target area by providing technologies, production-related technical assistance, and access to financing for the beneficiary population
El objetivo general consiste en incrementar de manera sostenible los ingresos de los hogares rurales beneficiarios en el Corredor Seco de Honduras (CSH). El objetivo específico es la mejora en el desarrollo productivo en la zona de intervención mediante la provisión de tecnologías, asistencia técnica productiva y acceso al financiamiento de la población beneficiaria.
SECRETARIA DE AGRICULTURA Y GANADERIA
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
PRIVATE FIRMS AND SME DEVELOPMENT
EMPRESAS PRIV Y DESARROLLO DE PYME
446802.0
467481.0
488160.0
508839.0
528840.0
548502.0
567147.0
584775.0
601725.0
616980.0
630879.0
643422.0
654270.0
662745.0
669864.0
674271.0
676983.0
677322.0
675966.0
671898.0
665796.0
658338.0
648168.0
636303.0
623082.0
608505.0
591894.0
574944.0
556299.0
537315.0
517314.0
496974.0
476295.0
455616.0
434598.0
414258.0
393240.0
373239.0
353577.0
334254.0
315609.0
297303.0
279675.0
263403.0
246792.0
231537.0
216960.0
203061.0
189840.0
177297.0
165432.0
154245.0
143397.0
133905.0
1808141.0
228923
Disbursement in forth quarter of 2020
769.22
Interest repayment in second quarter of 2021
626600
Disbursement in forth quarter of 2021
664.52
Interest repayment in forth quarter of 2021
2653.14
Interest repayment in second quarter of 2022
2321000
Disbursement in forth quarter of 2022
2321000
Disbursement in forth quarter of 2022
6102.31
Interest repayment in forth quarter of 2022
2321000
Disbursement in forth quarter of 2022
30895.11
Interest repayment in second quarter of 2023
39545.26
Interest repayment in forth quarter of 2023
3550000
Disbursement in forth quarter of 2023
HO-L1211 First period Jan-Jun 2023 - Public Report.PDF
HO-L1211 First period Jan-Jun 2022 - Public Report.PDF
HO-L1211 First period Jan-Jun 2020 - Public Report.pdf
Transformación Digital para una Mayor Competitividad.pdf
Comprehensive Rural Development and Productivity Project.pdf
HO-L1211 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1211 First period Jan-Jun 2021 - Public Report.pdf
HO-L1211_P817055_SP.pdf
HO-L1211 Second period Jan-Dec 2019-Public Report.pdf
HO-L1211 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1211 Second period Jan-Dec 2020 - Public Report.pdf
XI-IATI-IADB-HO-L1007
Inter-American Development Bank
Social Interest Housing Program
Programa de Vivienda de Interés Social
The program's objectives are to support the Government of Honduras' efforts adapt policy changes and to develop mechanisms that increase the availability and affordability of adequate housing, particularly for the majority of families currently unable to obtain such housing.
Los objetivos del Programa son apoyar los esfuerzos del Gobierno de Honduras en efectar cambios de política y desarrollar mecanisms que aumentan la disponibilidad y asequibilidad de vivienda adecuada, particularmente para la majoría de famiilias honureñas que actualmente no la pueden obtener.
REPUBLICA DE HONDURAS
SECRETARIA DE OBRAS PUBLICAS, TRANSPORTEY VIVIENDA
INTER AMERICAN DEVELOPMENT BANK
Fund for Special Operations
Fund for Special Operations
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Direccion General de Vivienda fortalecida Programa de Vivienda de Interés Social, Honduras
14.824173968, -86.600264243
URBAN DEVELOPMENT AND HOUSING
DESARROLLO Y VIVIENDA URBANOS
111000
Disbursement in forth quarter of 2007
12000
Disbursement in forth quarter of 2007
18000
Disbursement in first quarter of 2008
105000
Disbursement in second quarter of 2008
18000
Disbursement in second quarter of 2008
810.71
Interest repayment in third quarter of 2008
259326.49
Disbursement in third quarter of 2008
52918
Disbursement in third quarter of 2008
18000
Disbursement in third quarter of 2008
933909.11
Disbursement in forth quarter of 2008
72443.32
Disbursement in forth quarter of 2008
56127.95
Disbursement in forth quarter of 2008
1058007.68
Disbursement in forth quarter of 2008
18000
Disbursement in forth quarter of 2008
5729.14
Interest repayment in first quarter of 2009
645867.74
Disbursement in first quarter of 2009
18000
Disbursement in first quarter of 2009
750000
Disbursement in second quarter of 2009
313600
Disbursement in second quarter of 2009
18000
Disbursement in second quarter of 2009
17698.49
Interest repayment in third quarter of 2009
18000
Disbursement in third quarter of 2009
18000
Disbursement in forth quarter of 2009
18000
Disbursement in first quarter of 2010
982000
Disbursement in second quarter of 2010
313600
Disbursement in second quarter of 2010
18000
Disbursement in second quarter of 2010
568971.64
Disbursement in third quarter of 2010
1353399.03
Disbursement in third quarter of 2010
46866.46
Interest repayment in third quarter of 2010
426722.57
Disbursement in third quarter of 2010
334029.17
Disbursement in third quarter of 2010
129309.05
Disbursement in third quarter of 2010
1100000
Disbursement in third quarter of 2010
18000
Disbursement in third quarter of 2010
173759.33
Disbursement in forth quarter of 2010
1100000
Disbursement in forth quarter of 2010
429625.51
Disbursement in forth quarter of 2010
436064.38
Disbursement in forth quarter of 2010
18000
Disbursement in forth quarter of 2010
49218.12
Interest repayment in first quarter of 2011
2776000
Disbursement in first quarter of 2011
18000
Disbursement in first quarter of 2011
777174.38
Disbursement in second quarter of 2011
18000
Disbursement in second quarter of 2011
76056.06
Interest repayment in third quarter of 2011
18000
Disbursement in third quarter of 2011
265193.61
Disbursement in forth quarter of 2011
593362.82
Disbursement in forth quarter of 2011
522260.16
Disbursement in forth quarter of 2011
678272.2
Disbursement in forth quarter of 2011
1471187.74
Disbursement in forth quarter of 2011
18000
Disbursement in forth quarter of 2011
80682.07
Interest repayment in first quarter of 2012
200960.27
Disbursement in first quarter of 2012
325992.88
Disbursement in first quarter of 2012
431678.09
Disbursement in first quarter of 2012
1278967.38
Disbursement in second quarter of 2012
888939.38
Disbursement in third quarter of 2012
102595.77
Interest repayment in third quarter of 2012
1018248.41
Disbursement in third quarter of 2012
2350000
Disbursement in forth quarter of 2012
2550000
Disbursement in forth quarter of 2012
117702.26
Interest repayment in first quarter of 2013
145020.02
Disbursement in second quarter of 2013
1721061.69
Disbursement in second quarter of 2013
148620.6
Interest repayment in third quarter of 2013
778.01
Interest repayment in forth quarter of 2013
152788.91
Interest repayment in first quarter of 2014
147989.11
Interest repayment in third quarter of 2014
2159.78
Interest repayment in forth quarter of 2014
151232.88
Interest repayment in first quarter of 2015
148676.95
Interest repayment in third quarter of 2015
151093.92
Interest repayment in first quarter of 2016
149105.25
Interest repayment in third quarter of 2016
150806.62
Interest repayment in first quarter of 2017
297384.51
Interest repayment in third quarter of 2017
499748.36
Loan repayment in third quarter of 2017
297247.59
Interest repayment in first quarter of 2018
499748.36
Loan repayment in first quarter of 2018
287471.69
Interest repayment in third quarter of 2018
499748.36
Loan repayment in third quarter of 2018
287143.09
Interest repayment in first quarter of 2019
499748.36
Loan repayment in first quarter of 2019
277558.87
Interest repayment in third quarter of 2019
499748.36
Loan repayment in third quarter of 2019
277005.52
Interest repayment in first quarter of 2020
499748.36
Loan repayment in first quarter of 2020
268389.45
Interest repayment in third quarter of 2020
499748.36
Loan repayment in third quarter of 2020
266425.02
Interest repayment in first quarter of 2021
499748.36
Loan repayment in first quarter of 2021
257733.24
Interest repayment in third quarter of 2021
499748.36
Loan repayment in third quarter of 2021
256966.5
Interest repayment in first quarter of 2022
499748.36
Loan repayment in first quarter of 2022
247738.27
Interest repayment in third quarter of 2022
499748.36
Loan repayment in third quarter of 2022
246889.38
Interest repayment in first quarter of 2023
499748.36
Loan repayment in first quarter of 2023
237852.83
Interest repayment in third quarter of 2023
499748.36
Loan repayment in third quarter of 2023
236686.43
Interest repayment in first quarter of 2024
499748.36
Loan repayment in first quarter of 2024
Rapport pour Publication_PMR-_HO-L1007-2012-2º-Período [37873954].PDF
Relatório para publicação_PMR-_HO-L1007-2013-1º-Período [38265508].PDF
Informe de Gestión Ambiental y Social [38242324].pdf
Programa de Vivienda de Interés Social (HO-L1007) [857417].PDF
Programa de Vivienda de Interés Social [789089].DOC
HO-L1007 Second period Jan-Dec 2013-Public Report [40174713].PDF
Marco Lógico [38242272].PDF
Programa de Vivienda de Interés Social [788701].DOC
Árbol de Objetivos y Desglose del Programa en Dos Fases [38242302].pdf
Focalización de los subsidios para Vivienda_ [38242332].pdf
Encuestas EFIS [38242284].pdf
Informe para Publicación_PMR-_HO-L1007-2011-2º-Periodo [36925276].PDF
Rapport pour Publication_PMR-_HO-L1007-2010-2º-Período [36312178].PDF
Low-Income Housing Program (HO-L1007) [857409].PDF
Diseño del SIP [38242307].PDF
Puntaje Selección Barrios [38242385].PDF
Relatório para publicação_PMR-_HO-L1007-2012-1º-Período [37352178].PDF
Report for Publication_PMR-_HO-L1007-2011-2º-Period [36928015].PDF
Cronología del Programa [38242342].pdf
Report for Publication_PMR-_HO-L1007-2012-1º-Period [37354160].PDF
Relación de donantes y cooperaciones que intervinieron en el PVIS [38242345].pdf
Reglamento Operativo [38242437].PDF
Informe para Publicación_PMR-_HO-L1007-2012-1º-Periodo [37353498].PDF
Contrato Modificatorio [38242380].PDF
Evaluación Cualitativa Componente 2_2 de Subsidios Colectivos [40288141].pdf
Atribuciones Componente 2_2_ [38242319].pdf
Indicadores de Déficit Cuantitativo y Cualitativo de Vivienda [38242329].PDF
HO-L1007 First period Jan-Jun 2014-Public Report [40182056].PDF
Report for Publication_PMR-_HO-L1007-2010-2º-Period [36313340].PDF
Informe para Publicación_PMR-_HO-L1007-2011-1º-Periodo [36625176].PDF
Report for Publication_PMR-_HO-L1007-2011-1º-Period [36625739].PDF
Programa de Vivienda de Interés Social [792057].DOC
Informe para Publicación_PMR-_HO-L1007-2010-2º-Periodo [36312766].PDF
Relatório para publicação_PMR-_HO-L1007-2011-2º-Período [36918683].PDF
Obras FHIS [38242286].pdf
Resumen Diagnóstico del PVIS [38242293].PDF
Costo Inicial por Familia del Componente 2_2 a precios del año 2013 [38242338].pdf
Informe para Publicación_PMR-_HO-L1007-2013-1º-Periodo [38266838].PDF
Desembolsos Totales del Componente 2_2 [38242335].pdf
Plan Integral de Mejoramiento de Barrio de la Colonia Villafranca (PIMB) [38242410].PDF
Árbol de Problemas y Diagrama Institucional Inicial Sector Vivienda [38242295].pdf
Report for Publication_PMR-_HO-L1007-2013-1º-Period [38267512].PDF
Rapport pour Publication_PMR-_HO-L1007-2012-1º-Período [37352841].PDF
Sistema de Evaluación y Monitoreo de Programas de Vivienda (SEM) [38242415].PDF
HO-L1007 [36358483].PDF
Relatório para publicação_PMR-_HO-L1007-2011-1º-Período [36624041].PDF
Relatório para publicação_PMR-_HO-L1007-2010-2º-Período [36310278].PDF
Rapport pour Publication_PMR-_HO-L1007-2011-1º-Período [36624622].PDF
Informe de Evaluación Cualitativa de los Resultados del Programa [40287725].pdf
Rapport pour Publication_PMR-_HO-L1007-2011-2º-Período [36922691].PDF
Relatório para publicação_PMR-_HO-L1007-2012-2º-Período [37873286].PDF
Metas Modificadas [38242278].PDF
Report for Publication_PMR-_HO-L1007-2012-2º-Period [37875438].PDF
Atribuciones Componente 2_1 [38242313].PDF
Rapport pour Publication_PMR-_HO-L1007-2013-1º-Período [38266173].PDF
Programa de Vivienda de Interés Social [40282555].PDF
Informe para Publicación_PMR-_HO-L1007-2012-2º-Periodo [37874614].PDF
1. Instrumentos Innovadores y Monitoreo del Sector Vivienda desarrollados.
1. Instrumentos Innovadores y Monitoreo del Sector Vivienda desarrollados.
Propuesta para la canalización de remesas elaborado
Propuesta para la canalización de remesas elaborado
Direccion General de Vivienda fortalecida
Direccion General de Vivienda fortalecida
Sistema de información, evaluación y monitoreo del programa implementado
Sistema de información, evaluación y monitoreo del programa implementado
Evaluación intermedia y de impacto del componente subsidios habitacionales
Evaluación intermedia y de impacto del componente subsidios habitacionales
2. Subsidios Habitacionales Individuales otorgados
2. Subsidios Habitacionales Individuales otorgados
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
Subsidios Habitacionales Individuales desembolsado
3. Susidios Colectivos (para Mejoramiento de barrios) otorgados
3. Susidios Colectivos (para Mejoramiento de barrios) otorgados
Proyectos de emergencia ejecutados
Proyectos de emergencia ejecutados
Proyectos de emergencia ejecutados
Proyectos de emergencia ejecutados
Subsidios Colectivos (para Mejoramiento de barrios) ejecutado = Barrio mejorado
Subsidios Colectivos (para Mejoramiento de barrios) ejecutado = Barrio mejorado
Subsidios Colectivos (para Mejoramiento de barrios) ejecutado = Barrio mejorado
Subsidios Colectivos (para Mejoramiento de barrios) ejecutado = Barrio mejorado
Administración del Programa
Administración del Programa
Gestión del Programa FHIS
Gestión del Programa FHIS
XI-IATI-IADB-HO-L1179
Inter-American Development Bank
Sustainable Forest Management
Manejo Sostenible de Bosques
The general objective of the project is to recover and maintain forest ecosystem services in priority watersheds affected by the bark beetle. The specific objectives are: (i) to restore the areas affected by the bark beetle in both public and private forests; (ii) to strengthen the government's forest health system and create forest management alternatives adapted to the impacts of climate change and climate variability; and (iii) to expand access to climate financing to foster sustainable forest management (SFM)
El proyecto tiene como objetivo general recuperar y mantener los servicios ecosistémicos de los bosques en cuencas prioritarias afectadas por la plaga del gorgojo. Los objetivos específicos son: (i) restaurar las zonas afectadas por el gorgojo en bosques públicos como privados; (ii) fortalecer el sistema de sanidad forestal del Gobierno y generar alternativas de manejo de los bosques adaptadas a los impactos del cambio climático y la variabilidad climática; y (iii) mejorar el acceso a financiamiento climático para fomentar el Manejo Forestal Sostenible (MFS)
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
PROGRAMA DE LA RED SOLIDARIA
PROGRAMA DE LA RED SOLIDARIA
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Hectáreas de bosque de pino (públicas) afectadas por el gorgojo en proceso de restauracion
Manejo Sostenible de Bosques, Honduras
14.824173968, -86.600264243
ENVIRONMENT AND NATURAL DISASTERS
MEDIO AMBIENTE Y DESASTRES NATURALE
749208
Disbursement in forth quarter of 2017
2606.46
Interest repayment in first quarter of 2018
7283.74
Interest repayment in third quarter of 2018
1728514
Disbursement in third quarter of 2018
25746.64
Interest repayment in first quarter of 2019
28314.73
Interest repayment in third quarter of 2019
3991647
Disbursement in third quarter of 2019
3877.5
Disbursement in forth quarter of 2019
16520
Disbursement in first quarter of 2020
5170
Disbursement in first quarter of 2020
55814.79
Interest repayment in first quarter of 2020
65405.34
Disbursement in second quarter of 2020
1701396.8
Disbursement in third quarter of 2020
23969.66
Disbursement in third quarter of 2020
62665.38
Interest repayment in third quarter of 2020
3000000
Disbursement in forth quarter of 2020
70655.56
Interest repayment in first quarter of 2021
28560
Disbursement in first quarter of 2021
71440
Disbursement in second quarter of 2021
82612.01
Interest repayment in third quarter of 2021
4500000
Disbursement in third quarter of 2021
49900
Disbursement in forth quarter of 2021
49900
Disbursement in forth quarter of 2021
128312.59
Interest repayment in first quarter of 2022
4460000
Disbursement in third quarter of 2022
148331.41
Interest repayment in third quarter of 2022
223471.2
Interest repayment in first quarter of 2023
250353.16
Loan repayment in first quarter of 2023
227390.96
Interest repayment in third quarter of 2023
250353.16
Loan repayment in third quarter of 2023
4554491.7
Disbursement in forth quarter of 2023
266299.57
Interest repayment in first quarter of 2024
308495.6
Loan repayment in first quarter of 2024
Informe Consultas Sociales - HO-L1179 [40746307].PDF
HO-L1179_P521800_SP.pdf
LP - Estudio para el diseño del subcomponente de sanidad forestal (HO-L1179) [40693449].PDF
HO-L1179_P967054_SP.pdf
LP - Enlace opcional - Estudio para el diseño del subcomponente de gobernanza para mejorar el acceso a financiam [40693304].PDF
HO-L1179 Second period Jan-Dec 2022 - Public Report.PDF
POD - Enlace opcional - Análisis Económico del Proyecto (HO-L1179) [40695172].docx
LP - Reporte componente de apoyo al sistema de monitoreo forestal del Instituto de Conservación (HO-L1179) [40693444].PDF
Sustainable Forest Management (HO-L1179) [40756037].PDF
HO-L1179 First period Jan-Jun 2021 - Public Report.pdf
LP - Enlace opcional - Variabilidad Climática yCambio Climático en Honduras (HO-L1179) [40693278].PDF
LP - Enlace opcional - Ley Forestal Areas Protegidas Vida Silvestre (HO-L1179) [40695480].PDF
Manejo Sostenible de Bosques (HO-L1179) [40756026].PDF
Modificatorio No 2 - Manejo Sostenible de Bosques.pdf
LP- Enlace - PEP (HO-L1179) [40695500].PDF
HO-L1179 First period Jan-Jun 2017-Public Report.pdf
LP - Enlace - Plan de Adquisiciones (PA) (HO-L1179) [40695509].xlsx
HO-L1179 1531.pdf
HO-L1179 First period Jan-Jun 2018-Public Report.pdf
LP - Enlace - Informe de Gestión Ambiental y Social (IGAS) (HO-L1179) [40695393].PDF
Plan de Gestión Ambiental y Social (PGAS) (HO-L1179) [40694999].docx
LP - Enlace Opcional - Análisis de Capacidad Institucional de ICF y SEFIN (HO-L1179) [40695518].docx
LP - Enlace opcional - Estudio costo del agua Tegucigalpa (HO-L1179) [40693256].PDF
HO-L1179 First period Jan-Jun 2022 - Public Report.PDF
LP - Enlace opcional - Reporte sobre evaluación de la deforestación (HO-L1179) [40693290].PDF
HO-L1179 Second period Jan-Dec 2020 - Public Report.pdf
LP - Enlace opcional - Situación de los Recursos Hídricos en Centroamérica (HO-L1179) [40693272].PDF
LP - Reporte simulación hidrológica del impacto gorgojo cuencas (HO-L1179) [40693435].PDF
HO-L1179_P642279_SP.pdf
HO-L1179_P523858_SP.pdf
HO-L1179 Second period Jan-Dec 2018-Public Report.pdf
HO-L1179 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1179 Second period Jan-Dec 2017-Public Report.pdf
HO-L1179 First period Jan-Jun 2020 - Public Report.pdf
HO-L1179 Second period Jan-Dec 2016-Public Report.pdf
HO-L1179 First period Jan-Jun 2023 - Public Report.PDF
LP - Enlace opcional - Estudio para el diseño del subcomponente de gobernanza forestal (HO-L1179) [40693287].PDF
POD - Enlace - POA (HO-L1179) [40695497].PDF
LP - Enlace opcional - Reporte de priorización de zonas de intervención (HO-L1179) [40693296].PDF
HO-L1179 First period Jan-Jun 2019-Public Report.pdf
LP - Resumen de bibliografia sobre la efectividad de la intervencion (HO-L1179) [40695451].docx
Contrato - Manejo Sostenible de Bosques.pdf
Modificatorio No.1 - Proyecto de Manejo Sostenible de Bosques.pdf
HO-L1179 Second period Jan-Dec 2019-Public Report.pdf
Componente I: Restauración de bosques afectados por la plaga del gorgojo
Componente I: Restauración de bosques afectados por la plaga del gorgojo
Hectáreas de bosque de pino (públicas) afectadas por el gorgojo en proceso de restauracion
Hectáreas de bosque de pino (públicas) afectadas por el gorgojo en proceso de restauracion
Componente II: Fortalecimiento del sistema de sanidad forestal y mejora de la resiliencia de los bosques al Cambio Climático
Componente II: Fortalecimiento del sistema de sanidad forestal y mejora de la resiliencia de los bosques al Cambio Climático
Sistema de alerta temprana de plagas y restauracion forestal operando
Sistema de alerta temprana de plagas y restauracion forestal operando
XI-IATI-IADB-HO-L1065
Inter-American Development Bank
Strengthen the Financial Security Network and Improve Access to Financing
Fortalecimiento de la Red de Seguridad Financiera y Mejora Acceso Financiamiento
The objective of the operation is achieving development and strengthening of financial markets. In particular, it is expected that regulatory changes already implemented and those covered in this operation, achieve greater stability of financial intermediaries, enhancing transparency in financial services and increasing the value of bank credit to the private sector.
El Objetivo de la operación es lograr el desarrollo y fortalecimiento de los mercados financieros. En particular, se espera que con los cambios regulatorios ya implantados y con los que se contemplan en esta operación, se logre una mayor estabilidad de los intermediarios financieros, dar más transparencia a los servicios financieros e incrementar el valor del crédito bancario al sector privado.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
COMISION NACIONAL DE BANCOS Y SEGUROS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
FINANCIAL MARKETS
MERCADOS FINANCIEROS
12000000
Disbursement in forth quarter of 2010
28000000
Disbursement in forth quarter of 2010
13643.84
Interest repayment in second quarter of 2011
540860.27
Interest repayment in second quarter of 2011
15123.29
Interest repayment in forth quarter of 2011
735395.07
Interest repayment in forth quarter of 2011
14926.57
Interest repayment in second quarter of 2012
705999.66
Interest repayment in second quarter of 2012
15081.97
Interest repayment in forth quarter of 2012
708048.09
Interest repayment in forth quarter of 2012
14868.17
Interest repayment in second quarter of 2013
722145.13
Interest repayment in second quarter of 2013
15123.29
Interest repayment in forth quarter of 2013
741041.1
Interest repayment in forth quarter of 2013
14876.71
Interest repayment in second quarter of 2014
730055.89
Interest repayment in second quarter of 2014
15123.29
Interest repayment in forth quarter of 2014
742452.6
Interest repayment in forth quarter of 2014
14876.71
Interest repayment in second quarter of 2015
730347.39
Interest repayment in second quarter of 2015
15123.29
Interest repayment in forth quarter of 2015
742452.6
Interest repayment in forth quarter of 2015
14926.57
Interest repayment in second quarter of 2016
808189.29
Interest repayment in second quarter of 2016
15081.97
Interest repayment in forth quarter of 2016
782653.55
Interest repayment in forth quarter of 2016
571428.57
Loan repayment in forth quarter of 2016
738356.64
Interest repayment in second quarter of 2017
571428.57
Loan repayment in second quarter of 2017
727271.71
Interest repayment in forth quarter of 2017
571428.57
Loan repayment in forth quarter of 2017
695359.84
Interest repayment in second quarter of 2018
571428.57
Loan repayment in second quarter of 2018
690486.12
Interest repayment in forth quarter of 2018
571428.57
Loan repayment in forth quarter of 2018
664383.23
Interest repayment in second quarter of 2019
571428.57
Loan repayment in second quarter of 2019
660469.98
Interest repayment in forth quarter of 2019
571428.57
Loan repayment in forth quarter of 2019
636902.74
Interest repayment in second quarter of 2020
571428.57
Loan repayment in second quarter of 2020
628568.62
Interest repayment in forth quarter of 2020
571428.57
Loan repayment in forth quarter of 2020
614019.07
Interest repayment in second quarter of 2021
571428.57
Loan repayment in second quarter of 2021
611672.17
Interest repayment in forth quarter of 2021
571428.57
Loan repayment in forth quarter of 2021
586652.52
Interest repayment in second quarter of 2022
571428.57
Loan repayment in second quarter of 2022
581079.93
Interest repayment in forth quarter of 2022
571428.57
Loan repayment in forth quarter of 2022
552446.18
Interest repayment in second quarter of 2023
571428.57
Loan repayment in second quarter of 2023
545446.58
Interest repayment in forth quarter of 2023
571428.57
Loan repayment in forth quarter of 2023
Loan Proposal [35437489].PDF
Contrato - Programa de Fortalecimiento de la Red de Seguridad Financiera y Mejora del Acceso al Financiamiento.pdf
Propuesta de Préstamo [35437490].PDF
XI-IATI-IADB-HO0202
Inter-American Development Bank
Middle Education and Labor Program
Programa de Educación Media y Laboral
EN
El objetivo es elevar los niveles de calificación y la empleabilidad de jóvenes y adultos desempleados, a través de una nueva estrategia de fomento al empleo y el desarrollo de modalidades costo-eficientes la educación media técnica y de atención no escolarizada para adultos.
SECRETARIA DE EDUCACION
Fund for Special Operations
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
EDUCATION
EDUCACION
7100
Disbursement in second quarter of 2005
559600
Disbursement in third quarter of 2005
22900
Disbursement in third quarter of 2005
23000
Disbursement in forth quarter of 2005
23000
Disbursement in first quarter of 2006
1854.76
Disbursement in second quarter of 2006
1854.76
Interest repayment in second quarter of 2006
1953.29
Interest repayment in second quarter of 2006
23000
Disbursement in second quarter of 2006
23000
Disbursement in third quarter of 2006
1690.2
Disbursement in forth quarter of 2006
1690.2
Interest repayment in forth quarter of 2006
1573.86
Interest repayment in forth quarter of 2006
98751.9
Disbursement in forth quarter of 2006
345950
Disbursement in forth quarter of 2006
71566.42
Disbursement in forth quarter of 2006
462199.51
Disbursement in forth quarter of 2006
77249.73
Disbursement in forth quarter of 2006
23000
Disbursement in forth quarter of 2006
23000
Disbursement in first quarter of 2007
4632.88
Disbursement in second quarter of 2007
4632.88
Interest repayment in second quarter of 2007
2461.35
Interest repayment in second quarter of 2007
107513.77
Disbursement in second quarter of 2007
6519
Disbursement in second quarter of 2007
50182.41
Disbursement in third quarter of 2007
6300
Disbursement in third quarter of 2007
6109.61
Disbursement in forth quarter of 2007
6109.61
Interest repayment in forth quarter of 2007
856090
Disbursement in forth quarter of 2007
3343.04
Interest repayment in forth quarter of 2007
150104.59
Disbursement in forth quarter of 2007
161681.44
Disbursement in forth quarter of 2007
103450
Disbursement in forth quarter of 2007
167050.08
Disbursement in forth quarter of 2007
227950.99
Disbursement in forth quarter of 2007
6300
Disbursement in forth quarter of 2007
242727.95
Disbursement in first quarter of 2008
93749.43
Disbursement in first quarter of 2008
6300
Disbursement in first quarter of 2008
194739.05
Disbursement in second quarter of 2008
11745.88
Disbursement in second quarter of 2008
11745.88
Interest repayment in second quarter of 2008
204786.46
Disbursement in second quarter of 2008
179947.62
Disbursement in second quarter of 2008
2227.46
Interest repayment in second quarter of 2008
64320.42
Disbursement in second quarter of 2008
6300
Disbursement in second quarter of 2008
165038.38
Disbursement in third quarter of 2008
3202.12
Interest repayment in third quarter of 2008
504588.3
Disbursement in third quarter of 2008
6300
Disbursement in third quarter of 2008
16496.01
Disbursement in forth quarter of 2008
16496.01
Interest repayment in forth quarter of 2008
7018.41
Interest repayment in forth quarter of 2008
500539.21
Disbursement in forth quarter of 2008
83619.26
Disbursement in forth quarter of 2008
337395.97
Disbursement in forth quarter of 2008
72007.78
Disbursement in forth quarter of 2008
134122.76
Disbursement in forth quarter of 2008
117337.67
Disbursement in forth quarter of 2008
64777.62
Disbursement in forth quarter of 2008
164363.79
Disbursement in forth quarter of 2008
244395.89
Disbursement in forth quarter of 2008
120856.73
Disbursement in forth quarter of 2008
116712.36
Disbursement in first quarter of 2009
337384.5
Disbursement in first quarter of 2009
85921.09
Disbursement in first quarter of 2009
350766.98
Disbursement in second quarter of 2009
25043.23
Interest repayment in second quarter of 2009
9368.21
Interest repayment in second quarter of 2009
118609.03
Disbursement in second quarter of 2009
89564.12
Disbursement in second quarter of 2009
125035.43
Disbursement in second quarter of 2009
109977.08
Disbursement in second quarter of 2009
257540.71
Disbursement in second quarter of 2009
31093.84
Disbursement in forth quarter of 2009
31093.84
Interest repayment in forth quarter of 2009
3710.95
Interest repayment in forth quarter of 2009
31303.72
Disbursement in second quarter of 2010
31303.72
Interest repayment in second quarter of 2010
21340.65
Interest repayment in second quarter of 2010
614173.92
Disbursement in second quarter of 2010
218014
Disbursement in second quarter of 2010
699312.79
Disbursement in second quarter of 2010
407902.72
Disbursement in third quarter of 2010
429985.79
Disbursement in third quarter of 2010
36833.44
Disbursement in forth quarter of 2010
36833.44
Interest repayment in forth quarter of 2010
13912.67
Interest repayment in forth quarter of 2010
130274.79
Disbursement in forth quarter of 2010
1544355.1
Disbursement in forth quarter of 2010
186728.43
Disbursement in forth quarter of 2010
220222.3
Disbursement in forth quarter of 2010
296208
Disbursement in forth quarter of 2010
47312.09
Disbursement in second quarter of 2011
65908
Interest repayment in second quarter of 2011
1056198.76
Disbursement in second quarter of 2011
2299154.04
Disbursement in second quarter of 2011
851591.03
Disbursement in third quarter of 2011
624076.12
Disbursement in third quarter of 2011
23475.11
Interest repayment in forth quarter of 2011
56113.23
Disbursement in forth quarter of 2011
56113.23
Interest repayment in forth quarter of 2011
289880.46
Disbursement in forth quarter of 2011
616181.11
Disbursement in forth quarter of 2011
238643.39
Disbursement in forth quarter of 2011
111356.61
Disbursement in forth quarter of 2011
27057.86
Disbursement in forth quarter of 2011
27057.86
Interest repayment in forth quarter of 2011
72037.86
Interest repayment in first quarter of 2012
98810.62
Interest repayment in forth quarter of 2012
3278.22
Interest repayment in first quarter of 2013
96508.58
Interest repayment in second quarter of 2013
93760.41
Interest repayment in forth quarter of 2013
96508.36
Interest repayment in second quarter of 2014
97038.63
Interest repayment in forth quarter of 2014
193016.74
Interest repayment in second quarter of 2015
322578.33
Loan repayment in second quarter of 2015
190842.65
Interest repayment in forth quarter of 2015
322578.32
Loan repayment in forth quarter of 2015
187298.17
Interest repayment in second quarter of 2016
322578.34
Loan repayment in second quarter of 2016
183869.65
Interest repayment in forth quarter of 2016
322578.32
Loan repayment in forth quarter of 2016
179848.56
Interest repayment in second quarter of 2017
322578.34
Loan repayment in second quarter of 2017
177886.48
Interest repayment in forth quarter of 2017
322578.33
Loan repayment in forth quarter of 2017
173608.99
Interest repayment in second quarter of 2018
322578.33
Loan repayment in second quarter of 2018
171399.58
Interest repayment in forth quarter of 2018
322578.33
Loan repayment in forth quarter of 2018
167175.11
Interest repayment in second quarter of 2019
322578.33
Loan repayment in second quarter of 2019
164965.68
Interest repayment in forth quarter of 2019
322578.33
Loan repayment in forth quarter of 2019
161494.41
Interest repayment in second quarter of 2020
322578.33
Loan repayment in second quarter of 2020
158045.76
Interest repayment in forth quarter of 2020
322578.33
Loan repayment in forth quarter of 2020
154216.34
Interest repayment in second quarter of 2021
322578.33
Loan repayment in second quarter of 2021
152027.19
Interest repayment in forth quarter of 2021
322578.33
Loan repayment in forth quarter of 2021
147926.46
Interest repayment in second quarter of 2022
322578.33
Loan repayment in second quarter of 2022
145557.94
Interest repayment in forth quarter of 2022
322578.33
Loan repayment in forth quarter of 2022
141474.9
Interest repayment in second quarter of 2023
322578.33
Loan repayment in second quarter of 2023
139000.33
Interest repayment in forth quarter of 2023
322578.33
Loan repayment in forth quarter of 2023
Rapport pour Publication_PMR-_HO0202-2011-2º-Período [37298012].PDF
General Procurement [35236520].PDF
Rapport pour Publication_PMR-_HO0202-2011-1º-Período [36624644].PDF
Informe para Publicación_PMR-_HO0202-2011-2º-Periodo [37298203].PDF
HONDURAS_ Programa de Educación Media y Laboral_ PCR [38340185].PDF
CONTRATACIÓN DE FIRMA CONSULTORA QUE ELABORARÁ EL DISEÑO DE [35237967].PDF
Report for Publication_PMR-_HO0202-2010-2º-Period [36313361].PDF
Report for Publication_PMR-_HO0202-2011-2º-Period [37298399].PDF
Secondary Education and Job Training Program [416305].PDF
Relatório para publicação_PMR-_HO0202-2011-1º-Período [36624064].PDF
Rapport pour Publication_PMR-_HO0202-2010-2º-Período [36312199].PDF
Relatório para publicação_PMR-_HO0202-2010-2º-Período [36310298].PDF
Informe para Publicación_PMR-_HO0202-2010-2º-Periodo [36312786].PDF
Report for Publication_PMR-_HO0202-2011-1º-Period [36625761].PDF
Relatório para publicação_PMR-_HO0202-2011-2º-Período [37297820].PDF
Informe para Publicación_PMR-_HO0202-2011-1º-Periodo [36625200].PDF
XI-IATI-IADB-HO-L1189
Inter-American Development Bank
Programmatic Support for Structural Reforms in the Electricity Sector. Third Loan
Apoyo Programático a Reformas Estructurales del Sector Eléctrico. Tercer Préstamo
The general objective of the programmatic series and specifically from the third and last programmatic operation is to support the Government of Honduras in implementing the sector reforms and policies needed to enhance financial sustainability, operational efficiency, and security of supply in the electricity sector. The specific objectives are to: (i) strengthen the sector, institutional capacity and regulatory framework; (ii) enhance financial sustainability and operational efficiency; and (iii) adopt energy policies aimed at ensuring a secure supply of electricity. The Operation is aligned with the IDB -Country strategy to improve the efficiency of the power sector.
El objetivo general de la serie programática y especificamente de la tercera y ultima operación programatica es apoyar al Gobierno de Honduras en la implementación de reformas y políticas sectoriales necesarias para mejorar la sostenibilidad financiera, la eficiencia operativa y la seguridad del suministro en su sector eléctrico. Los objetivos específicos son: (i) fortalecer la capacidad institucional y el marco regulatorio sectorial; (ii) mejorar la sostenibilidad financiera y eficiencia operativa; y (iii) adoptar políticas energéticas orientadas a garantizar la seguridad del suministro eléctrico. La Operación está alineada con la Estrategia del Banco con el pais que busca mejorar la eficiencia del sector eléctrico.
SECRETARIA DE FINANZAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
ENERGY
ENERGIA
50000000
Disbursement in forth quarter of 2018
499528.77
Interest repayment in second quarter of 2019
516613.7
Interest repayment in forth quarter of 2019
407822.83
Interest repayment in second quarter of 2020
236685.8
Interest repayment in forth quarter of 2020
208525.77
Interest repayment in second quarter of 2021
203800.01
Interest repayment in forth quarter of 2021
215799.99
Interest repayment in second quarter of 2022
566375.57
Interest repayment in forth quarter of 2022
893846.91
Interest repayment in second quarter of 2023
1022071.92
Interest repayment in forth quarter of 2023
Matriz Comparativa- HO-L1189.docx
Loan Proposal.pdf
Propuesta de Préstamo.pdf
Programmatic Support for Structural Reforms in the Electricity Sector.pdf
Contrato - Apoyo Programático a Reformas del Sector Eléctrico - Tercer Préstamo.pdf
Plan de Seguimiento y Evaluacion (HO-L1189).docx
HO-L1189 - Analisis de la Contribución a la Integracion Regional Competitiva.doc
HO-L1189_Anexo_Evaluación_Económica.docx
HO-L1189 Análisis del Cumplimiento de la Política de Servicios Públicos.doc
HO-L1189 First period Jan-Jun 2018-Public Report.pdf
HO-L1189 Second period Jan-Dec 2017-Public Report.pdf
XI-IATI-IADB-HO-L1089
Inter-American Development Bank
Improvent PPP Atlantic Corridor. Suplementary Financing II
Mejoramiento del Corredor del Atlántico del PPP. Préstamo Suplementario II
The general objective of the project remains the same; to reduce the vehicle operational cost, and travel times. In addition, the rehabilitation of the road will result in the improvement of the accessibility, road safety, trade and regional integration enhancement.
El objetivo general del proyecto sigue siendo el mismo; reducir los costos de operación vehicular y tiempo de viaje. Adicionalmente la rehabilitación de la carretera resultará en la mejora de la accesibilidad, la seguridad vial, la facilitación del comercio e integración regional.
REPUBLICA DE HONDURAS
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRANSPORT
TRANSPORTE
1070214.9
Disbursement in first quarter of 2014
2497168.1
Disbursement in first quarter of 2014
791.67
Interest repayment in second quarter of 2014
8571.1
Interest repayment in second quarter of 2014
4089785.1
Disbursement in third quarter of 2014
9542831.9
Disbursement in third quarter of 2014
4786.93
Interest repayment in forth quarter of 2014
50170.13
Interest repayment in forth quarter of 2014
5661296.98
Loan repayment in second quarter of 2015
6432.33
Interest repayment in second quarter of 2015
68783.03
Interest repayment in second quarter of 2015
6359769.75
Loan repayment in forth quarter of 2015
6467.67
Interest repayment in forth quarter of 2015
151729.01
Interest repayment in forth quarter of 2015
6443.85
Interest repayment in second quarter of 2016
272031.78
Interest repayment in second quarter of 2016
6442.9
Interest repayment in forth quarter of 2016
229022.14
Interest repayment in forth quarter of 2016
219307.69
Interest repayment in second quarter of 2017
218020.59
Interest repayment in forth quarter of 2017
214259.13
Interest repayment in second quarter of 2018
215005.66
Interest repayment in forth quarter of 2018
213830.77
Interest repayment in second quarter of 2019
250557.35
Loan repayment in second quarter of 2019
210660.98
Interest repayment in forth quarter of 2019
250557.35
Loan repayment in forth quarter of 2019
205832.67
Interest repayment in second quarter of 2020
250557.35
Loan repayment in second quarter of 2020
201396.07
Interest repayment in forth quarter of 2020
250557.35
Loan repayment in forth quarter of 2020
201134.78
Interest repayment in second quarter of 2021
250557.35
Loan repayment in second quarter of 2021
198635.08
Interest repayment in forth quarter of 2021
250557.35
Loan repayment in forth quarter of 2021
193152.38
Interest repayment in second quarter of 2022
250557.35
Loan repayment in second quarter of 2022
189743.34
Interest repayment in forth quarter of 2022
250557.35
Loan repayment in forth quarter of 2022
182118.85
Interest repayment in second quarter of 2023
250557.35
Loan repayment in second quarter of 2023
178353.07
Interest repayment in forth quarter of 2023
250557.35
Loan repayment in forth quarter of 2023
HO-L1089 First period Jan-Jun 2015-Public Report (2) [40194316].PDF
Enlace Electrónico Opcional 2_ Anexo de Análisis Económico _ POD [37222878].PDF
Enlace Electrónico Requerido 4_ Plan Operativo Anual (POA) _ POD [37223041].PDF
Informe de Gestión Ambiental y Social y Anexos [37222978].PDF
Report for Publication_PMR-_HO-L1089-2013-1º-Period [38267532].PDF
HO-L1089 Second period Jan-Dec 2014-Public Report [39824164].PDF
Rapport pour Publication_PMR-_HO-L1089-2013-1º-Período [38266193].PDF
Enlace Electrónico Requerido 3_ Plan de Ejecución del Proyecto (PEP) _ POD [37223050].PDF
Informe para Publicación_PMR-_HO-L1089-2013-1º-Periodo [38266858].PDF
HONDURAS_ Improvement of the Plan Puebla-Panama Atlantic Corridor Program (Sections of Highway CA-5 North)_ Supp [37428172].PDF
Enlace Electrónico Opcional 4_ Documento Experiencia MCA H en Gestión de Proyectos - POD [37222843].doc
Enlace Electrónico Opcional 6_ Visión General Modelo HDM-4 _ POD [37222840].docx
Enlace Electrónico Opcional 3_ Referencias Tecnicas sobre Seguridad Vial _ POD [37222849].DOC
HONDURAS_ Mejoramiento del Corredor Atlántico del PPP (Tramos de la CA-5 Norte) Financiamiento Suplementario II [37428259].PDF
HO-L1089_Second_period_Jan-Dec_2013-Public_Report [39813936].PDF
Enlace Electrónico Opcional 9_ Plan Nacional de Acción para la Seguridad Vial de Honduras _ POD [37222918].PDF
Enlace Electrónico Opcional 7_ Informe de implementación de proyecto del Banco Mundial IDA 34329 _ POD [37219221].PDF
Enlace Electrónico Requerido 5_ Plan de Monitoreo y Evaluación _ POD [37223002].docx
Relatório para publicação_PMR-_HO-L1089-2013-1º-Período [38265529].PDF
Enlace Electrónico Opcional 8_ Informe de Indicadores _ POD [37222469].PDF
HO-L1089 First period Jan-Jun 2014-Public Report [39823340].PDF
XI-IATI-IADB-HO-L1204
Inter-American Development Bank
Program to Support Social Protection Reforms II
Programa de Apoyo a Reformas en Protección Social II
The development objective of this programmatic series is to support the adoption of policy measures conducive to a reduction in extreme poverty among households in Honduras, through the design and implementation of policies to improve the financial sustainability and efficiency of redistributive social protection spending, with an emphasis on human capital formation for children and adolescents, consolidation of the basic social welfare service offerings in health and education as a complement to redistributive programs, and strengthening of governance in information management and coordination capacity in the social sector. The objective of this second operation is to support the implementation of legal instruments approved during the first operation, thereby contributing to the objectives of the series. This operation was designed as a programmatic policy-based loan (PBP) and is the second of a series of two individual operations
El objetivo de desarrollo de esta serie programática es apoyar la adopción de medidas de política que conducen a la reducción de la pobreza extrema de los hogares en Honduras. Lo anterior mediante el diseño e implementación de políticas dirigidas a mejorar la sostenibilidad financiera y eficiencia del gasto en protección social redistributiva con énfasis en la formación de capital humano de los niños, niñas y adolescentes, la consolidación de la oferta de servicios básicos de protección social de salud y educación para la complementariedad de los programas redistributivos y el fortalecimiento de la gobernanza en la gestión de la información y capacidad de coordinación en el sector social. El objetivo de esta segunda operación es apoyar la implementación de instrumentos legales que fueron aprobados durante la primera operación y así contribuir al logro de los objetivos de la serie. Esta operación fue diseñada como un Préstamo Programático de Apoyo a Reformas de Políticas (PBP) y es la segunda de una serie de dos operaciones individuales.
INTER AMERICAN DEVELOPMENT BANK
SECRETARIA DE FINANZAS
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Acta de Comisión de Alto Nivel de Medición de Pobreza. Programa de Apoyo a Reformas en Protección Social II, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
59500000
Disbursement in forth quarter of 2019
256053.73
Interest repayment in second quarter of 2020
195458.31
Interest repayment in forth quarter of 2020
175464.71
Interest repayment in second quarter of 2021
172715.46
Interest repayment in forth quarter of 2021
180536.03
Interest repayment in second quarter of 2022
424403.34
Interest repayment in forth quarter of 2022
651213.6
Interest repayment in second quarter of 2023
740732.56
Interest repayment in forth quarter of 2023
POD EER2. Medios de Verificacion de Matriz de Politicas Proyecto HO-L1204.docx
POD EER 3- Monitoreo y Evaluacion HO-L1204.docx
POD EEO 2 Matriz de acuerdos Comite Pobreza Monetaria.docx
Propuesta de Prestamo HO-L1204.pdf
POD EEO 1 Matriz Comparativa.docx
PCR aprobado HO-L1193 HO-L1204_Progrma de Apoyo a Reformas en Protección Social I y II.pdf
Loan Proposal HO-L1204.pdf
Carta de Politica firmada HO-L1204.pdf
Programa de Apoyo a Reformas en Protección Social II.pdf
XI-IATI-IADB-HO0208
Inter-American Development Bank
Strengthening of Fiscal Management
Fortalecimiento de la Gestión Fiscal
The objective
SECRETARIA DE FINANZAS
INTER AMERICAN DEVELOPMENT BANK
Fund for Special Operations
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
6000
Disbursement in first quarter of 2005
502220.62
Disbursement in second quarter of 2005
750000
Disbursement in second quarter of 2005
9000
Disbursement in second quarter of 2005
149726.91
Disbursement in third quarter of 2005
5071.13
Disbursement in forth quarter of 2005
5071.13
Interest repayment in forth quarter of 2005
245128.73
Disbursement in forth quarter of 2005
141922.84
Disbursement in forth quarter of 2005
154835.61
Disbursement in forth quarter of 2005
9000
Disbursement in forth quarter of 2005
70566.89
Disbursement in first quarter of 2006
200359.87
Disbursement in first quarter of 2006
188456.42
Disbursement in first quarter of 2006
9000
Disbursement in first quarter of 2006
9187.4
Disbursement in second quarter of 2006
9187.4
Interest repayment in second quarter of 2006
9000
Disbursement in second quarter of 2006
174639.22
Disbursement in third quarter of 2006
261018.31
Disbursement in third quarter of 2006
9000
Disbursement in third quarter of 2006
13297.43
Disbursement in forth quarter of 2006
13297.43
Interest repayment in forth quarter of 2006
367211.69
Disbursement in forth quarter of 2006
177252.98
Disbursement in forth quarter of 2006
9000
Disbursement in forth quarter of 2006
110760.23
Disbursement in first quarter of 2007
9000
Disbursement in first quarter of 2007
236225.72
Disbursement in second quarter of 2007
17490.18
Disbursement in second quarter of 2007
17490.18
Interest repayment in second quarter of 2007
281216.37
Disbursement in second quarter of 2007
174988.16
Disbursement in second quarter of 2007
140337.31
Disbursement in second quarter of 2007
124574.91
Disbursement in second quarter of 2007
9000
Disbursement in second quarter of 2007
157945.72
Disbursement in third quarter of 2007
150258.23
Disbursement in third quarter of 2007
108965.13
Disbursement in third quarter of 2007
199526.67
Disbursement in third quarter of 2007
144601.96
Disbursement in third quarter of 2007
9000
Disbursement in third quarter of 2007
24298.86
Disbursement in forth quarter of 2007
24298.86
Interest repayment in forth quarter of 2007
237625.68
Disbursement in forth quarter of 2007
133348.86
Disbursement in forth quarter of 2007
112249
Disbursement in forth quarter of 2007
168391.45
Disbursement in forth quarter of 2007
202052.96
Disbursement in forth quarter of 2007
91084.02
Disbursement in forth quarter of 2007
202680.6
Disbursement in forth quarter of 2007
446043.2
Disbursement in forth quarter of 2007
195000
Disbursement in forth quarter of 2007
9000
Disbursement in forth quarter of 2007
310335.34
Disbursement in first quarter of 2008
187662.3
Disbursement in first quarter of 2008
9000
Disbursement in first quarter of 2008
120948.01
Disbursement in second quarter of 2008
37837.96
Disbursement in second quarter of 2008
37837.96
Interest repayment in second quarter of 2008
205725.64
Disbursement in second quarter of 2008
197792.6
Disbursement in second quarter of 2008
103823.2
Disbursement in second quarter of 2008
9000
Disbursement in second quarter of 2008
303151.14
Disbursement in third quarter of 2008
70482.45
Disbursement in third quarter of 2008
145922.81
Disbursement in third quarter of 2008
509692.18
Disbursement in third quarter of 2008
272672.32
Disbursement in third quarter of 2008
9000
Disbursement in third quarter of 2008
43538.73
Disbursement in forth quarter of 2008
43538.73
Interest repayment in forth quarter of 2008
254910.06
Disbursement in forth quarter of 2008
204185.95
Disbursement in forth quarter of 2008
261145.2
Disbursement in forth quarter of 2008
115435.8
Disbursement in forth quarter of 2008
51340.84
Disbursement in forth quarter of 2008
9000
Disbursement in forth quarter of 2008
619135.54
Disbursement in first quarter of 2009
118003.29
Disbursement in first quarter of 2009
166376.69
Disbursement in first quarter of 2009
9000
Disbursement in first quarter of 2009
109736.96
Disbursement in second quarter of 2009
54234.49
Disbursement in second quarter of 2009
54234.49
Interest repayment in second quarter of 2009
90321.79
Disbursement in second quarter of 2009
257536.75
Disbursement in second quarter of 2009
62090.77
Disbursement in forth quarter of 2009
62090.77
Interest repayment in forth quarter of 2009
830425.6
Disbursement in forth quarter of 2009
42377.37
Disbursement in second quarter of 2010
63692.64
Interest repayment in second quarter of 2010
697859.82
Disbursement in second quarter of 2010
350000
Disbursement in second quarter of 2010
104869.14
Disbursement in second quarter of 2010
198027.3
Disbursement in third quarter of 2010
96196.66
Disbursement in third quarter of 2010
69158.93
Disbursement in forth quarter of 2010
69158.93
Interest repayment in forth quarter of 2010
2686.71
Interest repayment in forth quarter of 2010
186641.57
Disbursement in forth quarter of 2010
77746.98
Disbursement in forth quarter of 2010
261096.55
Disbursement in forth quarter of 2010
4149.85
Disbursement in forth quarter of 2010
58852.87
Interest repayment in second quarter of 2011
16930.5
Interest repayment in second quarter of 2011
6.38
Interest repayment in third quarter of 2011
59967.56
Interest repayment in forth quarter of 2011
16272.99
Interest repayment in forth quarter of 2011
60484.48
Interest repayment in first quarter of 2012
15435.64
Interest repayment in second quarter of 2012
59921.59
Interest repayment in forth quarter of 2012
15188.64
Interest repayment in forth quarter of 2012
59586.65
Interest repayment in second quarter of 2013
15141.76
Interest repayment in second quarter of 2013
59977.41
Interest repayment in forth quarter of 2013
15968.42
Interest repayment in forth quarter of 2013
59590.38
Interest repayment in second quarter of 2014
16271.36
Interest repayment in second quarter of 2014
60084.29
Interest repayment in forth quarter of 2014
14864.43
Interest repayment in forth quarter of 2014
119416.96
Interest repayment in second quarter of 2015
199556.35
Loan repayment in second quarter of 2015
24845.29
Interest repayment in second quarter of 2015
50364.48
Loan repayment in second quarter of 2015
118060.82
Interest repayment in forth quarter of 2015
199071.28
Loan repayment in forth quarter of 2015
26327.09
Interest repayment in forth quarter of 2015
50364.48
Loan repayment in forth quarter of 2015
115873.01
Interest repayment in second quarter of 2016
200049.47
Loan repayment in second quarter of 2016
25685.07
Interest repayment in second quarter of 2016
50364.48
Loan repayment in second quarter of 2016
113736.11
Interest repayment in forth quarter of 2016
199746.34
Loan repayment in forth quarter of 2016
24892.2
Interest repayment in forth quarter of 2016
50364.48
Loan repayment in forth quarter of 2016
111257.55
Interest repayment in second quarter of 2017
399027.77
Loan repayment in second quarter of 2017
23224.78
Interest repayment in second quarter of 2017
50364.48
Loan repayment in second quarter of 2017
135440.38
Interest repayment in third quarter of 2017
245231.38
Loan repayment in third quarter of 2017
2531579.3
Loan repayment in forth quarter of 2017
132132.09
Interest repayment in second quarter of 2018
245627.61
Loan repayment in second quarter of 2018
130489.78
Interest repayment in forth quarter of 2018
245585.07
Loan repayment in forth quarter of 2018
127273.62
Interest repayment in second quarter of 2019
245585.07
Loan repayment in second quarter of 2019
125591.53
Interest repayment in forth quarter of 2019
245585.07
Loan repayment in forth quarter of 2019
122948.79
Interest repayment in second quarter of 2020
245585.07
Loan repayment in second quarter of 2020
120323.26
Interest repayment in forth quarter of 2020
245585.07
Loan repayment in forth quarter of 2020
117407.86
Interest repayment in second quarter of 2021
245585.07
Loan repayment in second quarter of 2021
115741.21
Interest repayment in forth quarter of 2021
245585.07
Loan repayment in forth quarter of 2021
112619.27
Interest repayment in second quarter of 2022
245585.07
Loan repayment in second quarter of 2022
110816.06
Interest repayment in forth quarter of 2022
245585.07
Loan repayment in forth quarter of 2022
107707.55
Interest repayment in second quarter of 2023
245585.07
Loan repayment in second quarter of 2023
105823.61
Interest repayment in forth quarter of 2023
245585.07
Loan repayment in forth quarter of 2023
Relatório para publicação_PMR-_HO0208-2010-2º-Período [36310301].PDF
Informe para Publicación_PMR-_HO0208-2010-2º-Periodo [36312789].PDF
Rapport pour Publication_PMR-_HO0208-2010-2º-Período [36312203].PDF
Consulting Services [35237410].PDF
Adq_ de Computadoras, Impresoras, Proyectores, Scanners y Licencias de Software [35237460].PDF
PCR_ Programa de Apoyo al Fortalecimientode la Gestión Fiscal (HO0208) [36800613].PDF
Asesor Técnico Principal [35235992].PDF
Support for Strengthened Fiscal Management [416312].PDF
CONSULTOR INFORMÁTICO [35238043].PDF
Consulting Services [35236938].PDF
PROGRAMA DE APOYO AL FORTALECIMIENTO DE LA GESTIÓN FISCAL [35238016].PDF
Adquisición de equipos para apoyar la red transp_ de datos para la DEI [35237646].PDF
Consulting Services [35236859].PDF
Report for Publication_PMR-_HO0208-2010-2º-Period [36313364].PDF
Consulting Services [35237292].PDF
SERVICIOS DE CONSULTORIA [35237652].PDF
Consultorías para el Programa de Apoyo al Fortalecimiento de la Gestión Fis [35236015].PDF
XI-IATI-IADB-HO-L1195
Inter-American Development Bank
Program to improve the management and quality of maternal-neonatal health services
Programa de mejora de la gestión y calidad de los servicios de salud materno-neonatal
The project objective is to contribute to the reduction of maternal-neonatal mortality in the poorest municipios of the country and in the prioritized hospitals by improving the quality, management, and responsiveness of health services and supporting the policy for Accelerated Reduction of Maternal and Child Mortality (RAMNI).
El objetivo del proyecto es contribuir a la reducción de la mortalidadmaterna-neonatal en los municipios más pobres del país y en los hospitales priorizados; mediante la mejora de lacalidad, gestión y capacidad de respuesta de los servicios de salud y en apoyo a la política de Reducción Aceleradade la Mortalidad Materna Infantil (RAMNI).
BLENDED LOANS
PROGRAMA DE LA RED SOLIDARIA
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Comités de Apoyo a Hospitales funcionando. Programa de mejora de la gestión y calidad de los servicios de salud materno-neonatal, Honduras
14.824173968, -86.600264243
HEALTH
SALUD
1355160.0
1339980.0
1319280.0
1295130.0
1268220.0
1238550.0
1204740.0
1170240.0
1132290.0
1093650.0
1052940.0
1011540.0
969450.0
927360.0
884580.0
843180.0
800400.0
759690.0
719670.0
680340.0
642390.0
605130.0
569250.0
536130.0
502320.0
471270.0
441600.0
413310.0
386400.0
360870.0
336720.0
313950.0
291870.0
272550.0
2789850.0
5000000
Disbursement in forth quarter of 2019
6363.02
Interest repayment in forth quarter of 2019
14000000
Disbursement in second quarter of 2020
72474.06
Interest repayment in second quarter of 2020
79420
Interest repayment in forth quarter of 2020
7000000
Disbursement in second quarter of 2021
87102.65
Interest repayment in second quarter of 2021
4000000
Disbursement in forth quarter of 2021
106635.61
Interest repayment in forth quarter of 2021
163010.41
Interest repayment in second quarter of 2022
369632.5
Interest repayment in forth quarter of 2022
555045.04
Interest repayment in second quarter of 2023
3000000
Disbursement in second quarter of 2023
6000000
Disbursement in forth quarter of 2023
672778.48
Interest repayment in forth quarter of 2023
Honduras. Project to Improve the Management and Quality of Maternal-neonatal Health Services.pdf
HO-L1195 First period Jan-Jun 2022 - Public Report.PDF
Programa de Mejora de la Gestión y Calidad de los Servicios de Salud Materno - Neonatal.pdf
Honduras. Proyecto de Mejora de la Gestión y Calidad de los Servicios de Salud Materno-neonatal.pdf
Caracterización de la Mortalidad Materna.pdf
HO-L1195_P2076246_SP.pdf
HO-L1195_P756132_SP.pdf
HO-L1195_P760481_SP.pdf
HO-L1195_P2076246_4_SP.pdf
HO-L1195_P502086_SP.pdf
HO-L1195 First period Jan-Jun 2019-Public Report.pdf
HO-L1195_P2053472_1_SP.pdf
HO-L1195 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1195_P2076246_1_SP.pdf
HO-L1195_P2076246_5_SP.pdf
HO-L1195_P844109_SP.pdf
HO-L1195_P2053472_SP.pdf
HO-L1195 Second period Jan-Dec 2019-Public Report.pdf
HO-L1195_2086_2_SP.pdf
HO-L1195 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1195_P2053472_2_SP.pdf
HO-L1195_P740299_SP.pdf
HO-L1195 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1195_P2076246_2_SP.pdf
HO-L1195 First period Jan-Jun 2023 - Public Report.PDF
HO-L1195_P757928_SP.pdf
HO-L1195 1676.pdf
Contrato - Programa de Mejora de la Gestión y Calidad de los Servicios de Salud Materno-Neonatal.pdf
HO-L1195 Second period Jan-Dec 2018-Public Report.pdf
HO-L1195 First period Jan-Jun 2020 - Public Report.pdf
HO-L1195 First period Jan-Jun 2021 - Public Report.pdf
HO-L1195_P2076246_3_SP.pdf
Componente 1. Fortalecimiento de la gestión y calidad de los servicios obstétricos-neonatales
Componente 1. Fortalecimiento de la gestión y calidad de los servicios obstétricos-neonatales
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Convenios de Gestión del II nivel de atención firmados
Convenios de Gestión del II nivel de atención firmados
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Personas cubiertas por gestores descentralizados en primer nivel de atención, priorizando los municipios más pobres
Comités de Apoyo a Hospitales funcionando.
Comités de Apoyo a Hospitales funcionando.
Convenios de Gestión del II nivel de atención firmados
Convenios de Gestión del II nivel de atención firmados
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Equipos de Salud Familiar (ESFAM) conformados en municipios priorizados
Comités de Apoyo a Hospitales funcionando.
Comités de Apoyo a Hospitales funcionando.
Comités de Apoyo a Hospitales funcionando.
Comités de Apoyo a Hospitales funcionando.
Componente 2. Mejoramiento del Equipamiento e Infraestructura de los Servicios de Salud
Componente 2. Mejoramiento del Equipamiento e Infraestructura de los Servicios de Salud
Diseño, estudio de preinversion y supervision de las Obras elaborados
Diseño, estudio de preinversion y supervision de las Obras elaborados
Componente 3. Fortalecimiento Institucional, Innovaciones Tecnologicas y Sistema de Información
Componente 3. Fortalecimiento Institucional, Innovaciones Tecnologicas y Sistema de Información
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamentos y unidades del nivel central de la SESAL fortalecidos en el modelo de gestion descentralizado
Departamento de Hospitales fortalecido en gestion de procesos y de gestores descentralizados hospitalarios.
Departamento de Hospitales fortalecido en gestion de procesos y de gestores descentralizados hospitalarios.
Regiones sanitarias fortalecidas
Regiones sanitarias fortalecidas
XI-IATI-IADB-HO-L1010
Inter-American Development Bank
Rural Business Development Program (PRONEGOCIOS)
Programa de Fomento de Negocios Rurales (PRONEGOCIOS)
Generate employment and to increase in a sustainable manner the income of the rural poor in the geographic area covered by the project. The specific objectives are to contribute towards: i) the diversification of crops; ii) the technological change; iii) the increase in value added; iv) the development of employment opportunities in agricultural and non-agricultural activities, taking advantage of small and medium enterprises.
Generar empleos e incrementar de manera sostenible los ingresos de los pobres rurales en el área de cobertura geográfica del proyecto. Los objetivos específicos son contribuir con: i) la diversificación de cultivos; ii) el cambio tecnológico; iii) el aumento en valor agregado; iv) el desarrollo de actividades y oportunidades de empleo agrícola y no-agrícola, aprovechando las actividades de pequeñas y medianas empresas.
REPUBLICA DE HONDURAS
BLENDED LOANS
DIRECCIÓN NACIONAL DE DESARROLLO RURAL SOSTENIBLE
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Producto 1.1: Estrategia de Comunicación del Programa Diseñada Programa de Fomento de Negocios Rurales (PRONEGOCIOS), Honduras
14.824173968, -86.600264243
AGRICULTURE AND RURAL DEVELOPMENT
AGRICULTURA Y DESARROLLO RURAL
150000
Disbursement in third quarter of 2010
350000
Disbursement in third quarter of 2010
221.92
Interest repayment in second quarter of 2011
7195.82
Interest repayment in second quarter of 2011
96418.75
Disbursement in second quarter of 2011
224977.09
Disbursement in second quarter of 2011
296.98
Interest repayment in forth quarter of 2011
9260.32
Interest repayment in forth quarter of 2011
611708.4
Disbursement in forth quarter of 2011
1427319.6
Disbursement in forth quarter of 2011
1044.49
Interest repayment in second quarter of 2012
28429.18
Interest repayment in second quarter of 2012
588135.6
Disbursement in second quarter of 2012
1372316.4
Disbursement in second quarter of 2012
966063
Disbursement in third quarter of 2012
2254147
Disbursement in third quarter of 2012
1763.64
Interest repayment in forth quarter of 2012
45415.01
Interest repayment in forth quarter of 2012
1186400.7
Disbursement in first quarter of 2013
2768268.3
Disbursement in first quarter of 2013
3208.46
Interest repayment in second quarter of 2013
83338.8
Interest repayment in second quarter of 2013
4843.9
Interest repayment in forth quarter of 2013
120335.38
Interest repayment in forth quarter of 2013
1483551
Disbursement in forth quarter of 2013
3461619
Disbursement in forth quarter of 2013
6111.89
Interest repayment in second quarter of 2014
144672.69
Interest repayment in second quarter of 2014
1260845.4
Disbursement in second quarter of 2014
2941972.6
Disbursement in second quarter of 2014
7639.73
Interest repayment in forth quarter of 2014
176248.55
Interest repayment in forth quarter of 2014
1200000
Disbursement in forth quarter of 2014
2800000
Disbursement in forth quarter of 2014
9057.86
Interest repayment in second quarter of 2015
201288.46
Interest repayment in second quarter of 2015
374481.28
Loan repayment in second quarter of 2015
420437.7
Disbursement in third quarter of 2015
981021.3
Disbursement in third quarter of 2015
9690.88
Interest repayment in forth quarter of 2015
203951.49
Interest repayment in forth quarter of 2015
395807.83
Loan repayment in forth quarter of 2015
9965.19
Interest repayment in second quarter of 2016
242211.33
Interest repayment in second quarter of 2016
395807.83
Loan repayment in second quarter of 2016
9954.45
Interest repayment in forth quarter of 2016
227287.13
Interest repayment in forth quarter of 2016
395807.83
Loan repayment in forth quarter of 2016
229929.32
Interest repayment in second quarter of 2017
395807.83
Loan repayment in second quarter of 2017
231886.12
Interest repayment in forth quarter of 2017
395807.83
Loan repayment in forth quarter of 2017
237971.48
Interest repayment in second quarter of 2018
395807.83
Loan repayment in second quarter of 2018
259142.53
Interest repayment in forth quarter of 2018
395807.83
Loan repayment in forth quarter of 2018
288355.32
Interest repayment in second quarter of 2019
395807.83
Loan repayment in second quarter of 2019
307530.96
Interest repayment in forth quarter of 2019
395807.83
Loan repayment in forth quarter of 2019
292053.34
Interest repayment in second quarter of 2020
395807.83
Loan repayment in second quarter of 2020
248665.5
Interest repayment in forth quarter of 2020
395807.83
Loan repayment in forth quarter of 2020
214492.56
Interest repayment in second quarter of 2021
395807.83
Loan repayment in second quarter of 2021
203625.44
Interest repayment in forth quarter of 2021
395807.83
Loan repayment in forth quarter of 2021
204721.24
Interest repayment in second quarter of 2022
395807.83
Loan repayment in second quarter of 2022
206101.13
Interest repayment in forth quarter of 2022
395807.83
Loan repayment in forth quarter of 2022
233981.52
Interest repayment in second quarter of 2023
395807.83
Loan repayment in second quarter of 2023
275043.92
Interest repayment in forth quarter of 2023
395807.83
Loan repayment in forth quarter of 2023
Report for Publication_PMR-_HO-L1010-2012-2º-Period [37875440].PDF
Informe para Publicación_PMR-_HO-L1010-2012-1º-Periodo [37353499].PDF
Rapport pour Publication_PMR-_HO-L1010-2012-2º-Período [37873955].PDF
HO-L1010 Second period Jan-Dec 2013-Public Report [40174716].PDF
Relatório para publicação_PMR-_HO-L1010-2011-2º-Período [36918686].PDF
Relatório para publicação_PMR-_HO-L1010-2013-1º-Período [38265510].PDF
HO-L1010 Second period Jan-Dec 2015-Public Report [40377437].PDF
Relatório para publicação_PMR-_HO-L1010-2010-2º-Período [36310279].PDF
Relatório para publicação_PMR-_HO-L1010-2012-1º-Período [37352179].PDF
Relatório para publicação_PMR-_HO-L1010-2011-1º-Período [36624042].PDF
Informe para Publicación_PMR-_HO-L1010-2013-1º-Periodo [38266839].PDF
Report for Publication_PMR-_HO-L1010-2013-1º-Period [38267513].PDF
HO-L1010 First period Jan-Jun 2015-Public Report [40193957].PDF
Rapport pour Publication_PMR-_HO-L1010-2013-1º-Período [38266174].PDF
Informe para Publicación_PMR-_HO-L1010-2012-2º-Periodo [37874615].PDF
Rapport pour Publication_PMR-_HO-L1010-2010-2º-Período [36312179].PDF
Contrato - Programa de Fomento de Negocios Rurales.pdf
Rapport pour Publication_PMR-_HO-L1010-2011-1º-Período [36624623].PDF
Rapport pour Publication_PMR-_HO-L1010-2012-1º-Período [37352842].PDF
Informe para Publicación_PMR-_HO-L1010-2011-1º-Periodo [36625178].PDF
Relatório para publicação_PMR-_HO-L1010-2012-2º-Período [37873287].PDF
Informe para Publicación_PMR-_HO-L1010-2010-2º-Periodo [36312767].PDF
HO-L1010 Second period Jan-Dec 2014-Public Report [40185552].PDF
Report for Publication_PMR-_HO-L1010-2011-1º-Period [36625740].PDF
Report for Publication_PMR-_HO-L1010-2010-2º-Period [36313341].PDF
Informe para Publicación_PMR-_HO-L1010-2011-2º-Periodo [36925279].PDF
Report for Publication_PMR-_HO-L1010-2012-1º-Period [37354161].PDF
Rapport pour Publication_PMR-_HO-L1010-2011-2º-Período [36922694].PDF
Report for Publication_PMR-_HO-L1010-2011-2º-Period [36928019].PDF
HO-L1010 First period Jan-Jun 2014-Public Report [40182064].PDF
BR-L1183 First period Jan-Jun 2016-Public Report [40800222].PDF
Apoyo a Servicios Empresariales Rurales
Apoyo a Servicios Empresariales Rurales
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.4: Proveedores de Servicios Empresariales (PSER) Aprobados
Producto 1.4: Proveedores de Servicios Empresariales (PSER) Aprobados
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.4: Proveedores de Servicios Empresariales (PSER) Aprobados
Producto 1.4: Proveedores de Servicios Empresariales (PSER) Aprobados
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.5: Planes de Negocios Rurales (PNS) Formulados
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.2: Estrategia de Comunicación del Programa Implementada
Producto 1.1: Estrategia de Comunicación del Programa Diseñada
Producto 1.1: Estrategia de Comunicación del Programa Diseñada
Financiamiento de Planes de Negocios
Financiamiento de Planes de Negocios
Producto 2.1: Planes de Negocio Sostenible de Empresas Financiados por Ventanilla A Ejecutados
Producto 2.1: Planes de Negocio Sostenible de Empresas Financiados por Ventanilla A Ejecutados
Producto 2.1: Planes de Negocio Sostenible de Empresas Financiados por Ventanilla A Ejecutados
Producto 2.1: Planes de Negocio Sostenible de Empresas Financiados por Ventanilla A Ejecutados
Producto 2.2: Planes de Negocios Sostenibles de Empresas Financiadas por Ventanilla B Ejecutados
Producto 2.2: Planes de Negocios Sostenibles de Empresas Financiadas por Ventanilla B Ejecutados
Producto 2.2: Planes de Negocios Sostenibles de Empresas Financiadas por Ventanilla B Ejecutados
Producto 2.2: Planes de Negocios Sostenibles de Empresas Financiadas por Ventanilla B Ejecutados
XI-IATI-IADB-HO-L1087
Inter-American Development Bank
Social Safety Net Support Program II
Programa de Apoyo a la Red de Protección Social II
The general objective of the program is to help beneficiary families build up their human capital and boost their consumption levels. The specific objectives are: (i) to increase the use of education, health, and nutrition services by pregnant women and young people under 18 years of age; (ii) to boost consumption through targeted conditional cash transfers; (iii) to increase the availability of middle-school education (grades 7 to 9) in targeted rural areas; and (iv) to make program management more efficient.
El objetivo general del programa es fomentar la acumulación de capital humano en las familias en situación de pobreza. Los objetivos específicos son: i) promover la formación de capital humano a través del aumento del uso de servicios de educación, salud y nutrición; ii) implementar y evaluar un piloto para reformular el Bono 10,000 en áreas urbanas, incluyendo intervenciones de formación en competencias básicas e inserción en el mercado laboral con esquemas innovadores para la capacitación e intermediación laboral de jóvenes beneficiarios del programa; y iii) fortalecer y consolidar los procesos operativos del Bono 10,000 para aumentar la eficiencia en la gestión del programa.
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
BLENDED LOANS
PROGRAMA DE ASIGNACION FAMILIAR
PROGRAMA DE ASIGNACION FAMILIAR
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Consultorías para mejorar procesos de focalización y administración del Padrón de beneficiarios Programa de Apoyo a la Red de Protección Social II, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
7500000
Disbursement in forth quarter of 2013
17500000
Disbursement in forth quarter of 2013
6678.08
Interest repayment in second quarter of 2014
72147.95
Interest repayment in second quarter of 2014
5100000
Disbursement in second quarter of 2014
11900000
Disbursement in second quarter of 2014
29400000
Loan repayment in third quarter of 2014
14570.54
Interest repayment in forth quarter of 2014
416640.58
Interest repayment in forth quarter of 2014
10357950
Disbursement in forth quarter of 2014
24168550
Disbursement in forth quarter of 2014
24168550
Loan repayment in first quarter of 2015
26987.08
Interest repayment in second quarter of 2015
902654.37
Interest repayment in second quarter of 2015
5520000
Disbursement in second quarter of 2015
12880000
Disbursement in second quarter of 2015
33388.66
Interest repayment in forth quarter of 2015
1101535.63
Interest repayment in forth quarter of 2015
1522050
Disbursement in forth quarter of 2015
3551450
Disbursement in forth quarter of 2015
37006.5
Interest repayment in second quarter of 2016
1327066.15
Interest repayment in second quarter of 2016
37500
Interest repayment in forth quarter of 2016
1283445.61
Interest repayment in forth quarter of 2016
4582565.94
Loan repayment in first quarter of 2017
1303164.51
Interest repayment in second quarter of 2017
1305970.7
Interest repayment in forth quarter of 2017
1344565.56
Interest repayment in second quarter of 2018
1382431.8
Interest repayment in forth quarter of 2018
1374877.52
Interest repayment in second quarter of 2019
1382431.8
Interest repayment in forth quarter of 2019
1458333.33
Loan repayment in forth quarter of 2019
1352089.04
Interest repayment in second quarter of 2020
1458333.33
Loan repayment in second quarter of 2020
1322620.52
Interest repayment in forth quarter of 2020
1458333.33
Loan repayment in forth quarter of 2020
1310158.04
Interest repayment in second quarter of 2021
1458333.33
Loan repayment in second quarter of 2021
1302219.72
Interest repayment in forth quarter of 2021
1458333.33
Loan repayment in forth quarter of 2021
1266824.93
Interest repayment in second quarter of 2022
1458333.33
Loan repayment in second quarter of 2022
1245037.09
Interest repayment in forth quarter of 2022
1458333.33
Loan repayment in forth quarter of 2022
1200304.91
Interest repayment in second quarter of 2023
1458333.33
Loan repayment in second quarter of 2023
1172916.92
Interest repayment in forth quarter of 2023
1458333.33
Loan repayment in forth quarter of 2023
Programa de Apoyo a la Red de Protección Social II [37775188].PDF
HO-L1087 Second period Jan-Dec 2014-Public Report [40185539].PDF
Contrato - Programa de Apoyo a la Red de Protección Social II [40058252].PDF
HO-L1087 Second period Jan-Dec 2013-Public Report [40174683].PDF
HO-L1087 [40263419].PDF
HO-L1087 First period Jan-Jun 2014-Public Report [40182072].PDF
Rapport pour Publication_PMR-_HO-L1087-2013-1º-Período [38266191].PDF
Report for Publication_PMR-_HO-L1087-2013-1º-Period [38267530].PDF
Enlace - Avances del Modelo de Gestión [37730082].docx
Informe para Publicación_PMR-_HO-L1087-2013-1º-Periodo [38266856].PDF
HO-L1087 First period Jan-Jun 2016-Public Report [40799121].PDF
Salvaguardias ambientales [37702620].docx
HO-L1087 [38990097].PDF
Relatório para publicação_PMR-_HO-L1087-2013-1º-Período [38265527].PDF
Social Safety Net Support Program II [37775206].PDF
Apoyo a la Consolidación del Programa Bono 10,000
Apoyo a la Consolidación del Programa Bono 10,000
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Consultorías para mejorar procesos de focalización y administración del Padrón de beneficiarios
Consultorías para mejorar procesos de focalización y administración del Padrón de beneficiarios
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Número de centros de salud que reportan verificación de corresponsabilidades siguiendo el nuevo reglamento Operativo
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Número de hogares encuestados en el proceso de recertificación y densificación
Número de hogares encuestados en el proceso de recertificación y densificación
Consultorías para mejorar procesos de focalización y administración del Padrón de beneficiarios
Consultorías para mejorar procesos de focalización y administración del Padrón de beneficiarios
Número de hogares encuestados en el proceso de recertificación y densificación
Número de hogares encuestados en el proceso de recertificación y densificación
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Número de centros educativos que reportan verificación de corresponsabilidades de acuerdo al nuevo Reglamento Operativo
Talleres de capacitación en temas de género
Talleres de capacitación en temas de género
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Promotores de salud contratados y capacitados para la atención a las familias beneficiarias
Informe de revisión técnica de cumplimiento de corresponsabilidades
Informe de revisión técnica de cumplimiento de corresponsabilidades
Informe de revisión técnica de cumplimiento de corresponsabilidades
Informe de revisión técnica de cumplimiento de corresponsabilidades
Talleres de capacitación en temas de género
Talleres de capacitación en temas de género
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Unidades departamentales de educación con procesos de verificación de corresponsabilidad descentralizados
Talleres de capacitación en temas de género
Talleres de capacitación en temas de género
Fortalecimiento del Tercer Ciclo de Educación Básica en zonas rurales focalizadas
Fortalecimiento del Tercer Ciclo de Educación Básica en zonas rurales focalizadas
Número de alumnos inscritos en el SAT en las aldeas focalizadas (u otra modalidad flexible)
Número de alumnos inscritos en el SAT en las aldeas focalizadas (u otra modalidad flexible)
Número de alumnos inscritos en el SAT en las aldeas focalizadas (u otra modalidad flexible)
Número de alumnos inscritos en el SAT en las aldeas focalizadas (u otra modalidad flexible)
Transferencias Monetarias Condicionadas
Transferencias Monetarias Condicionadas
Número de personas que reciben transferencias
Número de personas que reciben transferencias
Número de personas que reciben transferencias
Número de personas que reciben transferencias
XI-IATI-IADB-HO-L1121
Inter-American Development Bank
Roads Integration Program II
Programa de Integracion Vial Regional II
The objective of the program is to contribute to increase productivity and national and regional integration in Honduras, by improving the quality of its road infrastructure. The specific objective of the project is to improve the level of service of two of the roads of the CEINRH, specifically the Logistic and Touristic Corridors, by increasing lanes and rehabilitating sections of the road which will result in a decrease of vehicle operating costs and travel times for users. The focus on these two corridors is due to the current scheme of PPP in Honduras, the concession of the Logistics and Touristic Corridors, and that the GOH has committed to deliver some improved and rehabilitated road sections to the concessionaire for its operation and maintenance.
El objetivo del programa es contribuir al aumento de la productividad e integración nacional y regional de Honduras, mediante la mejora de la calidad de su infraestructura vial. El objetivo específico del proyecto es contribuir a mejorar el nivel de servicio de dos de los corredores de CEINRH, específicamente los Corredores Logístico y el Turístico, a través de un aumento de carriles y rehabilitación en tramos a ser intervenidos que resultará en la disminución de los costos de operación vehicular y de los tiempos de viaje de los usuarios. La focalización en estos dos corredores se debe a que bajo el actual esquema de APP en Honduras, los Corredores Logístico y Turístico han sido concesionados, y que el GdH se ha comprometido a entregar algunos tramos mejorados y rehabilitados para su operación y mantenimiento por parte del concesionario.
INVERSION ESTRATEGICA DE HONDURAS INVESTH
REPUBLICA DE HONDURAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Km de carreteras construidas o mejoradas: Tramo La Barca - Pimienta Programa de Integracion Vial Regional II, Honduras
14.824173968, -86.600264243
TRANSPORT
TRANSPORTE
7403617
Disbursement in forth quarter of 2017
19142.71
Interest repayment in first quarter of 2018
2800000
Disbursement in first quarter of 2018
96802.64
Interest repayment in third quarter of 2018
8060363
Disbursement in forth quarter of 2018
161140.94
Interest repayment in first quarter of 2019
11027476
Disbursement in second quarter of 2019
288774.36
Interest repayment in third quarter of 2019
12000000
Disbursement in forth quarter of 2019
391420.59
Interest repayment in first quarter of 2020
5107039
Disbursement in first quarter of 2020
17663476
Disbursement in third quarter of 2020
424756.08
Interest repayment in third quarter of 2020
4587761
Disbursement in forth quarter of 2020
523569.28
Interest repayment in first quarter of 2021
2336524
Disbursement in second quarter of 2021
4013744
Disbursement in second quarter of 2021
613419.25
Interest repayment in third quarter of 2021
666618.43
Interest repayment in first quarter of 2022
675673.35
Interest repayment in third quarter of 2022
682069.09
Interest repayment in first quarter of 2023
929816.45
Loan repayment in first quarter of 2023
643277.8
Interest repayment in third quarter of 2023
929816.45
Loan repayment in third quarter of 2023
643131.37
Interest repayment in first quarter of 2024
929816.45
Loan repayment in first quarter of 2024
HO-L1121_6880_4_SP.pdf
HO-L1121 First period Jan-Jun 2018-Public Report.pdf
HO-L1121_6880_1_SP.pdf
HO-L1121 Second period Jan-Dec 2021 - Public Report.PDF
Contrato - Programa de Integración Vial Regional II.pdf
HO-L1121 First period Jan-Jun 2020 - Public Report.pdf
EEO7_ Filtro de Política de Salvaguardias (SPF) y Formulario de Evaluación de Salvaguardia para la Clasificación [40400760].PDF
Propuesta de reformulación de los préstamos 3815-BL-HO Programa de Integración Vial Regional II -4518-BL-HO Programa de Convivencia Ciudadana y Mej.pd
HO-L1121 Second period Jan-Dec 2019-Public Report.pdf
PCR Programa de integracion vial regional II (HO-L1121) vff.pdf
EER4_ Informe de Gestión Ambiental y Social (IGAS) [40400794].DOCX
PCR Programa de integración vial regional II (HO-L1121) vff.pdf
HO-L1121 Second period Jan-Dec 2016-Public Report.pdf
EEO5_ Anexo Cambio Climático [40433846].docx
HO-L1121 First period Jan-Jun 2019-Public Report.pdf
HO-L1121_P487869_SP.pdf
HO-L1121 First period Jan-Jun 2017-Public Report.pdf
HO-L1121_6880_3_SP.pdf
Proposed reformulation of loans 3815-BL-HO Regional Road Integration Program II - 4518-BL-HO Civic Coexistence and Neighborhood Improvement Program an
EEO6_ Análisis de Posibles Costos Adicionales [40436022].docx
HO-L1121 First period Jan-Jun 2021 - Public Report.pdf
EEO2_ Anexo de Integración Regional [40412779].docx
Honduras_ Propuesta de préstamo para el Programa de Integración Vial Regional II [40739384].PDF
EEO4_ Resumen Ejecutivo de Estudio y Diseños del Tramo La Barca - Pimienta [40439422].PDF
HO-L1121 Second period Jan-Dec 2020 - Public Report.pdf
EEO1_ Analisis Económico del Proyecto [40432919].docx
HO-L1121 Second period Jan-Dec 2017-Public Report.pdf
EER3_ Plan de Monitoreo y Evaluación [40400791].DOCX
HO-L1121 Second period Jan-Dec 2018-Public Report.pdf
EIA_ Evaluación de Impacto Ambiental y Social [40726423].PDF
Honduras_ Proposal for a loan for the Regional Road Integration Program II [40739441].PDF
HO-L1121_3635_2_SP.pdf
HO-L1121_6880_2_SP.pdf
EER 2_ Plan Operativo Anual (POA) [40432107].PDF
HO-L1121 [40681647].PDF
HO-L1121_P613635_SP.pdf
EEO3_ Anexo de Género [40422862].docx
HO-L1121_P756880_SP.pdf
HO-L1121 First period Jan-Jun 2022 - Public Report.PDF
HO-L1121_P602055_GN.pdf
Componente 1: Mejoramiento de tramos viales de integración
Componente 1: Mejoramiento de tramos viales de integración
Km de carreteras construidas o mejoradas: Tramo La Barca - Pimienta
Km de carreteras construidas o mejoradas: Tramo La Barca - Pimienta
Km de carreteras construidas o mejoradas: Tramo La Barca - Pimienta
Km de carreteras construidas o mejoradas: Tramo La Barca - Pimienta
Número de capacitaciones realizadas por el Gobierno de Honduras en empleos no tradicionales a mujeres
Número de capacitaciones realizadas por el Gobierno de Honduras en empleos no tradicionales a mujeres
Componente 2: Fortalecimiento Institucional INSEP
Componente 2: Fortalecimiento Institucional INSEP
Unidades operativas de INSEP fortalecidas
Unidades operativas de INSEP fortalecidas
Unidades operativas de INSEP fortalecidas
Unidades operativas de INSEP fortalecidas
Número de capacitaciones realizadas a los funcionarios de la Secretaría de Infraestructura y Servicios Públicos (INSEP)
Número de capacitaciones realizadas a los funcionarios de la Secretaría de Infraestructura y Servicios Públicos (INSEP)
Componente 3: Mejoramiento a la capacidad de provision de servicios de salud
Componente 3: Mejoramiento a la capacidad de provision de servicios de salud
Numero de establecimientos de salud que cuentan con EPP para los trabajadores de salud
Numero de establecimientos de salud que cuentan con EPP para los trabajadores de salud
Numero de hospitales para tratar a pacientes con COVID-19 con convenios de gestion descentralizada
Numero de hospitales para tratar a pacientes con COVID-19 con convenios de gestion descentralizada
XI-IATI-IADB-HO-L1219
Inter-American Development Bank
Honduras Transportation and Freight Logistics Sector Reform Program III
Programa de Reformas del Sector Transporte y Logística de Carga de Honduras III
The program aims to support improvements in Honduras's logistics performance through regulatory, institutional, planning, and trade facilitation reforms in the sector, with a view to boosting competitiveness and regional integration. This is the last in a series of three operations under a programmatic policy-based loan (PBP).
El objetivo del programa es contribuir a la mejora del desempeño logístico de Honduras a través de reformas sectoriales en los ámbitos regulatorio, institucional, de planificación y de facilitación comercial, que permita ganancias en la competitividad e integración regional. La presente operación es la última de una serie de tres operaciones bajo la modalidad de Préstamo Programático de Apoyo a Reformas de Política (PBP).
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Aprobación del Informe de Gestión Institucional del CNL, incluyendo el avance de las acciones del PAI Programa de Reformas del Sector Transporte y Logística de Carga de Honduras III, Honduras
18.37883, -70.42925
TRANSPORT
TRANSPORTE
118480000
Disbursement in first quarter of 2022
207265.34
Interest repayment in second quarter of 2022
1441480.75
Interest repayment in forth quarter of 2022
2282324.38
Interest repayment in second quarter of 2023
2611283.64
Interest repayment in forth quarter of 2023
EEO4 Nota Te´cnica Tecnologi´a e Innovacio´n Logi´stica -T3 PBL.docx
EER_2 Matriz de Medios de Verificacion HO-L1219.docx
EEO_7 PAI Honduras 2020 HO-L1219.pdf
EEO_6 PNLOG HO-L1219.pdf
Loan proposal - Honduras Transportation and Freight Logistics Sector Reform Program III.pdf
EEO_9 Anexo de genero HO-L1219.pdf
Programa de Reformas del Sector Transporte y Logística de Carga de Honduras III.pdf
Propuesta de prestamo - Programa de Reformas del Sector Transporte y Logistica de Carga de Honduras III.pdf
EER_1 Carta de Politica HO-L1219.pdf
EEO_1 Matriz Comparativa HO-L1219.docx
HO-L1219 Second period Jan-Dec 2021 - Public Report.PDF
EEO_8 Anexo Tecnico Inclusion y Diversidad HO-L1219.docx
EEO_5 PMCLN HN HO-L1219.doc
EEO_3 Anexo de Integracion PBL logistica HO-L1219.docx
Honduras Transportation and Freight Logistics Sector Reform Program III.pdf
EER_3 Plan de Monitoreo HO-L1219.pdf
Contrato - Programa de Reformas del Sector Transporte y Logística de Carga de Honduras III.pdf
EEO_2 Anexo Organizacion Institucional del Sector HO-L1219.pdf
XI-IATI-IADB-HO-L1188
Inter-American Development Bank
Improvement of school quality to develop capacities for the Employment: Youth Program
Mejora de la calidad educativa para desarrollar capacidades para el empleo: Proyecto Joven.
The objective is to contribute to the development of life and work skills for young Hondurans by improving middle school learning access and quality in municipios prioritized by the program.
contribuir al desarrollo de las habilidades para el trabajo y la vida de los jóvenes hondureños por medio de la mejora del acceso y calidad de los aprendizajes en el tercer ciclo de Educación Básica (EB) en los municipios priorizados por el programa.
PROGRAMA DE LA RED SOLIDARIA
BLENDED LOANS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Areas de la SEDUC con equipamiento informático de conectividad instalado. Mejora de la calidad educativa para desarrollar capacidades para el empleo: Proyecto Joven., Honduras
13.5425, -87.44444
EDUCATION
EDUCACION
409800.0
384000.0
359400.0
336000.0
313800.0
292800.0
273000.0
253800.0
237000.0
2940400.0
300000
Disbursement in forth quarter of 2018
3700000
Disbursement in second quarter of 2019
12479.27
Interest repayment in second quarter of 2019
3000000
Disbursement in forth quarter of 2019
39757.81
Interest repayment in forth quarter of 2019
59927.31
Interest repayment in second quarter of 2020
6500000
Disbursement in third quarter of 2020
8600000
Disbursement in forth quarter of 2020
8600000
Disbursement in forth quarter of 2020
44490.6
Interest repayment in forth quarter of 2020
6400000
Disbursement in first quarter of 2021
109291.48
Interest repayment in second quarter of 2021
13700000
Disbursement in forth quarter of 2021
116889.04
Interest repayment in forth quarter of 2021
234049.96
Interest repayment in second quarter of 2022
519949.71
Interest repayment in forth quarter of 2022
780763.37
Interest repayment in second quarter of 2023
7000000
Disbursement in second quarter of 2023
999706.41
Interest repayment in forth quarter of 2023
756923.08
Loan repayment in forth quarter of 2023
5000000
Disbursement in forth quarter of 2023
HO-L1188_0918_1_SP.pdf
HO-L1188_P824267_SP.pdf
EEO_AI SECI HO-L1188.docx
HO-L1188_P1065366_SP.pdf
HO-L1188_P856223_SP.pdf
Mejora de la Calidad Educativa para el Desarrollo de Habilidades para el Empleo Proyecto Joven.pdf
HO-L1188_P804096_SP.pdf
HO-L1188 1535.pdf
HO-L118_P709836_SP.pdf
HO-L1188_P830993_SP.pdf
HO-L1188_P680731_SP.pdf
HO-L1188 7961.pdf
HO-L1188 4449 1.pdf
HO-L1188 First period Jan-Jun 2018-Public Report.pdf
HO-L1188_P824270_SP.pdf
HO-L1188 Second period Jan-Dec 2021 - Public Report.PDF
EEO_Marco de Refencia Formación Docente.docx
HO-L1188_P1089150_SP.pdf
EEO_Plan de MyE.doc
HO-L1188_P1044999_SP.pdf
HO-L1188 First period Jan-Jun 2022 - Public Report.PDF
HO-L1188_P726252_SP.pdf
HO-L1188_P688707_SP.pdf
HO-L1188 Second period Jan-Dec 2019-Public Report.pdf
HO-L1188_P680734_SP.pdf
HO-L1188_P719366_SP.pdf
HO-L1188_P718538_SP.pdf
HO-L1188_P900918_SP.pdf
HO-L1188_P2047997_1_SP.pdf
EEO_Tasa de Matricula.docx
HO-L1188 038.pdf
EEO_AnalisisEconomico.docx
HO-L1188 First period Jan-Jun 2023 - Public Report.PDF
HO-L1188_P984653_SP.pdf
HO-L1188 Manual Operativo.docx
HO-L1188_P950354_SP.pdf
HO-L1188_P701771_SP.pdf
EEO Diagnostico Sectorial.pdf
HO-L1188 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1188 First period Jan-Jun 2019-Public Report.pdf
HO-L1188_P572230_GN.pdf
HO-L1188_P910300_SP.pdf
HO-L1188 4449.pdf
HO-L1188 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1188_P798831_SP.pdf
HO-L1188_P949385_SP.pdf
Honduras. Propuesta de prestamo_Mejora de la Calidad Educativa para el Desarrollo de Habilidades para el Empleo Proyecto Joven.pdf
HO-L1188_P817760_SP.pdf
HO-L1188 1534.pdf
HO-L1188_P682981_SP.pdf
HO-L1188_P1065375_SP.pdf
HO-L1188_P929753_SP.pdf
EEO_Cuadro Modalidades Alternativas.docx
HO-L1188_P746678_SP.pdf
HO-L1188_P747083_SP.pdf
HO-L1188_P962731_SP.pdf
HO-L1188 First period Jan-Jun 2020 - Public Report.pdf
HO-L1188_P2047997_2_SP.pdf
HO-L1188 Second period Jan-Dec 2018-Public Report.pdf
HO-L1188_P2047997_SP.pdf
HO-L1188_P804093_SP.pdf
EER2_PEP_5años.pdf
HO-L1188_P956681_SP.pdf
HO-L1188 Second period Jan-Dec 2017-Public Report.pdf
HO-L1188_P654264_SP.pdf
HO-L1188_P697021_SP.pdf
HO-L1188 First period Jan-Jun 2021 - Public Report.pdf
HO-L1188_P640449_SP.pdf
Honduras. Proposal for a loan for the project - Improving Educational Quality to Develop Skills for Employment. Project Youth.pdf
HO-L1188_P747080_SP.pdf
Plan de Adquisiciones (EJECUCIÓN 5 AÑOS)_HO-L1188.xlsx
Componente 1. Cobertura de servicios del tercer ciclo de EB con énfasis en zonas rurales del occidente del país.
Componente 1. Cobertura de servicios del tercer ciclo de EB con énfasis en zonas rurales del occidente del país.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Escuelas con módulos de tres aulas del tercer ciclo construidos y equipados
Escuelas con módulos de tres aulas del tercer ciclo construidos y equipados
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Escuelas con módulos de tres aulas del tercer ciclo construidos y equipados
Escuelas con módulos de tres aulas del tercer ciclo construidos y equipados
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Convenios/contratos de prestación de servicios educativos en MA para el tercer ciclo firmados de acuerdo con los requerimientos de la SEDUC.
Componente 2: Mejora de la calidad y pertinencia de los servicios educativos.
Componente 2: Mejora de la calidad y pertinencia de los servicios educativos.
Docentes capacitados en pedagogías de aprendizaje active (CRF).
Docentes capacitados en pedagogías de aprendizaje active (CRF).
Evaluación de competencias finalizadas.
Evaluación de competencias finalizadas.
Currículo de formación inicial de docentes actualizado con más horas de práctica y revision de módulos de pedagogía
Currículo de formación inicial de docentes actualizado con más horas de práctica y revision de módulos de pedagogía
Escuelas beneficiadas, con materiales pedagógicos para el desarrollo de habilidades de acuerdo con lineamientos de SEDUC.
Escuelas beneficiadas, con materiales pedagógicos para el desarrollo de habilidades de acuerdo con lineamientos de SEDUC.
Piloto de aprendizaje de matemáticas asistido por computadora implementado.
Piloto de aprendizaje de matemáticas asistido por computadora implementado.
Componente 3: Modernización de la capacidad de gestión administrativa y pedagógica de la SEDUC.
Componente 3: Modernización de la capacidad de gestión administrativa y pedagógica de la SEDUC.
Areas de la SEDUC con equipamiento informático de conectividad instalado.
Areas de la SEDUC con equipamiento informático de conectividad instalado.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Equipos técnicos de la SEDUC conformados.
Componente 4: Mejoramiento de la capacidad de provisión de servicios
Componente 4: Mejoramiento de la capacidad de provisión de servicios
Número de unidades de salud de primer y segundo nivel equipados para la atención de pacientes con COVID-19.
Número de unidades de salud de primer y segundo nivel equipados para la atención de pacientes con COVID-19.
XI-IATI-IADB-HO-L1061
Inter-American Development Bank
Public Transportation Program for the Central District (Tegucigalpa-Comayaguela)
Proyecto de Transporte Público para el Distrito Central (Tegucigalpa-Comayagüela
The objetive is to support the improvement of the public passenger transport and the general transit, in order to structure a competitive city, efficient and equitable, allowing citizens to have safe opportunities for mobility.
El objetivo es apoyar en la mejora de las condiciones del transporte público de pasajeros y el tránsito en general, con el fin de estructurar una ciudad competitiva, eficiente y equitativa, que permita a los ciudadanos tener oportunidades seguras de movilidad.
ALCALDÍA MUNICIPIO DEL DISTRITO CENTRAL
BLENDED LOANS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Campañas de comunicación ejecutadas Proyecto de Transporte Público para el Distrito Central (Tegucigalpa-Comayagüela, Honduras
14.08192, -87.20547
TRANSPORT
TRANSPORTE
51120
Disbursement in forth quarter of 2011
119280
Disbursement in forth quarter of 2011
22.76
Interest repayment in forth quarter of 2011
227.29
Interest repayment in forth quarter of 2011
45000
Disbursement in second quarter of 2012
105000
Disbursement in second quarter of 2012
63.91
Interest repayment in second quarter of 2012
765.02
Interest repayment in second quarter of 2012
30000
Disbursement in forth quarter of 2012
70000
Disbursement in forth quarter of 2012
137.16
Interest repayment in forth quarter of 2012
1367.24
Interest repayment in forth quarter of 2012
34200
Disbursement in forth quarter of 2012
79800
Disbursement in forth quarter of 2012
2930700
Disbursement in first quarter of 2013
6838300
Disbursement in first quarter of 2013
7212380
Loan repayment in second quarter of 2013
3048.81
Interest repayment in second quarter of 2013
64716.83
Interest repayment in second quarter of 2013
4500000
Disbursement in forth quarter of 2013
10500000
Disbursement in forth quarter of 2013
3874.36
Interest repayment in forth quarter of 2013
136036.56
Interest repayment in forth quarter of 2013
10500000
Loan repayment in first quarter of 2014
10449.08
Interest repayment in second quarter of 2014
353831.1
Interest repayment in second quarter of 2014
630000
Disbursement in second quarter of 2014
1470000
Disbursement in second quarter of 2014
10291.48
Interest repayment in forth quarter of 2014
383862.44
Interest repayment in forth quarter of 2014
10248.12
Interest repayment in second quarter of 2015
382163.38
Interest repayment in second quarter of 2015
120000
Disbursement in forth quarter of 2015
10304.43
Interest repayment in forth quarter of 2015
280000
Disbursement in forth quarter of 2015
384571.66
Interest repayment in forth quarter of 2015
10428.92
Interest repayment in second quarter of 2016
443613.61
Interest repayment in second quarter of 2016
658980
Disbursement in forth quarter of 2016
1537620
Disbursement in forth quarter of 2016
10426.28
Interest repayment in forth quarter of 2016
418794.43
Interest repayment in forth quarter of 2016
903.25
Interest repayment in second quarter of 2017
423927.68
Interest repayment in second quarter of 2017
446808.51
Loan repayment in second quarter of 2017
415605.1
Interest repayment in forth quarter of 2017
435527.69
Loan repayment in forth quarter of 2017
11280.82
Loan repayment in forth quarter of 2017
419392.9
Interest repayment in second quarter of 2018
446808.51
Loan repayment in second quarter of 2018
415629.83
Interest repayment in forth quarter of 2018
446808.51
Loan repayment in forth quarter of 2018
404168.89
Interest repayment in second quarter of 2019
446808.51
Loan repayment in second quarter of 2019
397200.11
Interest repayment in forth quarter of 2019
446808.51
Loan repayment in forth quarter of 2019
386998.38
Interest repayment in second quarter of 2020
446808.51
Loan repayment in second quarter of 2020
377835.66
Interest repayment in forth quarter of 2020
446808.51
Loan repayment in forth quarter of 2020
375444.43
Interest repayment in second quarter of 2021
446808.51
Loan repayment in second quarter of 2021
369003.95
Interest repayment in forth quarter of 2021
446808.51
Loan repayment in forth quarter of 2021
357625.21
Interest repayment in second quarter of 2022
446808.51
Loan repayment in second quarter of 2022
350176.41
Interest repayment in forth quarter of 2022
446808.51
Loan repayment in forth quarter of 2022
335365.88
Interest repayment in second quarter of 2023
446808.51
Loan repayment in second quarter of 2023
327540.62
Interest repayment in forth quarter of 2023
446808.51
Loan repayment in forth quarter of 2023
HO-L1061 [39207072].PDF
Rapport pour Publication_PMR-_HO-L1061-2013-1º-Período [38266186].PDF
Rapport pour Publication_PMR-_HO-L1061-2011-2º-Período [37298006].PDF
HO-L1061 First period Jan-Jun 2019-Public Report.pdf
HO-L1061_P476142_SP.pdf
HO-L1061_P476310_SP.pdf
Rapport pour Publication_PMR-_HO-L1061-2011-1º-Período [36624637].PDF
Relatório para publicação_PMR-_HO-L1061-2011-1º-Período [36624056].PDF
Informe para Publicación_PMR-_HO-L1061-2012-1º-Periodo [37353516].PDF
HO-L1061 [39212453].PDF
HO-L1061 Second period Jan-Dec 2015-Public Report [40377446].PDF
HO-L1061 First period Jan-Jun 2017-Public Report.pdf
HO-L1061 First period Jan-Jun 2020 - Public Report.pdf
HO-L1061 [39212470].PDF
HO-L1061 First period Jan-Jun 2021 - Public Report.pdf
Rapport pour Publication_PMR-_HO-L1061-2012-1º-Período [37352858].PDF
PIC_ HONDURAS_ Programa de Trasnporte Público para el Distrito Central (HO-L1061) [35490491].PDF
HO-L1061 [39013663].PDF
HO-L1061 First period Jan-Jun 2015-Public Report [40193979].PDF
HO-L1061 [40101091].PDF
HO-L1061 Second period Jan-Dec 2013-Public Report [40174663].PDF
Relatório para publicação_PMR-_HO-L1061-2013-1º-Período [38265522].PDF
HO-L1061_P702524_SP.pdf
HO-L1061 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1061 Second period Jan-Dec 2018-Public Report.pdf
Rapport pour Publication_PMR-_HO-L1061-2012-2º-Período [37873969].PDF
Rapport pour Publication_PMR-_HO-L1061-2010-2º-Período [36312193].PDF
Report for Publication_PMR-_HO-L1061-2011-2º-Period [37298392].PDF
HO-L1061 Second period Jan-Dec 2016-Public Report.pdf
HO-L1061 Second period Jan-Dec 2020 - Public Report.pdf
Report for Publication_PMR-_HO-L1061-2010-2º-Period [36313354].PDF
HO-L1061 Second period Jan-Dec 2017-Public Report.pdf
Relatório para publicação_PMR-_HO-L1061-2012-1º-Período [37352195].PDF
Programa de Transporte Público para el Distrito Central (Tegucigalpa-Comayagüela) [40741073].PDF
Relatório para publicação_PMR-_HO-L1061-2010-2º-Período [36310292].PDF
Report for Publication_PMR-_HO-L1061-2012-1º-Period [37354179].PDF
Informe para Publicación_PMR-_HO-L1061-2013-1º-Periodo [38266851].PDF
Informe para Publicación_PMR-_HO-L1061-2011-1º-Periodo [36625192].PDF
HO-L1061 [40853902].PDF
Report for Publication_PMR-_HO-L1061-2011-1º-Period [36625754].PDF
HO-L1061 [40803128].PDF
HO-L1061 First period Jan-Jun 2018-Public Report.pdf
HO-L1061 Second period Jan-Dec 2014-Public Report [40185549].PDF
HO-L1061_0840_2_SP.pdf
HO-L1061 Second period Jan-Dec 2022 - Public Report.PDF
Relatório para publicação_PMR-_HO-L1061-2012-2º-Período [37873301].PDF
Informe para Publicación_PMR-_HO-L1061-2010-2º-Periodo [36312780].PDF
Report for Publication_PMR-_HO-L1061-2013-1º-Period [38267525].PDF
HO-L1061 First period Jan-Jun 2022 - Public Report.PDF
HO-L1061 First period Jan-Jun 2023 - Public Report.PDF
Informe para Publicación_PMR-_HO-L1061-2011-2º-Periodo [37298196].PDF
HO-L1061 Second period Jan-Dec 2019-Public Report.pdf
HO-L1061 First period Jan-Jun 2014-Public Report [40182087].PDF
Relatório para publicação_PMR-_HO-L1061-2011-2º-Período [37297814].PDF
HO-L1061 First period Jan-Jun 2016-Public Report [40799113].PDF
PIC_ HONDURAS_ Proposal for a Loan for the Central District Public Transportation Project (HO-L1061) [35490469].PDF
Componente 1. Primer Corredor de Transporte Público Masivo
Componente 1. Primer Corredor de Transporte Público Masivo
Campañas de comunicación ejecutadas
Campañas de comunicación ejecutadas
Estructuración de la infraestructura del sistema BRT
Estructuración de la infraestructura del sistema BRT
Campañas de comunicación ejecutadas
Campañas de comunicación ejecutadas
Predios para Terminales y Patios adquiridos
Predios para Terminales y Patios adquiridos
Vías Alimentadoras Repavimentadas
Vías Alimentadoras Repavimentadas
Campañas de comunicación ejecutadas
Campañas de comunicación ejecutadas
Empresarios afectados por la implementación del BRT recibieron capacitación empresarial y Asistencia Técnica
Empresarios afectados por la implementación del BRT recibieron capacitación empresarial y Asistencia Técnica
Componente 2. Fortalecimiento Institucional
Componente 2. Fortalecimiento Institucional
Estructuración del Plan Operacional del Sistema BRT
Estructuración del Plan Operacional del Sistema BRT
XI-IATI-IADB-HO-L1182
Inter-American Development Bank
Program to Support Health Sector Reform.
Programa de Apoyo a la Reforma del Sector Salud
The objective of the programmatic series is to enhance the coverage, efficiency, and quality of the National Health System in the delivery of services to improve the health of the population throughout the country. The first operation will support the preparation and adoption of tools to strengthen the Decentralized Management Model, as well as a legal and regulatory framework for implementing health reform and changing the service delivery and organization model. It will also support the formulation of the National Quality Strategy, the restructuring of the Ministry of Health budget, and the development of a human resources
management and control system. This is the first operation in a programmatic policy-based series (PBP), to be comprised of two contractually independent and technically linked loans.
El objetivo de la serie programática es mejorar la cobertura, eficiencia y la calidad del Sistema Nacional de Salud (SNS) en la provisión de servicios para la mejora del nivel de salud de la población de todo el país. La primera operación apoyará la preparación y adopción de herramientas para el fortalecimiento del Modelo de
Gestión Descentralizada (MGD), así como de un marco legal y normativo para implementar la reforma de salud y cambiar el modelo de provisión y organización de servicios. Además, apoyará la definición de una Estrategia Nacional de Calidad (ENC), la restructuración del presupuesto de la SESAL y la definición de un sistema de gestión y control de RRHH. La presente operación es la primera de una serie Programática en Apoyo de Reformas de Política (PBP), a conformarse de dos préstamos contractualmente independientes y técnicamente vinculados.
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Estrategia Nacional de Calidad aprobada Programa de Apoyo a la Reforma del Sector Salud, Honduras
14.55, -87.83333
HEALTH
SALUD
50000000
Disbursement in third quarter of 2017
235394.52
Interest repayment in first quarter of 2018
474490.41
Interest repayment in third quarter of 2018
533791.78
Interest repayment in first quarter of 2019
568838.36
Interest repayment in third quarter of 2019
484872.5
Interest repayment in first quarter of 2020
377961.75
Interest repayment in third quarter of 2020
185750.84
Interest repayment in first quarter of 2021
212619.19
Interest repayment in third quarter of 2021
205698.63
Interest repayment in first quarter of 2022
269610.41
Interest repayment in third quarter of 2022
698545.54
Interest repayment in first quarter of 2023
1034482.76
Loan repayment in first quarter of 2023
918846.86
Interest repayment in third quarter of 2023
1034482.76
Loan repayment in third quarter of 2023
971716.87
Interest repayment in first quarter of 2024
1034482.76
Loan repayment in first quarter of 2024
Contrato - Programa de Apoyo a la Reforma del Sector Salud.pdf
HO-L1182 First period Jan-Jun 2017-Public Report.pdf
XI-IATI-IADB-HO-L1042
Inter-American Development Bank
Second Operation for the Integrated Support for the Social Safety Net Program
Segunda operacion para Programa de Apoyo Integral a la Red de Protección Social
Specific objetives of second operation: (i) technical and operational consolidation, and the expansion of coverage of the PRAF program, as well as its articulation ot the RPS; (ii) design and implementation of a gradual scheme of interventions to provide for an integral approach, the financial sustainability of the Program and the generation of synergies with intersectorial supply of services and (iii) promote the participation of households in the improvement of health services and education through a supply monitoring scheme of community intervention strategies.
Los objetivos específicos de esta segunda operación son: (i) la consolidación técnico-operativa y ampliación de cobertura del programa de transferencias condicionadas de PRAF, y su articulación con la RPS; (ii) el diseño e implementación de un esquema gradual de intervenciones que permita un enfoque integral, la sostenibilidad financiera del Programa, y genera sinergias con la oferta de servicios intersectoriales; y (iii) promover la participación de los hogares en el mejoramiento de servicios de salud, educación mediante un esquema de acompañamiento de la oferta a través de estrategias de intervención comunitaria.
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Auditorías realizadas Segunda operacion para Programa de Apoyo Integral a la Red de Protección Social, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
390000
Disbursement in second quarter of 2011
910000
Disbursement in second quarter of 2011
2428331.4
Disbursement in second quarter of 2011
5666106.6
Disbursement in second quarter of 2011
475590
Disbursement in third quarter of 2011
1109710
Disbursement in third quarter of 2011
1992555.53
Disbursement in forth quarter of 2011
4649296.25
Disbursement in forth quarter of 2011
4875.59
Interest repayment in forth quarter of 2011
48833.54
Interest repayment in forth quarter of 2011
1800000
Disbursement in forth quarter of 2011
4200000
Disbursement in forth quarter of 2011
16535112.85
Loan repayment in first quarter of 2012
1494060.9
Disbursement in first quarter of 2012
3486142.1
Disbursement in first quarter of 2012
4830556.02
Disbursement in second quarter of 2012
11271297.38
Disbursement in second quarter of 2012
9888.56
Interest repayment in second quarter of 2012
276694.99
Interest repayment in second quarter of 2012
14757439.48
Loan repayment in third quarter of 2012
2903110.8
Disbursement in forth quarter of 2012
6773925.2
Disbursement in forth quarter of 2012
185795.35
Disbursement in forth quarter of 2012
433522.47
Disbursement in forth quarter of 2012
19188.32
Interest repayment in forth quarter of 2012
529295.83
Interest repayment in forth quarter of 2012
20563.24
Interest repayment in second quarter of 2013
604592.63
Interest repayment in second quarter of 2013
20681.51
Interest repayment in forth quarter of 2013
611090.09
Interest repayment in forth quarter of 2013
6869013.14
Loan repayment in second quarter of 2014
20568.49
Interest repayment in second quarter of 2014
645455.5
Interest repayment in second quarter of 2014
20681.35
Interest repayment in forth quarter of 2014
721404.31
Interest repayment in forth quarter of 2014
20568.35
Interest repayment in second quarter of 2015
717521.64
Interest repayment in second quarter of 2015
20681.36
Interest repayment in forth quarter of 2015
726160.09
Interest repayment in forth quarter of 2015
20630.11
Interest repayment in second quarter of 2016
833807.04
Interest repayment in second quarter of 2016
20624.86
Interest repayment in forth quarter of 2016
780763.5
Interest repayment in forth quarter of 2016
746776.84
Interest repayment in second quarter of 2017
819143.22
Loan repayment in second quarter of 2017
730250.71
Interest repayment in forth quarter of 2017
819143.22
Loan repayment in forth quarter of 2017
702587.43
Interest repayment in second quarter of 2018
819143.22
Loan repayment in second quarter of 2018
690364.59
Interest repayment in forth quarter of 2018
819143.22
Loan repayment in forth quarter of 2018
671372.04
Interest repayment in second quarter of 2019
819143.22
Loan repayment in second quarter of 2019
659841.28
Interest repayment in forth quarter of 2019
819143.22
Loan repayment in forth quarter of 2019
642940.23
Interest repayment in second quarter of 2020
819143.22
Loan repayment in second quarter of 2020
627764.41
Interest repayment in forth quarter of 2020
819143.22
Loan repayment in forth quarter of 2020
625193.3
Interest repayment in second quarter of 2021
819143.22
Loan repayment in second quarter of 2021
614650.51
Interest repayment in forth quarter of 2021
819143.22
Loan repayment in forth quarter of 2021
595746.43
Interest repayment in second quarter of 2022
819143.22
Loan repayment in second quarter of 2022
583388.98
Interest repayment in forth quarter of 2022
819143.22
Loan repayment in forth quarter of 2022
558175.5
Interest repayment in second quarter of 2023
819143.22
Loan repayment in second quarter of 2023
545145.65
Interest repayment in forth quarter of 2023
819143.22
Loan repayment in forth quarter of 2023
Informe para Publicación_PMR-_HO-L1042-2010-2º-Periodo [36331219].PDF
Relatório para publicação_PMR-_HO-L1042-2011-1º-Período [36624053].PDF
Report for Publication_PMR-_HO-L1042-2011-1º-Period [36625751].PDF
Report for Publication_PMR-_HO-L1042-2011-2º-Period [37298388].PDF
Rapport pour Publication_PMR-_HO-L1042-2011-2º-Período [37298002].PDF
Informe para Publicación_PMR-_HO-L1042-2012-1º-Periodo [37353510].PDF
Contrato Modificatorio - Segunda Operación para el Programa de Apoyo Integral a la Red de Protección Social.pdf
Report for Publication_PMR-_HO-L1042-2012-1º-Period [37354174].PDF
Informe para Publicación_PMR-_HO-L1042-2011-1º-Periodo [36625189].PDF
Segunda Operación para el Programa de Apoyo Integral a la Red de Protección Social [37831018].PDF
Second Operation for the Integrated Support for the Social Safety Net Program [35351840].PDF
Relatório para publicação_PMR-_HO-L1042-2012-1º-Período [37352190].PDF
Report for Publication_PMR-_HO-L1042-2010-2º-Period [36331228].PDF
Rapport pour Publication_PMR-_HO-L1042-2010-2º-Período [36331211].PDF
Informe para Publicación_PMR-_HO-L1042-2012-2º-Periodo [37874625].PDF
Relatório para publicação_PMR-_HO-L1042-2010-2º-Período [36331202].PDF
Contrato - Segunda Operación para el Programa de Apoyo Integral a la Red de Protección Social.pdf
Rapport pour Publication_PMR-_HO-L1042-2011-1º-Período [36624634].PDF
Informe para Publicación_PMR-_HO-L1042-2011-2º-Periodo [37298192].PDF
HO-L1042 Second period Jan-Dec 2013-Public Report [40174696].PDF
Report for Publication_PMR-_HO-L1042-2012-2º-Period [37875450].PDF
Rapport pour Publication_PMR-_HO-L1042-2012-1º-Período [37352854].PDF
Segunda Operación para el Programa de Apoyo Integral a la Red de Protección Social [35351785].PDF
Relatório para publicação_PMR-_HO-L1042-2011-2º-Período [37297810].PDF
Relatório para publicação_PMR-_HO-L1042-2012-2º-Período [37873297].PDF
Rapport pour Publication_PMR-_HO-L1042-2012-2º-Período [37873965].PDF
Administración del Programa
Administración del Programa
Personal (consultorías) UAP/SDP realizadas
Personal (consultorías) UAP/SDP realizadas
Personal (consultorías) UAP/SDP realizadas
Personal (consultorías) UAP/SDP realizadas
Personal (Consultorías) a nivel regional / PRAF/UCP realizadas
Personal (Consultorías) a nivel regional / PRAF/UCP realizadas
Materiales e Insumos para Gestión de Transferencias adquiridos
Materiales e Insumos para Gestión de Transferencias adquiridos
Auditorías
Auditorías
Auditorías realizadas
Auditorías realizadas
Auditorías realizadas
Auditorías realizadas
Auditorías realizadas
Auditorías realizadas
Fortalecimiento Institucional
Fortalecimiento Institucional
Evaluacion de Impacto realizada
Evaluacion de Impacto realizada
Registro de beneficiarios Bono 10 mil actualizado
Registro de beneficiarios Bono 10 mil actualizado
Fortalecimiento PRAF a nivel local (promotores)
Fortalecimiento PRAF a nivel local (promotores)
Sistema informatico PRAF actualizado
Sistema informatico PRAF actualizado
Capacitaciones y Materiales para Comites Escolares Comunitarios realizadas y aduiridos
Capacitaciones y Materiales para Comites Escolares Comunitarios realizadas y aduiridos
Equipamiento para sistema de información del PRAF adquirido
Equipamiento para sistema de información del PRAF adquirido
Transferencias Monetarias con Corresponsabilidades
Transferencias Monetarias con Corresponsabilidades
Hogares Beneficiados de transferencias monetarias condicionadas
Hogares Beneficiados de transferencias monetarias condicionadas
Hogares Beneficiados de transferencias monetarias condicionadas
Hogares Beneficiados de transferencias monetarias condicionadas
XI-IATI-IADB-HO-L1033
Inter-American Development Bank
Agricultural Corridor Road Program (Tegucigalpa - Puerto Castilla)
Programa Vial del Corredor Agrícola Tegucigalpa-Puerto Castilla
The general objective of the program is sustainable improvement of the conditions of carriage of cargo and passengers in the agricultural corridor. The specific objectives are (i) reducing operating costs and travel times, (ii) to increase regional integration of the country through improvements in accessibility, and (iii) improving the living conditions of the population of the areas within area of influence of the project. To achieve these objectives, the program is structured with the following components: (i) management, studies and supervision, (ii) rehabilitation and paving of the corridor between agricultural and Gualaco Puerto Castilla (approximately 180 kms.) Including rehabilitation of bridges and their safety Road, (iii) support the capabilities and management tools and (iv) routine maintenance by micro keeping with indigenous residents of the area. The broker communicates agricultural Tegucigalpa, the capital with the Department of Olancho and the Atlantic Honduras.
El objetivo general del Programa es la mejora sostenible de las condiciones del transporte de carga y pasajeros en el corredor agrícola. Los objetivos específicos son (i) reducir los costos de operación y tiempos de viaje; (ii) incrementar la integración regional del país a través de las mejoras en accesibilidad; y (iii) mejorar las condiciones de vida de la población de las zonas dentro del área de influencias del proyecto.Para lograr estos objetivos, el programa se estructura con las siguientes componentes: (i) administración, estudios y supervisión; (ii) rehabilitación y pavimentación del corredor agrícola entre Gualaco y Puerto Castilla (aproximadamente 180 kms.) incluyendo rehabilitación de sus puentes y seguridad vial; (iii) apoyo a las capacidades e instrumentos de gestión y (iv) mantenimiento rutinario a través de microempresas de mantenimiento con pobladores indígenas de la zona. El corredor agrícola comunica Tegucigalpa, la capital con el Departamento de Olancho y con el Atlántico de Honduras.
BLENDED LOANS
REPUBLICA DE HONDURAS
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Auditorías Financieras y Ambientales realizadas Programa Vial del Corredor Agrícola Tegucigalpa-Puerto Castilla, Honduras
14.95, -87.0
TRANSPORT
TRANSPORTE
3000000
Disbursement in forth quarter of 2011
7000000
Disbursement in forth quarter of 2011
3567.88
Interest repayment in second quarter of 2012
94295.28
Interest repayment in second quarter of 2012
3209514.6
Disbursement in forth quarter of 2012
7488867.4
Disbursement in forth quarter of 2012
3770.49
Interest repayment in forth quarter of 2012
97504.64
Interest repayment in forth quarter of 2012
8393.93
Interest repayment in second quarter of 2013
217789.59
Interest repayment in second quarter of 2013
1805303.1
Disbursement in second quarter of 2013
4212373.9
Disbursement in second quarter of 2013
2554533.3
Disbursement in forth quarter of 2013
5960577.7
Disbursement in forth quarter of 2013
9569.17
Interest repayment in forth quarter of 2013
234252.76
Interest repayment in forth quarter of 2013
13243.07
Interest repayment in second quarter of 2014
312650.06
Interest repayment in second quarter of 2014
1082365.2
Disbursement in forth quarter of 2014
2525518.8
Disbursement in forth quarter of 2014
13320.28
Interest repayment in forth quarter of 2014
306576.82
Interest repayment in forth quarter of 2014
711734.4
Disbursement in forth quarter of 2014
1660713.6
Disbursement in forth quarter of 2014
15392.9
Interest repayment in second quarter of 2015
340508.08
Interest repayment in second quarter of 2015
459000
Disbursement in third quarter of 2015
1071000
Disbursement in third quarter of 2015
15873.72
Interest repayment in forth quarter of 2015
340116.24
Interest repayment in forth quarter of 2015
949832.1
Disbursement in forth quarter of 2015
2216274.9
Disbursement in forth quarter of 2015
16951.75
Interest repayment in second quarter of 2016
431684.19
Interest repayment in second quarter of 2016
462717.3
Disbursement in forth quarter of 2016
1079673.7
Disbursement in forth quarter of 2016
17309.43
Interest repayment in forth quarter of 2016
425222.36
Interest repayment in forth quarter of 2016
648622.16
Loan repayment in forth quarter of 2016
2550000
Disbursement in first quarter of 2017
449288.47
Interest repayment in second quarter of 2017
722704.52
Loan repayment in second quarter of 2017
474324.26
Interest repayment in forth quarter of 2017
715503.69
Loan repayment in forth quarter of 2017
481273.9
Interest repayment in second quarter of 2018
715503.69
Loan repayment in second quarter of 2018
537024.06
Interest repayment in forth quarter of 2018
715503.69
Loan repayment in forth quarter of 2018
593408.42
Interest repayment in second quarter of 2019
715503.69
Loan repayment in second quarter of 2019
635274.08
Interest repayment in forth quarter of 2019
715503.69
Loan repayment in forth quarter of 2019
588566.69
Interest repayment in second quarter of 2020
715503.69
Loan repayment in second quarter of 2020
501864.76
Interest repayment in forth quarter of 2020
715503.69
Loan repayment in forth quarter of 2020
434800.35
Interest repayment in second quarter of 2021
715503.69
Loan repayment in second quarter of 2021
422626.97
Interest repayment in forth quarter of 2021
715503.69
Loan repayment in forth quarter of 2021
425162.53
Interest repayment in second quarter of 2022
715503.69
Loan repayment in second quarter of 2022
431551.95
Interest repayment in forth quarter of 2022
715503.69
Loan repayment in forth quarter of 2022
501015.13
Interest repayment in second quarter of 2023
715503.69
Loan repayment in second quarter of 2023
591491.71
Interest repayment in forth quarter of 2023
715503.69
Loan repayment in forth quarter of 2023
Link Electronico _ Informe de Gestión Ambiental y Social (IGAS) _ POD [1970701].PDF
HO-L1033 [38930398].PDF
Rapport pour Publication_PMR-_HO-L1033-2010-2º-Período [36312189].PDF
HO-L1033 [38959785].PDF
HO-L1033 [40824716].PDF
HO-L1033 Second period Jan-Dec 2013-Public Report [40174661].PDF
HO-L1033 Second period Jan-Dec 2016-Public Report.pdf
Relatório para publicação_PMR-_HO-L1033-2013-1º-Período [38265517].PDF
HO-L1033 First period Jan-Jun 2014-Public Report [40182048].PDF
HO-L1033 [38750765].PDF
ESTUDIO Y DISEÑO PARA LA REHABILITACION DE LA CARRETERA BONITO ORIENTAL-PUERTO CASTILLA Y ACCESO A TRUJILLO [35955511].PDF
Report for Publication_PMR-_HO-L1033-2010-2º-Period [36313350].PDF
Informe para Publicación_PMR-_HO-L1033-2013-1º-Periodo [38266846].PDF
HO-L1033 Second period Jan-Dec 2015-Public Report [40377440].PDF
Informe para Publicación_PMR-_HO-L1033-2011-1º-Periodo [36625187].PDF
Relatório para publicação_PMR-_HO-L1033-2011-1º-Período [36624051].PDF
Informe para Publicación_PMR-_HO-L1033-2010-2º-Periodo [36312776].PDF
PIC_ HONDURAS_ Programa Vial del Corredor Agrícola Tegucigalpa - Puerto Castilla (HO-L1033) _ LP [37018309].PDF
Relatório para publicação_PMR-_HO-L1033-2012-1º-Período [37352187].PDF
HO-L1033 First period Jan-Jun 2017-Public Report.pdf
Programa Vial del Corredor Agrícola Tegucigalpa - Puerto Castilla [38034283].PDF
Report for Publication_PMR-_HO-L1033-2011-1º-Period [36625749].PDF
Relatório para publicação_PMR-_HO-L1033-2010-2º-Período [36310288].PDF
HO-L1033 First period Jan-Jun 2015-Public Report [40193987].PDF
Report for Publication_PMR-_HO-L1033-2012-1º-Period [37354172].PDF
HO-L1033 [40290573].PDF
Relatório para publicação_PMR-_HO-L1033-2012-2º-Período [37873295].PDF
Informe para Publicación_PMR-_HO-L1033-2012-1º-Periodo [37353508].PDF
Rapport pour Publication_PMR-_HO-L1033-2013-1º-Período [38266181].PDF
PIC_ HONDURAS_ Agricultural Corridor Road Program (Tegucigalpa - Puerto Castilla) (HO-L1033) _ LP [37018312].PDF
HO-L1033 First period Jan-Jun 2016-Public Report [40799108].PDF
Relatório para publicação_PMR-_HO-L1033-2011-2º-Período [37297808].PDF
Rapport pour Publication_PMR-_HO-L1033-2012-1º-Período [37352852].PDF
Report for Publication_PMR-_HO-L1033-2011-2º-Period [37298386].PDF
HO-L1033 Second period Jan-Dec 2014-Public Report [40185550].PDF
Rapport pour Publication_PMR-_HO-L1033-2011-2º-Período [37298000].PDF
Rapport pour Publication_PMR-_HO-L1033-2011-1º-Período [36624632].PDF
Informe para Publicación_PMR-_HO-L1033-2011-2º-Periodo [37298190].PDF
Report for Publication_PMR-_HO-L1033-2013-1º-Period [38267520].PDF
Rapport pour Publication_PMR-_HO-L1033-2012-2º-Período [37873963].PDF
REHABILITACION DE LA CARRETERA GUALACO-BONITO ORIENTAL [35955722].PDF
Apoyo a las capacidades e instrumentos de gestión.
Apoyo a las capacidades e instrumentos de gestión.
Gestión ambiental y social implementada
Gestión ambiental y social implementada
Costos directos
Costos directos
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-Trujillo/Puerto Castilla mantenida.
Carretera Gualaco-San Esteban El Cabón rehabilitada
Carretera Gualaco-San Esteban El Cabón rehabilitada
Carretera Gualaco-San Esteban El Cabón rehabilitada
Carretera Gualaco-San Esteban El Cabón rehabilitada
Carretera Gualaco-San Esteban El Cabón rehabilitada
Carretera Gualaco-San Esteban El Cabón rehabilitada
Ingeniería y Administración
Ingeniería y Administración
Auditorías Financieras y Ambientales realizadas
Auditorías Financieras y Ambientales realizadas
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Auditorías Financieras y Ambientales realizadas
Auditorías Financieras y Ambientales realizadas
Auditorías Financieras y Ambientales realizadas
Auditorías Financieras y Ambientales realizadas
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Supervisión obras de rehabilitación carretera Gualaco-El Carbón realizada
Auditorías Financieras y Ambientales realizadas
Auditorías Financieras y Ambientales realizadas
Ótros estudios realizados
Ótros estudios realizados
XI-IATI-IADB-HO-L1102
Inter-American Development Bank
Cañaveral-Río Lindo Hydropower Complex Rehabilitation and Uprating Project
Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico Cañavera
The objective of the project is to recuperate and to conserve the power generation capacity from renewable energies, contributing to energy security, through the improvement of the efficiency and the extension of the lifespan of the power generation and transmission infrastructure. The specific objectives are: i) to rehabilitate the power infrastructure of the Canaveral and Rio Lindo power stations, ii) to rehabilitate the transmission infrastructure that connects the power stations to the grid; and iii) to improve the ENEE's operational and commercial efficiency generation management.
El objetivo es contribuir a recuperar y conservar la capacidad de generación de energíaeléctrica de fuentes renovables, contribuyendo a la seguridad en el suministro energéticoestatal, mediante la mejora de la eficiencia y la extensión de la vida útil de una parte de lainfraestructura de generación y transmisión existente. Los objetivos específicos son:i) rehabilitar la infraestructura de generación de las Centrales Hidroeléctricas Cañaveral ¿Rio Lindo; ii) rehabilitar los activos de transmisión que conectan las centrales al SIN; yiii) mejorar la eficiencia operativa y comercial de la gestión de generación de ENEE.
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
BLENDED LOANS
EMPRESA NACIONAL DE ENERGIA ELECTRICA
EMPRESA NACIONAL DE ENERGIA ELECTRICA
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Subestación Planta Cañaveral rehabilitada Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico Cañavera, Honduras
14.824173968, -86.600264243
ENERGY
ENERGIA
400000
Disbursement in forth quarter of 2015
600000
Disbursement in forth quarter of 2015
448.21
Interest repayment in second quarter of 2016
4888.3
Interest repayment in second quarter of 2016
502.73
Interest repayment in forth quarter of 2016
5752.46
Interest repayment in forth quarter of 2016
1287771.2
Disbursement in forth quarter of 2016
1931656.8
Disbursement in forth quarter of 2016
24579.87
Interest repayment in second quarter of 2017
1760000
Disbursement in forth quarter of 2017
30860.32
Interest repayment in forth quarter of 2017
3587656.8
Loan repayment in first quarter of 2018
65095.05
Interest repayment in second quarter of 2018
5600000
Disbursement in forth quarter of 2018
71360.23
Interest repayment in forth quarter of 2018
4000000
Disbursement in second quarter of 2019
147356.04
Interest repayment in second quarter of 2019
2000000
Disbursement in third quarter of 2019
375148.94
Interest repayment in forth quarter of 2019
2000000
Disbursement in forth quarter of 2019
202315.77
Interest repayment in second quarter of 2020
1646000
Disbursement in second quarter of 2020
197625.87
Interest repayment in forth quarter of 2020
475152
Disbursement in forth quarter of 2020
216240.02
Interest repayment in second quarter of 2021
271257.25
Loan repayment in second quarter of 2021
1299420
Disbursement in third quarter of 2021
227442.79
Interest repayment in forth quarter of 2021
287845.59
Loan repayment in forth quarter of 2021
227406.08
Interest repayment in second quarter of 2022
287845.59
Loan repayment in second quarter of 2022
226427.37
Interest repayment in forth quarter of 2022
287845.59
Loan repayment in forth quarter of 2022
215513.99
Interest repayment in second quarter of 2023
287845.59
Loan repayment in second quarter of 2023
213733.2
Interest repayment in forth quarter of 2023
287845.59
Loan repayment in forth quarter of 2023
HO-L1102 - Plan de Adquisiciones [39307352].XLSX
HO-L1102 [40117194].PDF
HO-L1102 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1102 First period Jan-Jun 2023 - Public Report.PDF
Contrato - Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico Cañaveral Río Lindo [39841038].PDF
HO-L1102 Second period Jan-Dec 2018-Public Report.pdf
HO-L1102 [40005394].PDF
HO-L1102_3065_SP.pdf
HO-L1102 [40133244].PDF
HO-L1102 [40819656].PDF
HO-L1102_5345_1_SP.pdf
HO-L1102 First period Jan-Jun 2021 - Public Report.pdf
HO-L1102 Second period Jan-Dec 2019-Public Report.pdf
EEO - Avance Reformas [39407263].docx
HO-L1102 [40142647].PDF
HO-L1102 First period Jan-Jun 2017-Public Report.pdf
HO-L1102 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1102 First period Jan-Jun 2019-Public Report.pdf
HO-L1102_P563065_SP.pdf
HO-L1102 [40308697].PDF
Honduras_ Propuesta de préstamo para el Proyecto de Rehabilitación y Repotenciación del Complejo Hidroeléctrico [39474624].PDF
HO-L1102 First period Jan-Jun 2020 - Public Report.pdf
HO-L1102 - FINAL ESMR [39325704].docx
HO-L1102 - Plan de Seguimiento y Evaluación [39301827].doc
HO-L1102 - Análisis integración Regional [39302736].doc
HO-L1102 Evaluación Económica [39327579].PDF
HO-L1102 Second period Jan-Dec 2016-Public Report.pdf
HO-L1102 - Estudio Transmision [39307611].PDF
HO-L1102 Second period Jan-Dec 2017-Public Report.pdf
HO-L1102 [40710320].PDF
HO-L1102 Plan de Ejecución del Programa PEP [39327840].PDF
HO-L1102 First period Jan-Jun 2018-Public Report.pdf
HO-L1102_5345_2_SP.pdf
HO-L1102_P1005345_SP.pdf
Honduras_ Proposal for a loan for the Cañaveral Río Lindo Hydropower Complex Rehabilitation and Uprating Project [39474627].PDF
HO-L1102 - Estudio Generación [39307608].PDF
HO-L1102 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1102 First period Jan-Jun 2022 - Public Report.PDF
JICA Final Report (Hydropower Strengthening Project)) [38762708].PDF
HO-L1102 - Analisis cumplimiento Política Servicos Públicos PSP [39310037].doc
COMPONENTE 1. Repotenciación y rehabilitación de generación y transmisión
COMPONENTE 1. Repotenciación y rehabilitación de generación y transmisión
Subestación Planta Cañaveral rehabilitada
Subestación Planta Cañaveral rehabilitada
Subestación Planta Río Lindo rehabilitada
Subestación Planta Río Lindo rehabilitada
COMPONENTE 2. Fortalecimiento de la Empresa de Generación de la ENEE
COMPONENTE 2. Fortalecimiento de la Empresa de Generación de la ENEE
Unidad de la Central Hidroeléctrica Cañaveral - Río Lindo fortalecida
Unidad de la Central Hidroeléctrica Cañaveral - Río Lindo fortalecida
XI-IATI-IADB-HO-L1199
Inter-American Development Bank
Comprehensive Strengthening of Tegucigalpa's Trauma and Emergency Care Network
Fortalecimiento Integral de la Red de Atención de Traumas y Urgencias de Tegucigalpa.
The objective of the operation is to strengthen the supply of trauma and emergency servicesin Tegucigalpa and the Central-Southeast region by building a new trauma hospital, to improve the quality of life and care of patients with externally caused injuries and other pathologies through decongestion of services at the University HospitalSchool (HEU)
El objetivo de la operación es fortalecer la oferta de servicios de atención de trauma y urgencias en Tegucigalpa y la zona centro-sur-oriente, a través de la construcción de un nuevo Hospital de Trauma, para mejorar la calidad de vida y la atención de la demanda de pacientes con Lesiones de Causa Externa (LCE) y de otras patologías derivadas del descongestionamiento de los servicios del Hospital Escuela Universitario (HEU).
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
SECRETARÍA DE ESTADO EN EL DESPACHO DE SALUD (SESAL)
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Dosis de vacunas contra la COVID-19 adquiridas y recibidas Fortalecimiento Integral de la Red de Atención de Traumas y Urgencias de Tegucigalpa., Honduras
14.08192, -87.20547
HEALTH
SALUD
853047.0
821293.2
789001.2
756171.0
723340.8
689972.4
657680.4
624312.0
592558.2
561342.6
530665.2
501064.2
472001.4
444015.0
418181.4
391809.6
367590.6
344448.0
322381.8
301392.0
281478.6
262641.6
244881.0
227658.6
212589.0
2928483.2
27000000
Disbursement in forth quarter of 2021
112086.24
Interest repayment in second quarter of 2022
6500000
Disbursement in third quarter of 2022
362037.33
Interest repayment in forth quarter of 2022
598876.02
Interest repayment in second quarter of 2023
684788.19
Interest repayment in forth quarter of 2023
5000000
Disbursement in forth quarter of 2023
HO-L1199_5124_2_SP.pdf
Contrato Modificatorio No. 2 - Respuesta Inmediata de Salud Pública para Contener y Controlar el Coronavirus (COVID-19.pdf
HO-L1199 First period Jan-Jun 2023 - Public Report.PDF
HO-L1199_P2081143_SP.pdf
HO-L1199_4609_1_SP.pdf
HO-L1199 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1199_4609_2_SP.pdf
HO-L1199_P1176733_SP.pdf
HO-L1199_P1176733_1_SP.pdf
Comprehensive Strengthening of Tegucigalpa's Trauma and Emergency Care Network.pdf
Reformulation of the Project for Comprehensive Strengthening of Tegucigalpa Trauma and Emergency Care Network.pdf
HO-L1199_P2055783_SP.pdf
Fortalecimiento Integral de la Red de Atención de Traumas y Urgencias de Tegucigalpa.pdf
HO-L1199 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1199_P2052397_1_SP.pdf
HO-L1199 First period Jan-Jun 2019-Public Report.pdf
HO-L1199 First period Jan-Jun 2021 - Public Report.pdf
Propuesta de Reformulacion del prestamo 4713-BL-HO (HO-L1199).pdf
HO-L1199_P2081143_1_SP.pdf
Proposed reformulation of loan 4713-BL-HO (HO-L1199).pdf
HO-L1199 First period Jan-Jun 2022 - Public Report.PDF
HO-L1199_P1125124_SP.pdf
HO-L1199 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1199 Second period Jan-Dec 2018-Public Report.pdf
HO-L1199_P2055783_1_SP.pdf
HO-L1199_P2081143_2_SP.pdf
HO-L1199_5124_3_SP.pdf
HO-L1199 First period Jan-Jun 2020 - Public Report.pdf
Reformulación del Proyecto de Fortalecimiento Integral de la Red de Atención de Traumas y Urgencias de Tegucigalpa.pdf
HO-L1199 Second period Jan-Dec 2019-Public Report.pdf
HO-L1199_P1184041_GN.pdf
HO-L1199_P1134609_SP.pdf
HO-L1199_P2052397_SP.pdf
Componente 1: Conducción de la respuesta a nivel del país
Componente 1: Conducción de la respuesta a nivel del país
Técnicos en monitoreo contratados para el fortalecimiento de la Unidad de Gestión descentralizada, Departamento de Primer Nivel de Atención y Departamento de Servicios de Segundo Nivel de la SESAL
Técnicos en monitoreo contratados para el fortalecimiento de la Unidad de Gestión descentralizada, Departamento de Primer Nivel de Atención y Departamento de Servicios de Segundo Nivel de la SESAL
Técnicos en monitoreo contratados para el fortalecimiento de la Unidad de Gestión descentralizada, Departamento de Primer Nivel de Atención y Departamento de Servicios de Segundo Nivel de la SESAL
Técnicos en monitoreo contratados para el fortalecimiento de la Unidad de Gestión descentralizada, Departamento de Primer Nivel de Atención y Departamento de Servicios de Segundo Nivel de la SESAL
Componente 2. Detección y seguimiento de los casos
Componente 2. Detección y seguimiento de los casos
Unidad de Vigilancia epidemiológica fortalecida para el análisis y construcción de proyecciones y escenarios de número de casos y fallecimientos por COVID
Unidad de Vigilancia epidemiológica fortalecida para el análisis y construcción de proyecciones y escenarios de número de casos y fallecimientos por COVID
Componente 3. Interrupción de la cadena de transmisión
Componente 3. Interrupción de la cadena de transmisión
Dosis de vacunas contra la COVID-19 adquiridas y recibidas
Dosis de vacunas contra la COVID-19 adquiridas y recibidas
Componente 4. Mejoramiento de la capacidad de provisión de servicios
Componente 4. Mejoramiento de la capacidad de provisión de servicios
Gestores Fortalecidos en la gestion administrativa financiera de los convenios
Gestores Fortalecidos en la gestion administrativa financiera de los convenios
Personal Medico y de Enfermeria contratado temporalmente en el marco del Plan de Respuesta inmediata para la atencion de la Pandemia COVID-19.
Personal Medico y de Enfermeria contratado temporalmente en el marco del Plan de Respuesta inmediata para la atencion de la Pandemia COVID-19.
Personal Medico y de Enfermeria contratado temporalmente en el marco del Plan de Respuesta inmediata para la atencion de la Pandemia COVID-19.
Personal Medico y de Enfermeria contratado temporalmente en el marco del Plan de Respuesta inmediata para la atencion de la Pandemia COVID-19.
Regiones sanitarias con convenios firmados para el funcionamiento de establecimientos para brindar cuidados a los pacientes con COVID 19.
Regiones sanitarias con convenios firmados para el funcionamiento de establecimientos para brindar cuidados a los pacientes con COVID 19.
Hospitales con convenios de gestión para la atención de pacientes con COVID 19 firmados.
Hospitales con convenios de gestión para la atención de pacientes con COVID 19 firmados.
XI-IATI-IADB-HO-L1226
Inter-American Development Bank
Support for Vulnerable Populations Affected by Coronavirus (COVID-19)
Apoyo a Poblaciones Vulnerables Afectadas por Coronavirus (COVID-19)
Contribute to ensuring minimum levels of quality of life for vulnerable persons amid the crisis caused by COVID-19. The specific objective is to support minimum income for those affected by the coronavirus in the immediate period and during the recovery; and ii) preserve human capital of people affected by the coronavirus crisis.
Contribuir a asegurar niveles mínimos de calidad de vida de las personas vulnerables frente a la crisis causada por el COVID-19. Los objetivos específicos son: (i) apoyar niveles mínimos de ingreso de personas afectadas por la Pandemia COVID-19, en el periodo inmediato y durante la recuperación; y (ii) preservar el capital humano de las personas afectadas por la crisis de coronavirus.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
PROGRAMA DE LA RED SOLIDARIA
PROGRAMA DE LA RED SOLIDARIA
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Apoyo al Desarrollo del Paquete básico educativo realizado Apoyo a Poblaciones Vulnerables Afectadas por Coronavirus (COVID-19), Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
204750.0
190350.0
177750.0
2327150.0
30000000
Disbursement in forth quarter of 2022
280799.28
Interest repayment in first quarter of 2023
643213.3
Interest repayment in third quarter of 2023
12100000
Disbursement in forth quarter of 2023
HO-L1226 First period Jan-Jun 2023 - Public Report.PDF
HO-L1226 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1226 First period Jan-Jun 2021 - Public Report.pdf
HO-L1226 Loan proposal.pdf
Support for Vulnerable Populations Affected by Coronavirus.pdf
Apoyo a Poblaciones Vulnerables Afectadas por Coronavirus.pdf
Contrato - Proyecto de Apoyo a Poblaciones Vulnerables afectadas por Coronavirus.pdf
Contrato Modificatorio - Proyecto de Apoyo a Poblaciones Vulnerables afectadas por Coronavirus.pdf
HO-L1226 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1226_P890420_GN.pdf
HO-L1226 Propuesta de préstamo.pdf
HO-L1226 First period Jan-Jun 2022 - Public Report.PDF
Protección mediante el uso de programas de transferencias monetarias para grupos vulnerables
Protección mediante el uso de programas de transferencias monetarias para grupos vulnerables
Apoyo al Desarrollo del Paquete básico educativo realizado
Apoyo al Desarrollo del Paquete básico educativo realizado
Número de personas en hogares participantes del Programa que recibe transferencias monetarias condicionadas regulares durante los meses de emergencia sanitaria o recuperación, entregadas.
Número de personas en hogares participantes del Programa que recibe transferencias monetarias condicionadas regulares durante los meses de emergencia sanitaria o recuperación, entregadas.
Sistema de Información de las TMC del Programa de la Red Solidaria fortalecido
Sistema de Información de las TMC del Programa de la Red Solidaria fortalecido
Modelo de Gestion Operativa Fortalecido
Modelo de Gestion Operativa Fortalecido
XI-IATI-IADB-HO-L1071
Inter-American Development Bank
Support to the Social Protection Network Program
Programa de Apoyo a la Red de Protección Social
The general objective of the program is to promote human capital accumulation in the most vulnerable population.
El objetivo general de este programa es fomentar la acumulación de capital humano en familias que viven en situación de pobreza.
INTER AMERICAN DEVELOPMENT BANK
PROGRAMA DE ASIGNACION FAMILIAR
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Beneficiarios que reciben capacitación en temas de inclusión, género y diversidad Programa de Apoyo a la Red de Protección Social, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
6416402.4
Disbursement in forth quarter of 2012
14971605.6
Disbursement in forth quarter of 2012
14971605.6
Loan repayment in first quarter of 2013
5659.56
Interest repayment in first quarter of 2013
52294.34
Interest repayment in first quarter of 2013
5478263.1
Disbursement in first quarter of 2013
12782613.9
Disbursement in first quarter of 2013
5610931.5
Disbursement in second quarter of 2013
13092173.5
Disbursement in second quarter of 2013
25874787.4
Loan repayment in third quarter of 2013
16953.05
Interest repayment in third quarter of 2013
427858
Interest repayment in third quarter of 2013
2700000
Disbursement in forth quarter of 2013
6300000
Disbursement in forth quarter of 2013
24465.96
Interest repayment in first quarter of 2014
992362.73
Interest repayment in first quarter of 2014
1440000
Disbursement in second quarter of 2014
3360000
Disbursement in second quarter of 2014
25848.3
Interest repayment in third quarter of 2014
916781.69
Interest repayment in third quarter of 2014
27279.38
Interest repayment in first quarter of 2015
939215.06
Interest repayment in first quarter of 2015
424500
Disbursement in first quarter of 2015
1981000
Disbursement in first quarter of 2015
27259.11
Interest repayment in third quarter of 2015
932117.88
Interest repayment in third quarter of 2015
429903
Disbursement in third quarter of 2015
1003107
Disbursement in third quarter of 2015
7980328.26
Loan repayment in forth quarter of 2015
28209.34
Interest repayment in first quarter of 2016
1119025.88
Interest repayment in first quarter of 2016
27971.31
Interest repayment in third quarter of 2016
1123821.27
Interest repayment in third quarter of 2016
1168398.41
Interest repayment in first quarter of 2017
1094908.38
Interest repayment in third quarter of 2017
1126832.19
Interest repayment in first quarter of 2018
1091990.76
Interest repayment in third quarter of 2018
1093750
Loan repayment in third quarter of 2018
1090867.18
Interest repayment in first quarter of 2019
1093750.02
Loan repayment in first quarter of 2019
1050593
Interest repayment in third quarter of 2019
1093750
Loan repayment in third quarter of 2019
1044780.47
Interest repayment in first quarter of 2020
1093750
Loan repayment in first quarter of 2020
1009275.9
Interest repayment in third quarter of 2020
1093750
Loan repayment in third quarter of 2020
998532.54
Interest repayment in first quarter of 2021
1093750
Loan repayment in first quarter of 2021
990964.1
Interest repayment in third quarter of 2021
1093750
Loan repayment in third quarter of 2021
977940.87
Interest repayment in first quarter of 2022
1093750
Loan repayment in first quarter of 2022
939213.18
Interest repayment in third quarter of 2022
1093750
Loan repayment in third quarter of 2022
931619.65
Interest repayment in first quarter of 2023
1093750
Loan repayment in first quarter of 2023
880412.82
Interest repayment in third quarter of 2023
1093750
Loan repayment in third quarter of 2023
874474.36
Interest repayment in first quarter of 2024
1093750
Loan repayment in first quarter of 2024
Report for Publication_PMR-_HO-L1071-2012-1º-Period [37354182].PDF
Rapport pour Publication_PMR-_HO-L1071-2013-1º-Período [38266189].PDF
HO-L1071 First period Jan-Jun 2014-Public Report [40182067].PDF
HO-L1071 [39600338].PDF
Social Safety Net Support Program - Loan Proposal [36892859].PDF
Relatório para publicação_PMR-_HO-L1071-2012-2º-Período [37873304].PDF
Rapport pour Publication_PMR-_HO-L1071-2012-1º-Período [37352861].PDF
Report for Publication_PMR-_HO-L1071-2013-1º-Period [38267528].PDF
Contrato - Programa de Apoyo a la Red de Protección Social.pdf
Rapport pour Publication_PMR-_HO-L1071-2012-2º-Período [37873972].PDF
HO-L1071 Second period Jan-Dec 2013-Public Report [40174681].PDF
HO-L1071 [39272931].PDF
Programa de Apoyo a la Red de Protección Social - Propuesta de Prestamo [36892831].PDF
HO-L1071 Second period Jan-Dec 2014-Public Report [40185538].PDF
HO-L1071 [39625013].PDF
Informe para Publicación_PMR-_HO-L1071-2013-1º-Periodo [38266854].PDF
Informe para Publicación_PMR-_HO-L1071-2012-1º-Periodo [37353519].PDF
Relatório para publicação_PMR-_HO-L1071-2012-1º-Período [37352198].PDF
Relatório para publicação_PMR-_HO-L1071-2013-1º-Período [38265525].PDF
Componente 1. Transferencias Monetarias Condicionadas
Componente 1. Transferencias Monetarias Condicionadas
Personas beneficiarios en zonas rurales que reciben transferencias monetarias condicionadas
Personas beneficiarios en zonas rurales que reciben transferencias monetarias condicionadas
Personas beneficiarios en zonas rurales que reciben transferencias monetarias condicionadas
Personas beneficiarios en zonas rurales que reciben transferencias monetarias condicionadas
Componente 2. Fortalecimiento Institucional para la consolidación del Programa Bono 10,000
Componente 2. Fortalecimiento Institucional para la consolidación del Programa Bono 10,000
Promotores de salud contratados para la mejora de procesos del programa incluyendo en la verificacion de corresponsabilidades y capacitaciones a beneficiarios
Promotores de salud contratados para la mejora de procesos del programa incluyendo en la verificacion de corresponsabilidades y capacitaciones a beneficiarios
Personal de salud capacitado en verificación de corresponsabilidad
Personal de salud capacitado en verificación de corresponsabilidad
Consultorias para mejora en la verificación de corresponsabilidades
Consultorias para mejora en la verificación de corresponsabilidades
Unidades de salud con procesos de verificación de corresponsabilidad de salud sistematizados y mejorados
Unidades de salud con procesos de verificación de corresponsabilidad de salud sistematizados y mejorados
Unidades de salud con procesos de verificación de corresponsabilidad de salud sistematizados y mejorados
Unidades de salud con procesos de verificación de corresponsabilidad de salud sistematizados y mejorados
Promotores de salud contratados para la mejora de procesos del programa incluyendo en la verificacion de corresponsabilidades y capacitaciones a beneficiarios
Promotores de salud contratados para la mejora de procesos del programa incluyendo en la verificacion de corresponsabilidades y capacitaciones a beneficiarios
Capacitaciones a los Comites Escolares Comunitarios
Capacitaciones a los Comites Escolares Comunitarios
Diagnóstico de mejoras en la inclusión de beneficiarios concluido
Diagnóstico de mejoras en la inclusión de beneficiarios concluido
Personal de educación capacitados en la mejora de procesos del Programa
Personal de educación capacitados en la mejora de procesos del Programa
Distritos educativos con procesos de verificacion de corresponsabilidad sitematizados y mejorados
Distritos educativos con procesos de verificacion de corresponsabilidad sitematizados y mejorados
Beneficiarios que reciben capacitación en temas de inclusión, género y diversidad
Beneficiarios que reciben capacitación en temas de inclusión, género y diversidad
Personal de educación capacitados en la mejora de procesos del Programa
Personal de educación capacitados en la mejora de procesos del Programa
Consultorias para mejora en la verificación de corresponsabilidades
Consultorias para mejora en la verificación de corresponsabilidades
Equipo técnico capacitado en experiencias internacionales mediante viajes de estudio, capacitaciones a beneficiarios y a municipalidades/mancomunidades
Equipo técnico capacitado en experiencias internacionales mediante viajes de estudio, capacitaciones a beneficiarios y a municipalidades/mancomunidades
Personal de salud capacitado en verificación de corresponsabilidad
Personal de salud capacitado en verificación de corresponsabilidad
Componente 3. Monitoreo y Evaluación
Componente 3. Monitoreo y Evaluación
Evaluacion Mecanismos alternos de pago contratado
Evaluacion Mecanismos alternos de pago contratado
Revisión de corresponsabilidades en campo y control interno
Revisión de corresponsabilidades en campo y control interno
Evaluacion de Impacto del Programa Bono 10,000
Evaluacion de Impacto del Programa Bono 10,000
XI-IATI-IADB-HO-L1018
Inter-American Development Bank
Infrastructure Program for the San Pedro Sula Logistics Corridor
Programa de Infraestructura Corredor Logístico - San Pedro Sula
To expand, rehabilitate, and improve the Second Peripheral Ring Road between the northern headwaters of the Chamelecon river and the Gala intersection, to ease the congestion that occurs as the road cuts through the city, thus affording faster access to Puerto Cortes.
Ampliar, rehabilitar y mejorar el Segundo Anillo Periférico entre la cabecera Norte del Río Chamelecón e Intersección Gala, dando solución a los principales cuellos de botella que existen en el cruce de ésta vía por la ciudad, al tiempo que agiliza el acceso a Puerto Cortés.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Etapa I: Tramo Est. 13+600 -Intersección Gala Construido . Programa de Infraestructura Corredor Logístico - San Pedro Sula, Honduras
15.50395, -88.01573
TRANSPORT
TRANSPORTE
80556
Disbursement in forth quarter of 2010
187964
Disbursement in forth quarter of 2010
108.14
Interest repayment in second quarter of 2011
3472.24
Interest repayment in second quarter of 2011
41019
Disbursement in third quarter of 2011
95711
Disbursement in third quarter of 2011
90476.4
Disbursement in forth quarter of 2011
211111.6
Disbursement in forth quarter of 2011
133
Interest repayment in forth quarter of 2011
4089.01
Interest repayment in forth quarter of 2011
14662.5
Disbursement in second quarter of 2012
34212.5
Disbursement in second quarter of 2012
272.54
Interest repayment in second quarter of 2012
6949.1
Interest repayment in second quarter of 2012
24555
Disbursement in third quarter of 2012
57295
Disbursement in third quarter of 2012
313.74
Interest repayment in forth quarter of 2012
8187.07
Interest repayment in forth quarter of 2012
156045.9
Disbursement in first quarter of 2013
364107.1
Disbursement in first quarter of 2013
440.38
Interest repayment in second quarter of 2013
11389.03
Interest repayment in second quarter of 2013
510.54
Interest repayment in forth quarter of 2013
12328.39
Interest repayment in forth quarter of 2013
926935.2
Disbursement in second quarter of 2014
2162848.8
Disbursement in second quarter of 2014
507.75
Interest repayment in second quarter of 2014
11909.44
Interest repayment in second quarter of 2014
2619723.3
Disbursement in forth quarter of 2014
6112687.7
Disbursement in forth quarter of 2014
1831.1
Interest repayment in forth quarter of 2014
41995.94
Interest repayment in forth quarter of 2014
5198.08
Interest repayment in second quarter of 2015
114024.73
Interest repayment in second quarter of 2015
1500000
Disbursement in third quarter of 2015
3500000
Disbursement in third quarter of 2015
6497.11
Interest repayment in forth quarter of 2015
138364.53
Interest repayment in forth quarter of 2015
270764.63
Loan repayment in forth quarter of 2015
546026.7
Disbursement in first quarter of 2016
1274062.3
Disbursement in first quarter of 2016
7224.83
Interest repayment in second quarter of 2016
183073.63
Interest repayment in second quarter of 2016
298461.63
Loan repayment in second quarter of 2016
7500
Interest repayment in forth quarter of 2016
179510
Interest repayment in forth quarter of 2016
298461.65
Loan repayment in forth quarter of 2016
174162.01
Interest repayment in second quarter of 2017
298461.64
Loan repayment in second quarter of 2017
183312.99
Interest repayment in forth quarter of 2017
298461.64
Loan repayment in forth quarter of 2017
186467.47
Interest repayment in second quarter of 2018
298461.64
Loan repayment in second quarter of 2018
209517.01
Interest repayment in forth quarter of 2018
298461.64
Loan repayment in forth quarter of 2018
233436.65
Interest repayment in second quarter of 2019
298461.64
Loan repayment in second quarter of 2019
242240.44
Interest repayment in forth quarter of 2019
298461.64
Loan repayment in forth quarter of 2019
219758.78
Interest repayment in second quarter of 2020
298461.64
Loan repayment in second quarter of 2020
180529.38
Interest repayment in forth quarter of 2020
298461.64
Loan repayment in forth quarter of 2020
161761.23
Interest repayment in second quarter of 2021
298461.64
Loan repayment in second quarter of 2021
157833.6
Interest repayment in forth quarter of 2021
298461.64
Loan repayment in forth quarter of 2021
162351.53
Interest repayment in second quarter of 2022
298461.64
Loan repayment in second quarter of 2022
160545.27
Interest repayment in forth quarter of 2022
298461.64
Loan repayment in forth quarter of 2022
197428.12
Interest repayment in second quarter of 2023
298461.64
Loan repayment in second quarter of 2023
225216.02
Interest repayment in forth quarter of 2023
298461.64
Loan repayment in forth quarter of 2023
Rapport pour Publication_PMR-_HO-L1018-2012-2º-Período [37873958].PDF
HO-L1018 Second period Jan-Dec 2015-Public Report [40377539].PDF
Rapport pour Publication_PMR-_HO-L1018-2013-1º-Período [38266177].PDF
Report for Publication_PMR-_HO-L1018-2012-2º-Period [37875443].PDF
Relatório para publicação_PMR-_HO-L1018-2010-2º-Período [36310282].PDF
Informe para Publicación_PMR-_HO-L1018-2011-1º-Periodo [36625181].PDF
HO-L1018 [36550711].PDF
Report for Publication_PMR-_HO-L1018-2012-1º-Period [37354166].PDF
Informe para Publicación_PMR-_HO-L1018-2012-2º-Periodo [37874618].PDF
HO-L1018 First period Jan-Jun 2015-Public Report [40193965].PDF
Rapport pour Publication_PMR-_HO-L1018-2011-2º-Período [37297995].PDF
Report for Publication_PMR-_HO-L1018-2013-1º-Period [38267516].PDF
Report for Publication_PMR-_HO-L1018-2011-2º-Period [37298380].PDF
Report for Publication_PMR-_HO-L1018-2010-2º-Period [36313344].PDF
Honduras. HO-L1018_ Programa de Infraestructura Corredor Logistico_San Pedro Sula_PCR.pdf
HO-L1018 [38908731].PDF
Informe para Publicación_PMR-_HO-L1018-2013-1º-Periodo [38266842].PDF
Contrato - Programa de Infraestructura Corredor Logístico – San Pedro Sula.pdf
Informe para Publicación_PMR-_HO-L1018-2010-2º-Periodo [36312770].PDF
Relatório para publicação_PMR-_HO-L1018-2011-2º-Período [37297803].PDF
Rapport pour Publication_PMR-_HO-L1018-2012-1º-Período [37352846].PDF
HO-L1018 [38908730].PDF
HO-L1018 Second period Jan-Dec 2014-Public Report [40185553].PDF
HO-L1018 First period Jan-Jun 2016-Public Report [40799127].PDF
HONDURAS_ Programa de Infraestructura Corredor Logístico - San Pedro Sula_ Propuesta de Préstamo_ [1713661].PDF
Relatório para publicação_PMR-_HO-L1018-2012-2º-Período [37873290].PDF
Rapport pour Publication_PMR-_HO-L1018-2011-1º-Período [36624626].PDF
HO-L1018 [40110720].PDF
HO-L1018 [36654283].PDF
Report for Publication_PMR-_HO-L1018-2011-1º-Period [36625743].PDF
Rapport pour Publication_PMR-_HO-L1018-2010-2º-Período [36312183].PDF
Relatório para publicação_PMR-_HO-L1018-2012-1º-Período [37352182].PDF
HO-L1018 First period Jan-Jun 2014-Public Report [40182071].PDF
PROGRAMA DE INFRAESTRUCTURA CORREDOR LOGISTICO - SAN PEDRO SULA [35589453].PDF
HO-L1018 Second period Jan-Dec 2013-Public Report [40174668].PDF
Informe para Publicación_PMR-_HO-L1018-2011-2º-Periodo [37298185].PDF
Informe para Publicación_PMR-_HO-L1018-2012-1º-Periodo [37353502].PDF
Relatório para publicação_PMR-_HO-L1018-2013-1º-Período [38265513].PDF
Relatório para publicação_PMR-_HO-L1018-2011-1º-Período [36624045].PDF
Infrastructure Program for the San Pedro Sula Logistics Corridor [2025866].PDF
Rehabilitación y Construcción tramo entre Calle 6 e Intersección Gala.
Rehabilitación y Construcción tramo entre Calle 6 e Intersección Gala.
Etapa I: Tramo Est. 13+600 -Intersección Gala Construido .
Etapa I: Tramo Est. 13+600 -Intersección Gala Construido .
XI-IATI-IADB-HO0195
Inter-American Development Bank
National Sustainable Tourism Program
Programa Nacional de Turismo Sostenible (PNTS)
The operation will finance actions oriented to consolidate the vision of the sector as a leader in the strategy of the country development. The investment will be organized in three components: (i) Support to the National Sustainable Tourism Strategy; (ii) the Tela Bay project; and (iii) The Mundo Maya Sustainable Tourism Project. The first component will finance actions identified as priority in sphere of action of the public sector to support the development of the sector in the whole country, grouped by: (i) specific investment in basic sanitation, management/conservation of natural areas, urban improvements; (ii) a quality management system, including environmental management required to support the sector; (iii) training and institutional strengthening; (iv) support for small entrepreneurs. The second component will include resources to cofinance with other financial agents the basic infrastructure for the internal public services of the Tela Bay project, and investments in the area of influence to guarantee the environmental and social sustainability of this project. The third component will finance five subcomponents: (access infrastructure ¿airport and roads¿basic services, archeological restoration, rehabilitation of the Omoa Fortress and facilitation of migration), identified and designed in the framework of the Regional Mundo Maya Program.
El Programa tiene como objetivo: consolidar y diversificar la oferta de productos turísticos que sean compatibles con un modelo de turismo sostenible, buscando simultáneamente aumentar la interconexión entre los diversos circuitos turísticos existentes y proyectados, con miras a mejorar el posicionamiento de Honduras en el mercado regional centroamericano e internacional. Para alcanzar este objetivo será necesario que el gobierno trabaje en dos frentes interrelacionados: de un lado, la creación/protección de bienes públicos claves para el sector (patrimonio natural y cultural/histórico) y el mejoramiento de los servicios públicos básicos, y de otro lado, la catalización de la inversión privada para convertirla en el principal motor del desarrollo sectorial.
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
Fund for Special Operations
INSTITUTO HONDURENO DE TURISMO
INSTITUTO HONDURENO DE TURISMO
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SUSTAINABLE TOURISM
TURISMO SOSTENIBLE
1000000
Disbursement in forth quarter of 2005
20000
Disbursement in forth quarter of 2005
612499.91
Disbursement in first quarter of 2006
22000
Disbursement in first quarter of 2006
296026.65
Disbursement in second quarter of 2006
22000
Disbursement in second quarter of 2006
9458.41
Disbursement in third quarter of 2006
9443.71
Interest repayment in third quarter of 2006
206804.39
Disbursement in third quarter of 2006
22000
Disbursement in third quarter of 2006
203755.91
Disbursement in forth quarter of 2006
22000
Disbursement in forth quarter of 2006
11390.04
Disbursement in first quarter of 2007
11390.04
Interest repayment in first quarter of 2007
291963.86
Disbursement in first quarter of 2007
22000
Disbursement in first quarter of 2007
278438.32
Disbursement in second quarter of 2007
22000
Disbursement in second quarter of 2007
13906.82
Disbursement in third quarter of 2007
13906.82
Interest repayment in third quarter of 2007
2686603.58
Disbursement in third quarter of 2007
297219.77
Disbursement in third quarter of 2007
22000
Disbursement in third quarter of 2007
378684.47
Disbursement in forth quarter of 2007
467079.1
Disbursement in forth quarter of 2007
265862.91
Disbursement in forth quarter of 2007
22000
Disbursement in forth quarter of 2007
29964.16
Disbursement in first quarter of 2008
29964.16
Interest repayment in first quarter of 2008
192426.39
Disbursement in first quarter of 2008
114654.8
Disbursement in first quarter of 2008
22000
Disbursement in first quarter of 2008
78743.77
Disbursement in second quarter of 2008
181149.46
Disbursement in second quarter of 2008
196165.27
Disbursement in second quarter of 2008
22000
Disbursement in second quarter of 2008
42147
Disbursement in third quarter of 2008
42147
Interest repayment in third quarter of 2008
117781.51
Disbursement in third quarter of 2008
178140.88
Disbursement in third quarter of 2008
289722.66
Disbursement in third quarter of 2008
22000
Disbursement in third quarter of 2008
124192.11
Disbursement in forth quarter of 2008
187241.28
Disbursement in forth quarter of 2008
93597.24
Disbursement in forth quarter of 2008
256516.96
Disbursement in forth quarter of 2008
189492.62
Disbursement in forth quarter of 2008
22000
Disbursement in forth quarter of 2008
44082.48
Disbursement in first quarter of 2009
44082.48
Interest repayment in first quarter of 2009
334328.13
Disbursement in first quarter of 2009
310714.55
Disbursement in first quarter of 2009
271891.51
Disbursement in first quarter of 2009
22000
Disbursement in first quarter of 2009
543842.69
Disbursement in second quarter of 2009
479892.3
Disbursement in second quarter of 2009
173045.35
Disbursement in second quarter of 2009
466583.94
Disbursement in second quarter of 2009
198897.93
Disbursement in second quarter of 2009
22000
Disbursement in second quarter of 2009
53641.78
Disbursement in third quarter of 2009
53641.78
Interest repayment in third quarter of 2009
22000
Disbursement in third quarter of 2009
1375201.4
Disbursement in forth quarter of 2009
65409.31
Disbursement in first quarter of 2010
65409.31
Interest repayment in first quarter of 2010
312121
Disbursement in second quarter of 2010
171776.62
Disbursement in second quarter of 2010
176393.54
Disbursement in second quarter of 2010
65640.61
Disbursement in second quarter of 2010
928000
Disbursement in second quarter of 2010
53244.96
Interest repayment in third quarter of 2010
18089.48
Interest repayment in third quarter of 2010
1719678
Disbursement in third quarter of 2010
926611.38
Disbursement in third quarter of 2010
1247566
Disbursement in forth quarter of 2010
68832.7
Interest repayment in first quarter of 2011
19294.66
Interest repayment in first quarter of 2011
1019202.8
Disbursement in second quarter of 2011
80113.39
Interest repayment in third quarter of 2011
20083.72
Interest repayment in third quarter of 2011
3050000
Disbursement in forth quarter of 2011
92424.35
Interest repayment in forth quarter of 2011
18679.04
Interest repayment in first quarter of 2012
2573558
Disbursement in second quarter of 2012
102693.76
Interest repayment in third quarter of 2012
17373.44
Interest repayment in third quarter of 2012
8850000
Disbursement in forth quarter of 2012
128878.39
Interest repayment in first quarter of 2013
19205.08
Interest repayment in first quarter of 2013
207.56
Interest repayment in second quarter of 2013
.1
Interest repayment in second quarter of 2013
154243.34
Interest repayment in third quarter of 2013
18607.22
Interest repayment in third quarter of 2013
154781.65
Interest repayment in first quarter of 2014
19732.9
Interest repayment in first quarter of 2014
152583.41
Interest repayment in third quarter of 2014
19322.4
Interest repayment in third quarter of 2014
155213.73
Interest repayment in first quarter of 2015
16988.68
Interest repayment in first quarter of 2015
152238.34
Interest repayment in third quarter of 2015
15661.32
Interest repayment in third quarter of 2015
310031.77
Interest repayment in first quarter of 2016
512555.56
Loan repayment in first quarter of 2016
31154.13
Interest repayment in first quarter of 2016
51505.62
Loan repayment in first quarter of 2016
601286.5
Interest repayment in third quarter of 2016
1025887.55
Loan repayment in third quarter of 2016
30992.49
Interest repayment in third quarter of 2016
52823.19
Loan repayment in third quarter of 2016
298902.01
Interest repayment in first quarter of 2017
510710.98
Loan repayment in first quarter of 2017
29408.84
Interest repayment in first quarter of 2017
50400.46
Loan repayment in first quarter of 2017
289626.05
Interest repayment in third quarter of 2017
513697.69
Loan repayment in third quarter of 2017
30766.69
Interest repayment in third quarter of 2017
54408.14
Loan repayment in third quarter of 2017
3141761.3
Loan repayment in forth quarter of 2017
320980.91
Interest repayment in first quarter of 2018
568584.46
Loan repayment in first quarter of 2018
310191.49
Interest repayment in third quarter of 2018
568658.44
Loan repayment in third quarter of 2018
309537.14
Interest repayment in first quarter of 2019
568658.44
Loan repayment in first quarter of 2019
298911.8
Interest repayment in third quarter of 2019
568658.44
Loan repayment in third quarter of 2019
298101.83
Interest repayment in first quarter of 2020
568658.44
Loan repayment in first quarter of 2020
288431.02
Interest repayment in third quarter of 2020
568658.44
Loan repayment in third quarter of 2020
285912.73
Interest repayment in first quarter of 2021
568658.44
Loan repayment in first quarter of 2021
276352.42
Interest repayment in third quarter of 2021
568658.44
Loan repayment in third quarter of 2021
275199.52
Interest repayment in first quarter of 2022
568658.44
Loan repayment in first quarter of 2022
265041.57
Interest repayment in third quarter of 2022
568658.44
Loan repayment in third quarter of 2022
263732.88
Interest repayment in first quarter of 2023
568658.44
Loan repayment in first quarter of 2023
253730.71
Interest repayment in third quarter of 2023
568658.44
Loan repayment in third quarter of 2023
252208.85
Interest repayment in first quarter of 2024
568658.44
Loan repayment in first quarter of 2024
Report for Publication_PMR-_HO0195-2011-2º-Period [37298397].PDF
Rapport pour Publication_PMR-_HO0195-2011-2º-Período [37298010].PDF
Consulting Services [35236851].PDF
Rapport pour Publication_PMR-_HO0195-2010-2º-Período [36312196].PDF
Investigación y puesta en valor del sitio arqueologico de Rio Amarillo [35237577].PDF
HO0195 [36437986].PDF
Informe para Publicación_PMR-_HO0195-2012-1º-Periodo [37353524].PDF
Consulting Services [35237158].PDF
Programa Nacional de Turismo Sostenible [533957].PDF
Levantamiento de la Línea Base y Sis_ de Montioreo de las Áreas Protegidas [35237560].PDF
Investigación y Puesta en Valor del Sitio Arequeologico de Rio Amarillo [35237611].PDF
SUPERVISIÓN DE LA CONSTRUCCIÓN DE LAS OBRAS DEL PASEO MARÍTIMO DE TELA, ÁREAS B, C Y D [36230868].PDF
Rapport pour Publication_PMR-_HO0195-2012-1º-Período [37352866].PDF
Relatório para publicação_PMR-_HO0195-2010-2º-Período [36310295].PDF
CONSTRUCCION DEL AERÓDROMO EN CONCEPCIÓN, COPÁN [35238200].PDF
Informe para Publicación_PMR-_HO0195-2011-2º-Periodo [37298201].PDF
EVALUACIÓN DEL PROGRAMA NACIONAL DE TURISMO SOSTENIBLE [36029068].PDF
Des_ de un Plan Regional de Uso Publico y Mejora Ambiental de las Playas [35237173].PDF
Relatório para publicação_PMR-_HO0195-2012-1º-Período [37352203].PDF
Rapport pour Publication_PMR-_HO0195-2011-1º-Período [36624642].PDF
Informe para Publicación_PMR-_HO0195-2010-2º-Periodo [36312783].PDF
Report for Publication_PMR-_HO0195-2010-2º-Period [36313357].PDF
Informe para Publicación_PMR-_HO0195-2011-1º-Periodo [36625198].PDF
Obras de Infraestructura del Proyecto Bahía de Tela [35236499].PDF
Relatório para publicação_PMR-_HO0195-2011-2º-Período [37297818].PDF
General Procurement Notice [35236641].PDF
National Sustainable Tourism Program [533931].PDF
Consulting Services [35236800].PDF
Relatório para publicação_PMR-_HO0195-2011-1º-Período [36624062].PDF
Programa Nacional de Turismo Sostenible_ [37419651].PDF
Report for Publication_PMR-_HO0195-2011-1º-Period [36625759].PDF
Report for Publication_PMR-_HO0195-2012-1º-Period [37354187].PDF
XI-IATI-IADB-HO-L1105
Inter-American Development Bank
Program to Support the Social Inclusion Network with Priority in Western Honduras
Programa de Apoyo a la Red de Inclusión Social con Prioridad en Occidente
The program objective is to support human capital development through a comprehensive effort to alleviate poverty and improve access to health services in the poorest municipios of Honduras, giving priority to the municipios of western Honduras.
El objetivo del programa es apoyar al desarrollo de capital humano a través de una intervención integral de alivio de pobreza y mejoramiento del acceso a servicios de salud, en los municipios más pobres de Honduras, priorizando los municipios de Occidente.
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Asistencia técnica para el fortalecimiento de certificación de gestores de primer y segundo nivel Programa de Apoyo a la Red de Inclusión Social con Prioridad en Occidente, Honduras
16.281540014912, -93.416079968873
SOCIAL INVESTMENT
INVERSIONES SOCIALES
10000000
Disbursement in forth quarter of 2017
1000000
Disbursement in forth quarter of 2017
25691.72
Interest repayment in forth quarter of 2017
8000000
Disbursement in second quarter of 2018
121865.1
Interest repayment in second quarter of 2018
2200000
Disbursement in third quarter of 2018
5000000
Disbursement in forth quarter of 2018
7100000
Disbursement in forth quarter of 2018
216873.67
Interest repayment in forth quarter of 2018
3000000
Disbursement in second quarter of 2019
466252.47
Interest repayment in second quarter of 2019
6000000
Disbursement in forth quarter of 2019
2000000
Disbursement in forth quarter of 2019
477240.1
Interest repayment in forth quarter of 2019
515565.19
Interest repayment in second quarter of 2020
2900000
Disbursement in third quarter of 2020
493466.95
Interest repayment in forth quarter of 2020
2000000
Disbursement in first quarter of 2021
540332.54
Interest repayment in second quarter of 2021
800000
Disbursement in third quarter of 2021
554606.11
Interest repayment in forth quarter of 2021
563073.48
Interest repayment in second quarter of 2022
566167.29
Interest repayment in forth quarter of 2022
554900.75
Interest repayment in second quarter of 2023
621887.93
Loan repayment in second quarter of 2023
545301.01
Interest repayment in forth quarter of 2023
621887.93
Loan repayment in forth quarter of 2023
Programa de Apoyo a la Red de Inclusión Social con Prioridad en Occidente [40426068].PDF
HO-L1105 First period Jan-Jun 2021 - Public Report.pdf
Programa de Apoyo al Sistema de Proteccion Social I (HO-L1093) PCR Aprobado.pdf
HO-L1105 Second period Jan-Dec 2019-Public Report.pdf
Enlace _Estudio de Capacidad Institucional de SESAL_ [40222756].docx
Enlace _Estudio de Sostenibilidad Financiera_ [40222600].docx
HO-L1105 Second period Jan-Dec 2017-Public Report.pdf
Enlace _Ejemplos Manuales Operativos_ [40273065].docx
HO-L1105_0867_2_SP.pdf
HO-L1105_P673047_SP.pdf
Enlace _Manual de Indicadores_ [40273221].docx
HO-L1105_0867_4_SP.pdf
Enlace _Guía de estimación de costos en el Primer Nivel de Atención_ [40235116].PDF
HO-L1105_3047_4_SP.pdf
Enlace _Plan de Monitoreo y Evaluación_ [40236363].docx
HO-L1105 Second period Jan-Dec 2020 - Public Report.pdf
Enlace _Modificaciones a Convenios con Gestores Descentralizados_ [40272326].docx
Enlace _Manual Procedimientos Administrativos y Financieros_ [40269082].docx
HO-L1105 Second period Jan-Dec 2022 - Public Report.PDF
Program to Support the Social Inclusion Network with Priority in Western Honduras [40426081].PDF
Contrato - Programa de Apoyo a la Red de Inclusión Social con prioridad en Occidente.pdf
HO-L1105 First period Jan-Jun 2020 - Public Report.pdf
HO-L1105_3047_1_SP.pdf
HO-L1105 First period Jan-Jun 2019-Public Report.pdf
Enlace _Análisis Económico_ [40236271].docx
Enlace _Referencias_ [40273058].docx
HO-L1105 First period Jan-Jun 2018-Public Report.pdf
HO-L1105 Second period Jan-Dec 2018-Public Report.pdf
HO-L1105_3047_3_SP.pdf
HO-L1105 Second period Jan-Dec 2016-Public Report.pdf
HO-L1105 First period Jan-Jun 2017-Public Report.pdf
Enlace _Estudio de capacidad institucional Subsecretaria de Integración Social con metodología PACI_ [40222773].docx
HO-L1105_P700867_SP.pdf
Enlace _Diseño Preliminar Programa Graduación en Honduras_ [40222482].docx
Enlace _Lista preliminar de Municipios priorizados_ [40276507].docx
HO-L1105 Second period Jan-Dec 2021 - Public Report.PDF
Filtros ambientales [40395448].PDF
Plan de Adquisiciones [40222412].xlsx
Análisis Ambiental y Social [40188515].doc
Enlace _Propuesta de indicadores para el marco de desempelo_ [40235008].docx
HO-L1105 First period Jan-Jun 2022 - Public Report.PDF
HO-L1105_3047_2_SP.pdf
COMPONENTE 1. Alivio de la pobreza e inversión en capital Humano.
COMPONENTE 1. Alivio de la pobreza e inversión en capital Humano.
Número de personas en hogares que reciben transferencias monetarias condicionadas
Número de personas en hogares que reciben transferencias monetarias condicionadas
Numero de consultorias para el fortalecimiento de la operatividad de la SSIS
Numero de consultorias para el fortalecimiento de la operatividad de la SSIS
Número de hogares que se incorporan al piloto de graduación.
Número de hogares que se incorporan al piloto de graduación.
Número de fichas socioeconomicas unicas levantadas
Número de fichas socioeconomicas unicas levantadas
Número de personas en hogares que reciben transferencias monetarias condicionadas
Número de personas en hogares que reciben transferencias monetarias condicionadas
COMPONENTE 2. Fortalecimiento de la oferta de servicios de salud.
COMPONENTE 2. Fortalecimiento de la oferta de servicios de salud.
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Talleres para el fortalecimiento de las intervenciones en salud en los gestores de la Iniciativa de Salud Mesoamérica
Talleres para el fortalecimiento de las intervenciones en salud en los gestores de la Iniciativa de Salud Mesoamérica
Consultorias para Fortalecimiento Hospitalario.
Consultorias para Fortalecimiento Hospitalario.
Talleres para el fortalecimiento de las intervenciones en salud en los gestores de la Iniciativa de Salud Mesoamérica
Talleres para el fortalecimiento de las intervenciones en salud en los gestores de la Iniciativa de Salud Mesoamérica
Número de convenios de gestión firmados con gestores de segundo nivel.
Número de convenios de gestión firmados con gestores de segundo nivel.
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Consultorías para el fortalecimiento institucional de la SESAL.
Consultorías para el fortalecimiento institucional de la SESAL.
Número de convenios de gestión firmados con gestores de segundo nivel.
Número de convenios de gestión firmados con gestores de segundo nivel.
Asistencia técnica para el fortalecimiento de certificación de gestores de primer y segundo nivel
Asistencia técnica para el fortalecimiento de certificación de gestores de primer y segundo nivel
Convenios de Gestión firmados con Comités de Apoyo.
Convenios de Gestión firmados con Comités de Apoyo.
Convenios de Gestión firmados con Comités de Apoyo.
Convenios de Gestión firmados con Comités de Apoyo.
Equipamiento para establecimientos de salud y hospitales
Equipamiento para establecimientos de salud y hospitales
Consultorías para el fortalecimiento institucional de la SESAL.
Consultorías para el fortalecimiento institucional de la SESAL.
Número de convenios de gestión firmados con gestores de segundo nivel.
Número de convenios de gestión firmados con gestores de segundo nivel.
Consultorías para el fortalecimiento institucional de la SESAL.
Consultorías para el fortalecimiento institucional de la SESAL.
Establecimientos de salud abastecidos con micronutrientes en polvo.
Establecimientos de salud abastecidos con micronutrientes en polvo.
Taller de alto nivel para análisis del sistema de salud del Conjunto Garantizado de Servicios de Salud
Taller de alto nivel para análisis del sistema de salud del Conjunto Garantizado de Servicios de Salud
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Personas cubiertas por gestores descentralizados priorizando los 33 municipios seleccionados.
Equipamiento para establecimientos de salud y hospitales
Equipamiento para establecimientos de salud y hospitales
XI-IATI-IADB-HO0224
Inter-American Development Bank
PPP Support to Rural Electrification and to the Energy Sector
PPP Apoyo a la Electrificación Rural y al Sector de Energía
The project general objective is the improvemment of life conditions for the poorest population and to enhance the competitiveness of Honduras. Specific objectives are: the adaptation of enegy subtransmission systems to allow the rural electrification expansion, reduction of operational costs of the interconnected electric system and its compliance with the Electric Regional Market (MER), currently being developed with the support of the Plan Puebla Panama.
El proyecto tiene como objetivo general el de mejorar las condiciones de vida de la población más pobre y hacer más competitiva la economía hondureña. Los objetivos específicos del proyecto son la adecuación de los sistemas de subtransmisión de energía para permitir la ampliación de la cobertura de la electrificación rural, la reducción de costos de operar el sistema eléctrico interconectado y su adecuación a los requerimientos del Mercado Eléctrico Regional (MER), cuyo desarrollo se viene apoyando en el marco del Plan Puebla Panamá.
Fund for Special Operations
EMPRESA NACIONAL DE ENERGIA ELECTRICA
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Abonados en el área de influencia del Proyecto, conectados a la red de acuerdo con las Normas Técnicas. PPP Apoyo a la Electrificación Rural y al Sector de Energía, Honduras
31.86432, -87.73861
ENERGY
ENERGIA
14000
Disbursement in first quarter of 2006
21000
Disbursement in second quarter of 2006
21000
Disbursement in third quarter of 2006
129.83
Disbursement in forth quarter of 2006
129.83
Interest repayment in forth quarter of 2006
300000
Disbursement in forth quarter of 2006
21000
Disbursement in forth quarter of 2006
21000
Disbursement in first quarter of 2007
1457.53
Disbursement in second quarter of 2007
1457.53
Interest repayment in second quarter of 2007
12950.22
Disbursement in second quarter of 2007
12700
Disbursement in third quarter of 2007
4085.14
Disbursement in forth quarter of 2007
4085.14
Interest repayment in forth quarter of 2007
12700
Disbursement in forth quarter of 2007
12700
Disbursement in first quarter of 2008
2175.6
Disbursement in second quarter of 2008
2175.6
Interest repayment in second quarter of 2008
550000
Disbursement in second quarter of 2008
12700
Disbursement in second quarter of 2008
12700
Disbursement in third quarter of 2008
3964.07
Disbursement in forth quarter of 2008
3964.07
Interest repayment in forth quarter of 2008
808178.95
Disbursement in forth quarter of 2008
12700
Disbursement in forth quarter of 2008
12700
Disbursement in first quarter of 2009
7532.88
Disbursement in second quarter of 2009
7532.88
Interest repayment in second quarter of 2009
12700
Disbursement in second quarter of 2009
12700
Disbursement in third quarter of 2009
9439.24
Disbursement in forth quarter of 2009
9439.24
Interest repayment in forth quarter of 2009
12700
Disbursement in forth quarter of 2009
12700
Disbursement in first quarter of 2010
9560.88
Disbursement in second quarter of 2010
9560.88
Interest repayment in second quarter of 2010
843003.23
Disbursement in second quarter of 2010
867531.16
Disbursement in second quarter of 2010
903783.29
Disbursement in second quarter of 2010
126433.2
Disbursement in third quarter of 2010
244638.37
Disbursement in third quarter of 2010
19779.77
Disbursement in forth quarter of 2010
19779.77
Interest repayment in forth quarter of 2010
1718591.23
Disbursement in forth quarter of 2010
3299577.46
Disbursement in first quarter of 2011
30239.68
Disbursement in second quarter of 2011
30239.68
Interest repayment in second quarter of 2011
4710000
Disbursement in forth quarter of 2011
50944.1
Disbursement in forth quarter of 2011
50944.1
Interest repayment in forth quarter of 2011
74409.44
Disbursement in second quarter of 2012
74409.44
Interest repayment in second quarter of 2012
3902595
Disbursement in second quarter of 2012
3462884.34
Disbursement in third quarter of 2012
100198.16
Disbursement in forth quarter of 2012
100198.16
Interest repayment in forth quarter of 2012
2477155.96
Disbursement in forth quarter of 2012
122099.61
Disbursement in second quarter of 2013
122099.61
Interest repayment in second quarter of 2013
124836.06
Disbursement in forth quarter of 2013
124836.06
Interest repayment in forth quarter of 2013
124776.37
Interest repayment in second quarter of 2014
125461.95
Interest repayment in forth quarter of 2014
124776.37
Interest repayment in second quarter of 2015
250923.9
Interest repayment in forth quarter of 2015
417063.86
Loan repayment in forth quarter of 2015
246361.65
Interest repayment in second quarter of 2016
417063.86
Loan repayment in second quarter of 2016
241897.04
Interest repayment in forth quarter of 2016
417063.86
Loan repayment in forth quarter of 2016
236700.65
Interest repayment in second quarter of 2017
417063.86
Loan repayment in second quarter of 2017
234195.64
Interest repayment in forth quarter of 2017
417063.86
Loan repayment in forth quarter of 2017
228642.41
Interest repayment in second quarter of 2018
417063.86
Loan repayment in second quarter of 2018
225808.66
Interest repayment in forth quarter of 2018
417063.86
Loan repayment in forth quarter of 2018
220301.14
Interest repayment in second quarter of 2019
417063.86
Loan repayment in second quarter of 2019
217421.67
Interest repayment in forth quarter of 2019
417063.86
Loan repayment in forth quarter of 2019
212976.43
Interest repayment in second quarter of 2020
417063.86
Loan repayment in second quarter of 2020
208531.93
Interest repayment in forth quarter of 2020
417063.86
Loan repayment in forth quarter of 2020
203538.28
Interest repayment in second quarter of 2021
417063.86
Loan repayment in second quarter of 2021
200739.12
Interest repayment in forth quarter of 2021
417063.86
Loan repayment in forth quarter of 2021
195437.27
Interest repayment in second quarter of 2022
417063.86
Loan repayment in second quarter of 2022
192374.99
Interest repayment in forth quarter of 2022
417063.86
Loan repayment in forth quarter of 2022
187095.99
Interest repayment in second quarter of 2023
417063.86
Loan repayment in second quarter of 2023
183919.45
Interest repayment in forth quarter of 2023
417063.86
Loan repayment in forth quarter of 2023
Informe para Publicación_PMR-_HO0224-2011-2º-Periodo [37298208].PDF
Constr_ de Lineas de Subtransmisión y Sistemas de Distribución Electrica [35237307].PDF
Informe para Publicación_PMR-_HO0224-2011-1º-Periodo [36625206].PDF
ADQUISICIÓN DE EQUIPO ESPECIALIZADO DE MEDICION [35238186].PDF
PPP-Rural Electrification and the Energy Sector [421673].PDF
Relatório para publicação_PMR-_HO0224-2012-2º-Período [37873313].PDF
CONSTRUCCIÓN DE LÍNEAS DE TRANSMISIÓN EN 138 Y 69 KV, Y AMPLIACI [35237931].PDF
Adquisicion de Vehiculos de Trabajo [35237310].PDF
General Procurement Notice [35236373].PDF
ELECTRIFICACIÓN DE LAS COLONIAS SUBNORMALES [35238350].PDF
Apoyo a la Electrificación Rural y al Sector de Energía [421426].PDF
Rapport pour Publication_PMR-_HO0224-2012-1º-Período [37352869].PDF
Report for Publication_PMR-_HO0224-2013-1º-Period [38267538].PDF
Rapport pour Publication_PMR-_HO0224-2011-2º-Período [37298017].PDF
Rapport pour Publication_PMR-_HO0224-2010-2º-Período [36312208].PDF
Informe para Publicación_PMR-_HO0224-2012-1º-Periodo [37353527].PDF
Report for Publication_PMR-_HO0224-2012-1º-Period [37354190].PDF
Report for Publication_PMR-_HO0224-2010-2º-Period [36313369].PDF
Relatório para publicação_PMR-_HO0224-2011-2º-Período [37297826].PDF
Informe para Publicación_PMR-_HO0224-2013-1º-Periodo [38266864].PDF
Suministro e Instalación de Sistema de Comunicaciones [35237455].PDF
Report for Publication_PMR-_HO0224-2012-2º-Period [37875469].PDF
CONSTRUCCIÓN DE LÍNEA DE SUBTRANSMISIÓN 34_5 KV DESDE LA SUBE [35238197].PDF
Relatório para publicação_PMR-_HO0224-2010-2º-Período [36310306].PDF
Informe para Publicación_PMR-_HO0224-2012-2º-Periodo [37874640].PDF
Informe para Publicación_PMR-_HO0224-2010-2º-Periodo [36312794].PDF
Rapport pour Publication_PMR-_HO0224-2011-1º-Período [36624650].PDF
ADQUISICIÓN DEL SCADA_EMS DEL CENTRO NACIONAL DE DESPACHO (CN [35238538].PDF
Rapport pour Publication_PMR-_HO0224-2013-1º-Período [38266200].PDF
Relatório para publicação_PMR-_HO0224-2011-1º-Período [36624071].PDF
Programa de apoyo a la electrificación rural y al sector de energía [534474].PDF
Rapport pour Publication_PMR-_HO0224-2012-2º-Período [37873980].PDF
Relatório para publicação_PMR-_HO0224-2013-1º-Período [38265535].PDF
Suministro e Instalación de Sistema SCADA-EMS [35237467].PDF
Relatório para publicação_PMR-_HO0224-2012-1º-Período [37352206].PDF
CONSTRUCCIÓN DE LÍNEAS DE TRANSMISIÓN Y AMPLIACIÓN SUBESTACIONES H (POWER) [35282121].PDF
Adquisición de 44 Vehículos de Trabajo [35237569].PDF
ADQUISICIÓN DE EQUIPOS DE MEDICION [35237663].PDF
Report for Publication_PMR-_HO0224-2011-1º-Period [36625768].PDF
ADQUISICION DE HERRAMIENTAS [35237662].PDF
Report for Publication_PMR-_HO0224-2011-2º-Period [37298404].PDF
CONSULTORÍA INDIVIDUAL PARA LA SUPERVISIÓN DEL SCADA_EMS Power [35542285].PDF
Electrificación rural ampliada y mejorada.
Electrificación rural ampliada y mejorada.
Líneas de subtransmisión de energía a 34.5 kV construidas y operando de acuerdo con la Norma de Construcción de la ENEE.
Líneas de subtransmisión de energía a 34.5 kV construidas y operando de acuerdo con la Norma de Construcción de la ENEE.
Abonados en el área de influencia del Proyecto, conectados a la red de acuerdo con las Normas Técnicas.
Abonados en el área de influencia del Proyecto, conectados a la red de acuerdo con las Normas Técnicas.
Subestaciones de 69/34.5 kV con una capacidad de 12.5 MVA c/u instaladas en Erandique y Chichicaste.
Subestaciones de 69/34.5 kV con una capacidad de 12.5 MVA c/u instaladas en Erandique y Chichicaste.
Empresa Nacional de Energía Eléctrica operativamente fortalecida.
Empresa Nacional de Energía Eléctrica operativamente fortalecida.
Unidad de Control e Investigación de pérdidas equipada de acuerdo a requerimientos establecidos en el plan de reducción de pérdidas.
Unidad de Control e Investigación de pérdidas equipada de acuerdo a requerimientos establecidos en el plan de reducción de pérdidas.
Usuarios ilegales en colonias subnormales conectados a la red.
Usuarios ilegales en colonias subnormales conectados a la red.
Usuarios ilegales en colonias subnormales conectados a la red.
Usuarios ilegales en colonias subnormales conectados a la red.
Subestación de Naco 138/69 kV con capacidad de 50 MVA construida y en operación y subestación San Pedro Sula Sur ampliada
Subestación de Naco 138/69 kV con capacidad de 50 MVA construida y en operación y subestación San Pedro Sula Sur ampliada
XI-IATI-IADB-HO-L1070
Inter-American Development Bank
Programmatic Support to the Power Sector Reforms Agenda
Apoyo Programático a la Agenda de Reformas del Sector Eléctrico
The objective of the program is to support the GoH in the implementation of the reform and sector policies, required to improve the financial sustainability, operational efficiency and energy sufficiency. The specific objectives are i) to strengthen the institutional capacity and the regulatory framework: ii) to improve the financial sustainability; and iii) to adopt energy policies to guarantee the energy security.
El objetivo del programa es apoyar al GdH en la implementación de las reformas y políticas sectoriales necesarias para mejorar la sostenibilidad financiera, la eficiencia operativa y el suministro energético. Los objetivos específicos son: (i) fortalecer la capacidad institucional y el marco regulatorio sectorial; (ii) mejorar la sostenibilidad financiera; y (iii) adoptar políticas energéticas orientadas a garantizar la seguridad del suministro eléctrico.
BLENDED LOANS
SECRETARIA DE FINANZAS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Autoridad superior del Subsector designada Apoyo Programático a la Agenda de Reformas del Sector Eléctrico, Honduras
14.824173968, -86.600264243
ENERGY
ENERGIA
39000000
Disbursement in forth quarter of 2014
91000000
Disbursement in forth quarter of 2014
47280.82
Interest repayment in second quarter of 2015
1394753.27
Interest repayment in second quarter of 2015
48883.56
Interest repayment in forth quarter of 2015
1586825.59
Interest repayment in forth quarter of 2015
48760.95
Interest repayment in second quarter of 2016
1845778.77
Interest repayment in second quarter of 2016
48750
Interest repayment in forth quarter of 2016
1718990
Interest repayment in forth quarter of 2016
1637593.05
Interest repayment in second quarter of 2017
1635709.15
Interest repayment in forth quarter of 2017
1605953.04
Interest repayment in second quarter of 2018
1612896.82
Interest repayment in forth quarter of 2018
1604083.18
Interest repayment in second quarter of 2019
1612896.82
Interest repayment in forth quarter of 2019
1608851.22
Interest repayment in second quarter of 2020
1608490
Interest repayment in forth quarter of 2020
1895833.33
Loan repayment in forth quarter of 2020
1612091.91
Interest repayment in second quarter of 2021
1895833.33
Loan repayment in second quarter of 2021
1591453.23
Interest repayment in forth quarter of 2021
1895833.33
Loan repayment in forth quarter of 2021
1549405.89
Interest repayment in second quarter of 2022
1895833.33
Loan repayment in second quarter of 2022
1524384.98
Interest repayment in forth quarter of 2022
1895833.33
Loan repayment in forth quarter of 2022
1463871.61
Interest repayment in second quarter of 2023
1895833.33
Loan repayment in second quarter of 2023
1437175.3
Interest repayment in forth quarter of 2023
1895833.33
Loan repayment in forth quarter of 2023
HO-L1070 Analisis Integracion Regional [39179692].doc
HO-L1070 Análisis del Cumplimiento de la Política de Servicios Públicos [39158213].doc
HO-L1070 Evaluación Económica [39162844].docx
Contrato - Apoyo Programático a Reformas Estructurales del Sector Eléctrico [39313232].PDF
Honduras__Propuesta_de_Prestamo_para_el_proyecto_Apoyo_Programatico a_Reformas_Estructurales_del_Sector Electric [39269784].PDF
HO-L1070 Matriz de resultados [39157587].docx
Evaluación de Riesgos Financieros - Sector Eléctrico - Honduras [39165917].docx
HO-L1070 Plan de Seguimiento y Evaluacion [39140940].docx
Honduras Proposal for a loan for the project Programmatic Support for Structural Reforms in the Electric Sector [39269790].PDF
HO-L1070 Matriz de Medios de Verificación [39093742].doc
XI-IATI-IADB-HO0207
Inter-American Development Bank
Improvement of the PPP Atlantic Corridor (Sections of the CA-5 North Highway)
Mejoramiento del Corredor Atlántico del PPP (Tramos de la CA-5 Norte)
The general objective of the project is to improve Honduras competitiveness and to support the highway integration process with the countries of the Plan Puebla Panamá. The specific objectives are the improvement of transport conditions for passengers and cargo through the North Highway CA-5 and the facilitation of commerce among the countries connected by the Atlantic Corredor of the Plan Puebla Panama.
El proyecto tiene como objetivo general el de mejorar la competitividad de Honduras y apoyar el proceso de integración vial con los países del Plan Puebla Panamá (PPP). Los objetivos específicos del proyecto son el mejoramiento de las condiciones del transporte de personas y mercancías en la carretera del Norte CA-5 y facilitar el comercio por vía terrestre entre los países que se conectan mediante el corredor del Atlántico del PPP (Honduras, México, Belice, Guatemala y El Salvador).
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
Fund for Special Operations
Fund for Special Operations
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Carretera CA-1 con señalización horizontal y vertical Mejoramiento del Corredor Atlántico del PPP (Tramos de la CA-5 Norte), Honduras
15.23333, -87.13333
TRANSPORT
TRANSPORTE
32000
Disbursement in second quarter of 2005
250000
Disbursement in third quarter of 2005
249352.02
Disbursement in third quarter of 2005
162020.92
Disbursement in third quarter of 2005
67.51
Interest repayment in third quarter of 2005
36000
Disbursement in third quarter of 2005
36000
Disbursement in forth quarter of 2005
4319.53
Interest repayment in first quarter of 2006
72859.25
Disbursement in first quarter of 2006
36000
Disbursement in first quarter of 2006
36000
Disbursement in second quarter of 2006
4437.32
Interest repayment in third quarter of 2006
143539.74
Disbursement in third quarter of 2006
36000
Disbursement in third quarter of 2006
2308119.27
Disbursement in forth quarter of 2006
57618.69
Disbursement in forth quarter of 2006
36000
Disbursement in forth quarter of 2006
25192.49
Interest repayment in first quarter of 2007
36000
Disbursement in first quarter of 2007
36000
Disbursement in second quarter of 2007
17842.69
Interest repayment in third quarter of 2007
36000
Disbursement in third quarter of 2007
158131.68
Disbursement in forth quarter of 2007
791039.44
Disbursement in forth quarter of 2007
36000
Disbursement in forth quarter of 2007
2333008.85
Disbursement in first quarter of 2008
20309.44
Interest repayment in first quarter of 2008
36000
Disbursement in first quarter of 2008
1716676.1
Disbursement in second quarter of 2008
489940.85
Disbursement in second quarter of 2008
653272.33
Disbursement in second quarter of 2008
36000
Disbursement in second quarter of 2008
1020674.67
Disbursement in third quarter of 2008
1558477.41
Disbursement in third quarter of 2008
218040.13
Disbursement in third quarter of 2008
554816.54
Disbursement in third quarter of 2008
45427.01
Interest repayment in third quarter of 2008
36000
Disbursement in third quarter of 2008
469108.13
Disbursement in forth quarter of 2008
586349.26
Disbursement in forth quarter of 2008
890319.41
Disbursement in forth quarter of 2008
1037256.39
Disbursement in forth quarter of 2008
1098603.64
Disbursement in forth quarter of 2008
2164454.88
Disbursement in forth quarter of 2008
201688.85
Disbursement in forth quarter of 2008
1198316.31
Disbursement in forth quarter of 2008
174776.91
Disbursement in forth quarter of 2008
1098603.64
Disbursement in forth quarter of 2008
1001988.11
Disbursement in first quarter of 2009
862255.57
Disbursement in first quarter of 2009
91625.82
Interest repayment in first quarter of 2009
924585.8
Disbursement in first quarter of 2009
912106.95
Disbursement in second quarter of 2009
1168187.47
Disbursement in second quarter of 2009
221405.21
Disbursement in second quarter of 2009
780315.9
Disbursement in second quarter of 2009
675426.25
Disbursement in second quarter of 2009
701032.89
Disbursement in second quarter of 2009
135104.13
Interest repayment in third quarter of 2009
1001988.11
Disbursement in forth quarter of 2009
268851.4
Disbursement in first quarter of 2010
236330.4
Disbursement in first quarter of 2010
198218.03
Interest repayment in first quarter of 2010
2306868.1
Disbursement in second quarter of 2010
2179769.2
Disbursement in second quarter of 2010
115884.33
Disbursement in third quarter of 2010
202110.11
Interest repayment in third quarter of 2010
69206.71
Disbursement in third quarter of 2010
919586.42
Disbursement in forth quarter of 2010
173216.3
Interest repayment in first quarter of 2011
1914888.49
Disbursement in third quarter of 2011
4703557.22
Disbursement in third quarter of 2011
181833.83
Interest repayment in third quarter of 2011
5589812.25
Disbursement in first quarter of 2012
210078.24
Interest repayment in first quarter of 2012
240585.25
Interest repayment in third quarter of 2012
2287491.55
Disbursement in forth quarter of 2012
245358.41
Interest repayment in first quarter of 2013
100000
Disbursement in second quarter of 2013
251863.01
Interest repayment in third quarter of 2013
247940.91
Interest repayment in first quarter of 2014
252046.8
Interest repayment in third quarter of 2014
495874.68
Interest repayment in first quarter of 2015
833306.9
Loan repayment in first quarter of 2015
495600.72
Interest repayment in third quarter of 2015
833306.9
Loan repayment in third quarter of 2015
481412.73
Interest repayment in first quarter of 2016
833306.9
Loan repayment in first quarter of 2016
477580.48
Interest repayment in third quarter of 2016
833306.9
Loan repayment in third quarter of 2016
462016.31
Interest repayment in first quarter of 2017
833306.9
Loan repayment in first quarter of 2017
462085.8
Interest repayment in third quarter of 2017
833306.9
Loan repayment in third quarter of 2017
446241.55
Interest repayment in first quarter of 2018
833306.9
Loan repayment in first quarter of 2018
445282.68
Interest repayment in third quarter of 2018
833306.9
Loan repayment in third quarter of 2018
429712.39
Interest repayment in first quarter of 2019
833306.9
Loan repayment in first quarter of 2019
428479.56
Interest repayment in third quarter of 2019
833306.9
Loan repayment in third quarter of 2019
414959.02
Interest repayment in first quarter of 2020
833306.9
Loan repayment in first quarter of 2020
410460.57
Interest repayment in third quarter of 2020
833306.9
Loan repayment in third quarter of 2020
396007.47
Interest repayment in first quarter of 2021
833306.9
Loan repayment in first quarter of 2021
394873.32
Interest repayment in third quarter of 2021
833306.9
Loan repayment in third quarter of 2021
380124.93
Interest repayment in first quarter of 2022
833306.9
Loan repayment in first quarter of 2022
378070.2
Interest repayment in third quarter of 2022
833306.9
Loan repayment in third quarter of 2022
363595.77
Interest repayment in first quarter of 2023
833306.9
Loan repayment in first quarter of 2023
361267.08
Interest repayment in third quarter of 2023
833306.9
Loan repayment in third quarter of 2023
348596.62
Interest repayment in first quarter of 2024
833306.9
Loan repayment in first quarter of 2024
Improvement of the Puebla-Panama Plan's Atlantic Corridor [416299].PDF
Rapport pour Publication_PMR-_HO0207-2011-1º-Período [36624646].PDF
Relatório para publicação_PMR-_HO0207-2012-2º-Período [37873312].PDF
Rapport pour Publication_PMR-_HO0207-2011-2º-Período [37298014].PDF
Informe para Publicación_PMR-_HO0207-2011-2º-Periodo [37298205].PDF
HO0207 Second period Jan-Dec 2013-Public Report [40174711].PDF
Relatório para publicação_PMR-_HO0207-2010-2º-Período [36310300].PDF
Honduras. HO0207. programa de Mejoramiento del Corredor Atlántico del Plan Puebla Panamá (Tramos de la carretera CA-5 Norte)_PCR.pdf
Consulting Services [35236415].PDF
Informe para Publicación_PMR-_HO0207-2012-2º-Periodo [37874639].PDF
Report for Publication_PMR-_HO0207-2011-1º-Period [36625763].PDF
Rapport pour Publication_PMR-_HO0207-2013-1º-Período [38266199].PDF
Programa de mejoramiento del corredor atlántico del PPP (tramos de la ca-5 norte) [534493].PDF
Consulting Services [35236519].PDF
Rapport pour Publication_PMR-_HO0207-2010-2º-Período [36312201].PDF
Relatório para publicação_PMR-_HO0207-2011-2º-Período [37297822].PDF
Report for Publication_PMR-_HO0207-2013-1º-Period [38267537].PDF
Report for Publication_PMR-_HO0207-2011-2º-Period [37298401].PDF
Contratación de Servicios de Construcción [35236154].PDF
General Procurement Notice [35236297].PDF
contratación de Servicios de Consultoría [35236155].PDF
Report for Publication_PMR-_HO0207-2012-2º-Period [37875468].PDF
Informe para Publicación_PMR-_HO0207-2010-2º-Periodo [36312788].PDF
Consulting Services [35236139].PDF
Relatório para publicação_PMR-_HO0207-2011-1º-Período [36624067].PDF
Consulting Services [35236318].PDF
Informe para Publicación_PMR-_HO0207-2013-1º-Periodo [38266863].PDF
HO0207 First period Jan-Jun 2014-Public Report [40182060].PDF
Relatório para publicação_PMR-_HO0207-2013-1º-Período [38265534].PDF
Informe para Publicación_PMR-_HO0207-2011-1º-Periodo [36625202].PDF
Rapport pour Publication_PMR-_HO0207-2012-2º-Período [37873979].PDF
HO0207 Second period Jan-Dec 2014-Public Report [40185547].PDF
Report for Publication_PMR-_HO0207-2010-2º-Period [36313363].PDF
HO0207 First period Jan-Jun 2015-Public Report [40192135].PDF
Componente 1: Ampliación y Rehabilitación de la Carretera CA-5 Norte
Componente 1: Ampliación y Rehabilitación de la Carretera CA-5 Norte
Supervisión Sección I realizada.
Supervisión Sección I realizada.
Supervisión Sección IV realizada.
Supervisión Sección IV realizada.
Diseño puntos crìticos vía del PPP realizado.
Diseño puntos crìticos vía del PPP realizado.
Supervisión Sección III realizada.
Supervisión Sección III realizada.
Supervisión Sección II realizada.
Supervisión Sección II realizada.
Supervisión señalización vías del PPP, tramo CA-1 realizada.
Supervisión señalización vías del PPP, tramo CA-1 realizada.
Componente 2: Mejora de la Seguridad vial del Sistema de Carretera proyecto Mesoamérica (antes ppp)
Componente 2: Mejora de la Seguridad vial del Sistema de Carretera proyecto Mesoamérica (antes ppp)
Seccion II carretera CA-5 Norte construida.
Seccion II carretera CA-5 Norte construida.
Carretera CA-1 con señalización horizontal y vertical
Carretera CA-1 con señalización horizontal y vertical
XI-IATI-IADB-HO-L1194
Inter-American Development Bank
Support for the Comprehensive Social Protection System
Apoyo al Sistema Integral de Protección Social
The objective of the project is to improve the living conditions of households living in extreme poverty as well as to promote their generation of human capital. The specific objectives are: (i) increase the minimum income of participating households; (ii) increase the use of educational services and strengthen basic education, prioritizing the third cycle; (iii) increase the use and supply of health and nutrition services of the participating households, especially women, youth and children; and (iv) improve the pertinence, targeting and articulation of interventions for the social protection and inclusion of households in extreme poverty.
El objetivo del programa es mejorar las condiciones de vida de los hogares en situación de pobreza extrema, así como promover su generación de capital humano. Los objetivos específicos son: (i) aumentar el ingreso mínimo de los hogares participantes; (ii) aumentar el uso y la oferta de servicios educativos, priorizando el tercer ciclo; (iii) mejorar el uso y la oferta de servicios de salud y nutrición, en especial para las mujeres, jóvenes y niños; y (iv) mejorar la pertinencia, focalización y articulación de las acciones de protección e inclusión social para los hogares en extrema pobreza.
PROGRAMA DE LA RED SOLIDARIA
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Estructura de gestión y operativa del PRS a nivel central implementado Apoyo al Sistema Integral de Protección Social, Honduras
34.22482, -87.00917
SOCIAL INVESTMENT
INVERSIONES SOCIALES
831760.0
795648.0
758944.0
723424.0
686720.0
651792.0
617456.0
583712.0
551152.0
519184.0
488400.0
459984.0
430976.0
404336.0
378880.0
354608.0
331520.0
309616.0
288896.0
269360.0
250416.0
233840.0
2874376.0
9535000
Disbursement in forth quarter of 2020
11273.25
Interest repayment in first quarter of 2021
1000000
Disbursement in first quarter of 2021
30525.59
Interest repayment in third quarter of 2021
28120000
Disbursement in third quarter of 2021
89088.8
Interest repayment in first quarter of 2022
141554.9
Interest repayment in third quarter of 2022
335324.85
Interest repayment in first quarter of 2023
448670.7
Interest repayment in third quarter of 2023
6750000
Disbursement in forth quarter of 2023
521225.35
Interest repayment in first quarter of 2024
HO-L1194_P779672_GN.pdf
Honduras. Loan proposal for the project _Support for the Comprehensive Social Protection System”.pdf
HO-L1194 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1194_P2049388_SP.pdf
HO-L1194 First period Jan-Jun 2022 - Public Report.PDF
HO-L1194_P756886_SP.pdf
HO-L1194_P2089551_SP.pdf
HO-L1194_P2046460_SP.pdf
Contrato Modificatorio - Programa de Apoyo al Sistema Integral de Protección Social.pdf
HO-L1194 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1194_P905945_SP.pdf
HO-L1194 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1194 First period Jan-Jun 2023 - Public Report.PDF
HO-L1194 First period Jan-Jun 2020 - Public Report.pdf
HO-L1194_P2049932_SP.pdf
HO-L1194_P2048334_SP.pdf
HO-L1194_P979628_SP.pdf
HO-L1194 First period Jan-Jun 2021 - Public Report.pdf
Honduras. Propuesta de préstamo para el proyecto de _Apoyo al Sistema Integral de Protección Social”.pdf
HO-L1194_6886_1_SP.pdf
Fortalecimiento de la Oferta y Calidad de Servicios de Salud, Priorizando los servicios materno infantil (MGD)
Fortalecimiento de la Oferta y Calidad de Servicios de Salud, Priorizando los servicios materno infantil (MGD)
Unidad de gestion descentralizada (UGD), fortalecida para el monitoreo , evaluaci;on y administratcion del programa
Unidad de gestion descentralizada (UGD), fortalecida para el monitoreo , evaluaci;on y administratcion del programa
Unidad de gestion descentralizada (UGD), fortalecida para el monitoreo , evaluaci;on y administratcion del programa
Unidad de gestion descentralizada (UGD), fortalecida para el monitoreo , evaluaci;on y administratcion del programa
Municipios con Equipos de Salud Familiar (ESFAM) fortalecidos en temas de AINC, Criando con amor e Interculturalidad
Municipios con Equipos de Salud Familiar (ESFAM) fortalecidos en temas de AINC, Criando con amor e Interculturalidad
Personas cubiertas por gestores descentralizados en primer nivel de atención en municipios más pobres
Personas cubiertas por gestores descentralizados en primer nivel de atención en municipios más pobres
Municipios con Equipos de Salud Familiar (ESFAM) fortalecidos en temas de AINC, Criando con amor e Interculturalidad
Municipios con Equipos de Salud Familiar (ESFAM) fortalecidos en temas de AINC, Criando con amor e Interculturalidad
Fortalecimiento de la oferta de los servicios educativos, priorizando el Tercer Ciclo
Fortalecimiento de la oferta de los servicios educativos, priorizando el Tercer Ciclo
Estudiantes matriculados en el Tercer Ciclo de Educación Básica a través de una modalidad alternativa
Estudiantes matriculados en el Tercer Ciclo de Educación Básica a través de una modalidad alternativa
Unidad de Monitoreo de Corresponsabilidad en Educación fortalecida
Unidad de Monitoreo de Corresponsabilidad en Educación fortalecida
Estudiantes matriculados en Educación Media a través de una modalidad alternativa
Estudiantes matriculados en Educación Media a través de una modalidad alternativa
Ordenamiento de la Estrategia Vida Mejor
Ordenamiento de la Estrategia Vida Mejor
Propuesta de un Modelo de Focalización con la nueva metodología de pobreza monetaria oficial, elaborada
Propuesta de un Modelo de Focalización con la nueva metodología de pobreza monetaria oficial, elaborada
Unidad de Análisis del Observatorio de Desarrollo Social (ODS) del Sistema de Registro de Beneficiarios de Honduras (SIRBHO) y Atención al Usuario Fortalecida
Unidad de Análisis del Observatorio de Desarrollo Social (ODS) del Sistema de Registro de Beneficiarios de Honduras (SIRBHO) y Atención al Usuario Fortalecida
Unidad de Monitoreo y Evaluación fortalecida
Unidad de Monitoreo y Evaluación fortalecida
Programa Bono Vida Mejor
Programa Bono Vida Mejor
Estructura de gestión y operativa del PRS a nivel central implementado
Estructura de gestión y operativa del PRS a nivel central implementado
Número de personas en hogares rurales, que reciben transferencias monetarias como parte de la crisis socioeconomica causada por la emergencia COVID-19 y los huracanes ETA / IOTA, según el Reglamento Operativo.
Número de personas en hogares rurales, que reciben transferencias monetarias como parte de la crisis socioeconomica causada por la emergencia COVID-19 y los huracanes ETA / IOTA, según el Reglamento Operativo.
Número de Gestores fortalecido para atención al participante a nivel local
Número de Gestores fortalecido para atención al participante a nivel local
Oficinas de Atención al Participante (OAP) fortalecidas
Oficinas de Atención al Participante (OAP) fortalecidas
Número de personas en hogares rurales, que reciben transferencias monetarias como parte de la crisis socioeconomica causada por la emergencia COVID-19 y los huracanes ETA / IOTA, según el Reglamento Operativo.
Número de personas en hogares rurales, que reciben transferencias monetarias como parte de la crisis socioeconomica causada por la emergencia COVID-19 y los huracanes ETA / IOTA, según el Reglamento Operativo.
Número de personas en hogares rurales que reciben transferencias monetarias en los 52 municipios con intervencion integral
Número de personas en hogares rurales que reciben transferencias monetarias en los 52 municipios con intervencion integral
Sistema de Información del PRS fortalecido
Sistema de Información del PRS fortalecido
Parejas Participantes del PRS con talleres de ¡Cuídate!
Parejas Participantes del PRS con talleres de ¡Cuídate!
Sistema de Información del PRS fortalecido
Sistema de Información del PRS fortalecido
Unidad de Monitoreo de Corresponsabilidades en Salud fortalecida
Unidad de Monitoreo de Corresponsabilidades en Salud fortalecida
Estructura de gestión y operativa del PRS a nivel central implementado
Estructura de gestión y operativa del PRS a nivel central implementado
XI-IATI-IADB-HO-L1202
Inter-American Development Bank
Digital Transformation for Increased Competitiveness
Transformación Digital para una Mayor Competitividad
This Program will promote the digital transformation of government citizen services and strengthen the capacity of SME and start-ups to participate in the digital economy. To achieve this, the program will: (i) improve government services by the implementation of e-government solutions for citizen services; (ii) implement a digital identity program; (iii) broadband connectivity infrastructure; and (iv) promote a digital ecosystem for employment and investments in the digital economy by strengthening the capacity of SME´s and start-ups and promoting greater levels of human capital specialized in creative and digital industries.
Este programa promoverá la transformación digital que el gobierno brinda a los ciudadanos y fortalecerá la capacidad de las PYMEs y start-ups para participar en la economía digital. Para lograrlo, el programa: (i) mejorará los servicios gubernamentales mediante la implementación de soluciones de gobierno electrónico para servicios a los ciudadanos; (ii) implementará un programa de identidad digital; (iii) brindará infraestructura de conectividad de banda ancha; y (iv) promoverá un ecosistema digital para el empleo e inversiones en la economía digital, fortaleciendo la capacidad de las PYMEs y start-ups, promoviendo mayores niveles de capital humano especializado en industrias creativas y digitales.
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
DIRECCION DE GESTION POR RESULTADOS
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Capacidad técnica y operativa de la DIGER incrementada Transformación Digital para una Mayor Competitividad, Honduras
-1.37372, -48.4273
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
455046.0
480972.0
507792.0
534165.0
561879.0
589146.0
616413.0
643680.0
670947.0
697320.0
723246.0
747831.0
771075.0
793425.0
813540.0
831867.0
848406.0
862710.0
873885.0
883272.0
889083.0
892659.0
893106.0
891318.0
885954.0
877908.0
868074.0
854664.0
839019.0
821586.0
802365.0
780462.0
758112.0
733527.0
708495.0
682122.0
655302.0
628035.0
600768.0
573054.0
546234.0
518520.0
492147.0
466221.0
440742.0
416157.0
392019.0
368775.0
347319.0
325416.0
305301.0
286080.0
267753.0
250320.0
233781.0
218136.0
203385.0
189081.0
176565.0
4713818.0
500000
Disbursement in forth quarter of 2021
287.27
Interest repayment in first quarter of 2022
1831
Interest repayment in third quarter of 2022
4337.4
Interest repayment in first quarter of 2023
5803.53
Interest repayment in third quarter of 2023
3500000
Disbursement in third quarter of 2023
49258.58
Interest repayment in first quarter of 2024
Honduras. Digital Transformation for Increased Competitiveness. Loan Proposal.pdf
HO-L1202 First period Jan-Jun 2022 - Public Report.PDF
HO-L1202_P2066864_SP.pdf
HO-L1202 Link Diseño Conceptual Ciudad Inteligente SPS.pdf
Honduras. Transformación Digital para una Mayor Competitividad. Propuesta de Prestamo.pdf
HO-L1202 POD - Link Política de servicios públicos domiciliarios.docx
HO-L1202 - POD Link PEP.pdf
Digital Transformation for Increased Competitiveness.pdf
Programa Integral de Drenaje Pluvial en Ciudades Priorizadas del Perú.pdf
HO-L1202 - Link Diseño Conceptual Distrito Digital.pdf
HO-L1202 Second period Jan-Dec 2019-Public Report.pdf
HO-L1202 - POD Anexo IV.pdf
HO-L1202 - POD Link IGAS.docx
HO-L1202 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1202 - POD Link PME.docx
HO-L1202 - POD Link Plan de Adquisiciones.docx
Calculos en Excel Análisis Economico.xlsx
Contrato - Proyecto de Transformación Digital para una Mayor Competitividad.pdf
HO-L1202 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1202 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1202_P968644_GN.pdf
HO-L1202 First period Jan-Jun 2020 - Public Report.pdf
HO-L1202 - POD Link POA.pdf
HO-L1202 First period Jan-Jun 2021 - Public Report.pdf
HO-L1202 - POD Link ROP.docx
HO-L1202 First period Jan-Jun 2023 - Public Report.PDF
Cobertura y uso de Banda Ancha
Cobertura y uso de Banda Ancha
Sitios y edificios públicos conectados
Sitios y edificios públicos conectados
Transformación Digital del Gobierno
Transformación Digital del Gobierno
Capacidad técnica y operativa de la DIGER incrementada
Capacidad técnica y operativa de la DIGER incrementada
XI-IATI-IADB-HO-L1235
Inter-American Development Bank
Institutional and Operational Strengthening of the Customs Administration
Fortalecimiento Institucional y Operativo de la Administración Aduanera
The general objective of development is to increase customs revenue by improving processes, implementing customs controls and technologies that help facilitate trade and reduce customs fraud. The specific development objectives are: (i) to increase the efficiency of the AAH's operational management; and (ii) improve controls, automation, and the use of technology to reduce customs fraud.
El objetivo general de desarrollo es aumentar la recaudación aduanera mediante la mejora de los procesos, la implementación de controles aduaneros y tecnologías que contribuyan a facilitar el comercio y disminuir la defraudación fiscal. Los objetivos específicos de desarrollo son: (i) incrementar la eficiencia de la gestión operativa de la AAH; y (ii) mejorar los controles, la automatización y el uso de las tecnologías para disminuir la defraudación fiscal.
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
ADMINISTRACION ADUANERA DE HONDURAS
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRADE
COMERCIO
509000.0
538000.0
568000.0
597500.0
628500.0
659000.0
689500.0
720000.0
750500.0
780000.0
809000.0
836500.0
862500.0
887500.0
910000.0
930500.0
949000.0
965000.0
977500.0
988000.0
994500.0
998500.0
999000.0
997000.0
991000.0
982000.0
971000.0
956000.0
938500.0
919000.0
897500.0
873000.0
848000.0
820500.0
792500.0
763000.0
733000.0
702500.0
672000.0
641000.0
611000.0
580000.0
550500.0
521500.0
493000.0
465500.0
438500.0
412500.0
388500.0
364000.0
341500.0
320000.0
299500.0
280000.0
261500.0
244000.0
227500.0
211500.0
197500.0
9243086.5
503913.5
Disbursement in forth quarter of 2023
3919.31
Interest repayment in first quarter of 2024
Contrato - Proyecto de Fortalecimiento Institucional y Operativo de la Administración Aduanera.docx.pdf
Institutional and Operational Strengthening of the Customs Administration.pdf
HO-L1235 - Porpuesta de prestamo para el Fortalecimiento Institucional y Operativo de la Administracion Aduanera.pdf
HO-L1235 - Loan Proposal for the Institutional and Operational Strengthening of the Customs Administration.pdf
Fortalecimiento Institucional y Operativo de la Administración Aduanera.pdf
HO-L1235_P2067856_GN.pdf
HO-L1235 First period Jan-Jun 2023 - Public Report.PDF
HO-L1235 Second period Jan-Dec 2022 - Public Report.PDF
XI-IATI-IADB-HO-L1019
Inter-American Development Bank
Energy Sector Support Program II - First Loan
Programa de Apoyo al Sector Energia II - Primer Préstamo
To ensure energy supply reliably and efficiently to meet the growing demand of the population and the country's economic growth over the medium term. The specific objectives of the project are to increase the capacity of the power transmission system for transporting energy from local and regional market needed to counter the demand for medium-term under appropriate reliability conditions. At the same time seeks to contribute to increasing the efficiency of the technical and commercial processes in the distribution segment to reduce the losses of electricity.
Asegurar el suministro de energía de manera confiable y eficiente para satisfacer la demanda creciente de la población y el crecimiento económico del país en el mediano plazo. Los objetivos específicos del proyecto son incrementar la capacidad de la red de transmisión eléctrica para el transporte de la energía local y del mercado regional necesaria para enfrentar la demanda de mediano plazo en condiciones adecuadas de confiabilidad. Al mismo tiempo se busca contribuir al incremento de la eficiencia de los procesos técnicos y comerciales en el segmento de distribución para disminuir las pérdidas de energía eléctrica.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
EMPRESA NACIONAL DE ENERGIA ELECTRICA
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Financiamiento del SIEPAC otorgado Programa de Apoyo al Sector Energia II - Primer Préstamo, Honduras
14.824173968, -86.600264243
ENERGY
ENERGIA
45054.9
Disbursement in third quarter of 2010
105128.1
Disbursement in third quarter of 2010
1350000
Disbursement in forth quarter of 2010
3150000
Disbursement in forth quarter of 2010
800.51
Interest repayment in first quarter of 2011
26299.36
Interest repayment in first quarter of 2011
1687885.28
Disbursement in first quarter of 2011
3938398.99
Disbursement in first quarter of 2011
3486.74
Interest repayment in third quarter of 2011
111156.53
Interest repayment in third quarter of 2011
1477500
Disbursement in third quarter of 2011
3447500
Disbursement in third quarter of 2011
5408.5
Interest repayment in first quarter of 2012
164476.66
Interest repayment in first quarter of 2012
5669.4
Interest repayment in third quarter of 2012
132222.03
Interest repayment in third quarter of 2012
620553.79
Disbursement in third quarter of 2012
1447958.84
Disbursement in third quarter of 2012
1779446.21
Disbursement in forth quarter of 2012
4152041.16
Disbursement in forth quarter of 2012
7807.02
Interest repayment in first quarter of 2013
205878.42
Interest repayment in first quarter of 2013
1604559.82
Disbursement in third quarter of 2013
3743972.91
Disbursement in third quarter of 2013
8629.04
Interest repayment in third quarter of 2013
222315.19
Interest repayment in third quarter of 2013
11101.97
Interest repayment in first quarter of 2014
263150.01
Interest repayment in first quarter of 2014
10618.25
Interest repayment in third quarter of 2014
245809.28
Interest repayment in third quarter of 2014
10794.25
Interest repayment in first quarter of 2015
244923.02
Interest repayment in first quarter of 2015
10618.25
Interest repayment in third quarter of 2015
228409.38
Interest repayment in third quarter of 2015
425212.77
Loan repayment in third quarter of 2015
10784.95
Interest repayment in first quarter of 2016
261797.7
Interest repayment in first quarter of 2016
425212.77
Loan repayment in first quarter of 2016
10647.75
Interest repayment in third quarter of 2016
235337.37
Interest repayment in third quarter of 2016
425212.77
Loan repayment in third quarter of 2016
268462.95
Interest repayment in first quarter of 2017
425212.77
Loan repayment in first quarter of 2017
236756.19
Interest repayment in third quarter of 2017
425212.77
Loan repayment in third quarter of 2017
263283.49
Interest repayment in first quarter of 2018
425212.77
Loan repayment in first quarter of 2018
262425.17
Interest repayment in third quarter of 2018
425212.77
Loan repayment in third quarter of 2018
306788.01
Interest repayment in first quarter of 2019
425212.77
Loan repayment in first quarter of 2019
338539.77
Interest repayment in third quarter of 2019
425212.77
Loan repayment in third quarter of 2019
344297.53
Interest repayment in first quarter of 2020
425212.77
Loan repayment in first quarter of 2020
294780.73
Interest repayment in third quarter of 2020
425212.77
Loan repayment in third quarter of 2020
226587.5
Interest repayment in first quarter of 2021
425212.77
Loan repayment in first quarter of 2021
224791.63
Interest repayment in third quarter of 2021
425212.77
Loan repayment in third quarter of 2021
219927.28
Interest repayment in first quarter of 2022
425212.77
Loan repayment in first quarter of 2022
228834.07
Interest repayment in third quarter of 2022
425212.77
Loan repayment in third quarter of 2022
224029.95
Interest repayment in first quarter of 2023
425212.77
Loan repayment in first quarter of 2023
308605.37
Interest repayment in third quarter of 2023
424374.93
Loan repayment in third quarter of 2023
322357.19
Interest repayment in first quarter of 2024
426050.61
Loan repayment in first quarter of 2024
Rapport pour Publication_PMR-_HO-L1019-2011-2º-Período [37297996].PDF
Relatório para publicação_PMR-_HO-L1019-2011-2º-Período [37297804].PDF
Informe para Publicación_PMR-_HO-L1019-2011-2º-Periodo [37298186].PDF
SERVICIOS DE CONSULTORIA H (power) [35408681].PDF
Relatório para publicação_PMR-_HO-L1019-2012-1º-Período [37352183].PDF
Rapport pour Publication_PMR-_HO-L1019-2010-2º-Período [36312184].PDF
PROGRAMA DE APOYO AL SECTOR ENERGIA II, PRIMER PROYECTO CONSTRUCCIÓN SUBESTACIÓN ELECTRICA H [35259696].DOCX
Relatório para publicação_PMR-_HO-L1019-2011-1º-Período [36624046].PDF
Rapport pour Publication_PMR-_HO-L1019-2012-2º-Período [37873959].PDF
Report for Publication_PMR-_HO-L1019-2011-1º-Period [36625744].PDF
Informe para Publicación_PMR-_HO-L1019-2012-1º-Periodo [37353503].PDF
Report for Publication_PMR-_HO-L1019-2012-2º-Period [37875444].PDF
Informe para Publicación_PMR-_HO-L1019-2011-1º-Periodo [36625182].PDF
Report for Publication_PMR-_HO-L1019-2012-1º-Period [37354168].PDF
Relatório para publicação_PMR-_HO-L1019-2010-2º-Período [36310283].PDF
Informe para Publicación_PMR-_HO-L1019-2010-2º-Periodo [36312771].PDF
Relatório para publicação_PMR-_HO-L1019-2012-2º-Período [37873291].PDF
HO-L1019 First period Jan-Jun 2014-Public Report [40182062].PDF
Informe para Publicación_PMR-_HO-L1019-2012-2º-Periodo [37874619].PDF
Rapport pour Publication_PMR-_HO-L1019-2012-1º-Período [37352847].PDF
Rapport pour Publication_PMR-_HO-L1019-2013-1º-Período [38266178].PDF
Contrato - Programa de Apoyo al Sector Energía II.pdf
Report for Publication_PMR-_HO-L1019-2010-2º-Period [36313345].PDF
HO-L1019_pdf [35873106].PDF
HO-L1019 Second period Jan-Dec 2013-Public Report [40174687].PDF
Rapport pour Publication_PMR-_HO-L1019-2011-1º-Período [36624627].PDF
Honduras_ HO-L1019_ Energy Sector Support Program II - First Loan [1798329].PDF
Relatório para publicação_PMR-_HO-L1019-2013-1º-Período [38265514].PDF
Honduras_ HO-L1019_ Programa de Apoyo al Sector Energia II - Primer Proyecto [1798330].PDF
Report for Publication_PMR-_HO-L1019-2011-2º-Period [37298381].PDF
Report for Publication_PMR-_HO-L1019-2013-1º-Period [38267517].PDF
Contrato Modificatorio - Programa de Apoyo al Sector Energía II.pdf
Componente 1. Inversiones en la red de transmisión eléctrica.
Componente 1. Inversiones en la red de transmisión eléctrica.
Subestación Zamorano en 69/34.5 kV con 30 MVA
adicionales ampliada y en operación
Subestación Zamorano en 69/34.5 kV con 30 MVA
adicionales ampliada y en operación
Subestación Amarateca construida y en operación
Subestación Amarateca construida y en operación
Componente 2. Inversiones en la transformación corporativa de la ENEE.
Componente 2. Inversiones en la transformación corporativa de la ENEE.
Financiamiento del SIEPAC otorgado
Financiamiento del SIEPAC otorgado
XI-IATI-IADB-HO-L1069
Inter-American Development Bank
Strengthen the Financial Security Network and Improve Access to Financing
Fortalecimiento de la Red de Seguridad Financiera y Mejora del Acceso al Financi
This loan is the second operation in a policy-based programmatic series. Its objective is to continue to promote stability in the financial sector and to expand access to financing.
Este préstamo es la segunda operación de una serie programática de un programa basado en reformas de política. El objetivo de este programa es continuar promoviendo la estabilidad del sistema financiero ampliando el acceso al financiamiento.
COMISION NACIONAL DE BANCOS Y SEGUROS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
FINANCIAL MARKETS
MERCADOS FINANCIEROS
12000000
Disbursement in forth quarter of 2011
28000000
Disbursement in forth quarter of 2011
14593.98
Interest repayment in second quarter of 2012
434885.71
Interest repayment in second quarter of 2012
15000
Interest repayment in forth quarter of 2012
509600
Interest repayment in forth quarter of 2012
14953.96
Interest repayment in second quarter of 2013
535038.73
Interest repayment in second quarter of 2013
15041.1
Interest repayment in forth quarter of 2013
541880.54
Interest repayment in forth quarter of 2013
14958.9
Interest repayment in second quarter of 2014
540146.85
Interest repayment in second quarter of 2014
15041.1
Interest repayment in forth quarter of 2014
543284.38
Interest repayment in forth quarter of 2014
14958.9
Interest repayment in second quarter of 2015
540315.62
Interest repayment in second quarter of 2015
15041.1
Interest repayment in forth quarter of 2015
543284.38
Interest repayment in forth quarter of 2015
15004.94
Interest repayment in second quarter of 2016
621274.48
Interest repayment in second quarter of 2016
15000
Interest repayment in forth quarter of 2016
583800
Interest repayment in forth quarter of 2016
560140.31
Interest repayment in second quarter of 2017
558325.48
Interest repayment in forth quarter of 2017
571428.57
Loan repayment in forth quarter of 2017
538235.92
Interest repayment in second quarter of 2018
571428.57
Loan repayment in second quarter of 2018
529298.33
Interest repayment in forth quarter of 2018
571428.57
Loan repayment in forth quarter of 2018
515640.54
Interest repayment in second quarter of 2019
571428.57
Loan repayment in second quarter of 2019
507529.56
Interest repayment in forth quarter of 2019
571428.57
Loan repayment in forth quarter of 2019
495391.68
Interest repayment in second quarter of 2020
571428.57
Loan repayment in second quarter of 2020
484314.29
Interest repayment in forth quarter of 2020
571428.57
Loan repayment in forth quarter of 2020
482467.64
Interest repayment in second quarter of 2021
571428.57
Loan repayment in second quarter of 2021
475499.18
Interest repayment in forth quarter of 2021
571428.57
Loan repayment in forth quarter of 2021
461731.5
Interest repayment in second quarter of 2022
571428.57
Loan repayment in second quarter of 2022
453037.81
Interest repayment in forth quarter of 2022
571428.57
Loan repayment in forth quarter of 2022
434572.21
Interest repayment in second quarter of 2023
571428.57
Loan repayment in second quarter of 2023
425215.65
Interest repayment in forth quarter of 2023
571428.57
Loan repayment in forth quarter of 2023
HONDURAS_ Program to Strengthen the Financial Security Network and Improve Access to Financing [36519943].PDF
Contrato - Programa de Fortalecimiento de la Red de Seguridad Financiera y Mejora del Acceso al Financiamiento_.pdf
HONDURAS_ Programa de Fortalecimiento de la Red de Seguridad Financiera y Mejora del Acceso al Financiamiento [36519939].PDF
XI-IATI-IADB-HO-L1062
Inter-American Development Bank
Primary Education and Technology Integration Program
Programa de Educación Primaria e Integración Tecnológica
The specific objectives are to: (i) increase access by underprivileged children to preschool to improve their readiness for the first two cycles of basic education; (ii) improve learning in basic education, particularly in reading, writing, and mathematics, in the schools benefitting from the program; (iii) increase grade promotion rates and improve the rates for completion of grade 6 in the schools benefitting from the program; and (iv) transfer a strategy for the educational use of technology to the primary schools benefitting from the program.
Los objetivos específicos del programa son: (i) ampliar el acceso de la niñezdesfavorecida al nivel de educación pre-básica, para mejorar las condiciones deescolaridad con que asisten al primer ciclo de educación básica; (ii) mejorar losaprendizajes escolares en la educación básica, especialmente en lectura, escrituray matemática, en las escuelas beneficiarias del programa; (iii) aumentar las tasasde promoción de grado a grado y mejorar las tasas de terminación del sexto grado en las escuelas beneficiarias del programa; y (iv) transferir a las escuelas de educación básica beneficiarias del programa, una estrategia para el uso educativo de las tecnologías.
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
SECRETARIA DE EDUCACION
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Centros Educativos aplicando guías pedagógicas para Español y Matemática con uso de tecnología de 1° a 6° Programa de Educación Primaria e Integración Tecnológica, Honduras
14.824173968, -86.600264243
EDUCATION
EDUCACION
2100000
Disbursement in forth quarter of 2011
4900000
Disbursement in forth quarter of 2011
2182.73
Interest repayment in first quarter of 2012
25017.74
Interest repayment in first quarter of 2012
2625
Interest repayment in forth quarter of 2012
26826.83
Interest repayment in forth quarter of 2012
2760000
Disbursement in forth quarter of 2012
6440000
Disbursement in forth quarter of 2012
11340000
Loan repayment in first quarter of 2013
3600000
Disbursement in first quarter of 2013
8400000
Disbursement in first quarter of 2013
5522.12
Interest repayment in second quarter of 2013
118456.7
Interest repayment in second quarter of 2013
8400000
Loan repayment in second quarter of 2013
10727.26
Interest repayment in forth quarter of 2013
369844.96
Interest repayment in forth quarter of 2013
2100000
Disbursement in forth quarter of 2013
4900000
Disbursement in forth quarter of 2013
12617.26
Interest repayment in second quarter of 2014
397684.6
Interest repayment in second quarter of 2014
540000
Disbursement in third quarter of 2014
1260000
Disbursement in third quarter of 2014
13236.16
Interest repayment in forth quarter of 2014
406094
Interest repayment in forth quarter of 2014
4478084.84
Loan repayment in first quarter of 2015
284.79
Interest repayment in first quarter of 2015
13959.04
Interest repayment in first quarter of 2015
431881.86
Interest repayment in first quarter of 2015
13913.01
Interest repayment in forth quarter of 2015
462253.78
Interest repayment in forth quarter of 2015
13760.34
Interest repayment in second quarter of 2016
533469.74
Interest repayment in second quarter of 2016
13747.69
Interest repayment in third quarter of 2016
514504.63
Interest repayment in third quarter of 2016
507094.35
Interest repayment in first quarter of 2017
491100.6
Interest repayment in third quarter of 2017
534632.41
Loan repayment in third quarter of 2017
475320.62
Interest repayment in first quarter of 2018
534632.41
Loan repayment in first quarter of 2018
464779.29
Interest repayment in forth quarter of 2018
534632.41
Loan repayment in forth quarter of 2018
452749.7
Interest repayment in second quarter of 2019
534632.41
Loan repayment in second quarter of 2019
445427.27
Interest repayment in forth quarter of 2019
534632.41
Loan repayment in forth quarter of 2019
435025.37
Interest repayment in second quarter of 2020
534632.41
Loan repayment in second quarter of 2020
424643.78
Interest repayment in forth quarter of 2020
534632.41
Loan repayment in forth quarter of 2020
418557.43
Interest repayment in first quarter of 2021
534632.41
Loan repayment in first quarter of 2021
416798.89
Interest repayment in forth quarter of 2021
534632.41
Loan repayment in forth quarter of 2021
404607.81
Interest repayment in second quarter of 2022
534632.41
Loan repayment in second quarter of 2022
396752.84
Interest repayment in third quarter of 2022
534632.41
Loan repayment in third quarter of 2022
382067.91
Interest repayment in first quarter of 2023
534632.41
Loan repayment in first quarter of 2023
371717.47
Interest repayment in third quarter of 2023
534632.41
Loan repayment in third quarter of 2023
Relatório para publicação_PMR-_HO-L1062-2011-2º-Período [37297815].PDF
Rapport pour Publication_PMR-_HO-L1062-2012-1º-Período [37352859].PDF
HO-L1062 Second period Jan-Dec 2014-Public Report [40185536].PDF
Rapport pour Publication_PMR-_HO-L1062-2013-1º-Período [38266187].PDF
HO-L1062 First period Jan-Jun 2014-Public Report [40182046].PDF
Informe para Publicación_PMR-_HO-L1062-2011-1º-Periodo [36625194].PDF
Report for Publication_PMR-_HO-L1062-2012-2º-Period [37875456].PDF
Report for Publication_PMR-_HO-L1062-2013-1º-Period [38267526].PDF
Informe para Publicación_PMR-_HO-L1062-2012-1º-Periodo [37353517].PDF
Contrato - Programa de Educación Primaria e Integración Tecnológica.pdf
Relatório para publicação_PMR-_HO-L1062-2011-1º-Período [36624057].PDF
Relatório para publicação_PMR-_HO-L1062-2013-1º-Período [38265523].PDF
Report for Publication_PMR-_HO-L1062-2012-1º-Period [37354180].PDF
Informe para Publicación_PMR-_HO-L1062-2013-1º-Periodo [38266852].PDF
Informe para Publicación_PMR-_HO-L1062-2012-2º-Periodo [37874630].PDF
Report for Publication_PMR-_HO-L1062-2011-1º-Period [36625755].PDF
Report for Publication_PMR-_HO-L1062-2011-2º-Period [37298394].PDF
Rapport pour Publication_PMR-_HO-L1062-2011-2º-Período [37298007].PDF
Validación Final PCR Honduras HO-L1062 [39941364].PDF
Rapport pour Publication_PMR-_HO-L1062-2012-2º-Período [37873970].PDF
HO-L1062 Second period Jan-Dec 2013-Public Report [40174677].PDF
Rapport pour Publication_PMR-_HO-L1062-2011-1º-Período [36624638].PDF
Informe para Publicación_PMR-_HO-L1062-2011-2º-Periodo [37298197].PDF
Relatório para publicação_PMR-_HO-L1062-2012-2º-Período [37873302].PDF
Relatório para publicação_PMR-_HO-L1062-2012-1º-Período [37352196].PDF
Expansión de la Cobertura de Prebásica
Expansión de la Cobertura de Prebásica
Centros Educativos beneficiarios del paquete metodológico y los materiales juego y aprendo
Centros Educativos beneficiarios del paquete metodológico y los materiales juego y aprendo
Educadores (as) recibiendo seguimiento en sus centros educativos en la metodología CCEPREB
Educadores (as) recibiendo seguimiento en sus centros educativos en la metodología CCEPREB
Educadores (as) comunitarias recibiendo estipendios.
Educadores (as) comunitarias recibiendo estipendios.
Educadores (as) capacitados (as) en la metodología CCEPREB.
Educadores (as) capacitados (as) en la metodología CCEPREB.
Centros Educativos beneficiarios del paquete metodológico y los materiales juego y aprendo
Centros Educativos beneficiarios del paquete metodológico y los materiales juego y aprendo
Educadores (as) recibiendo seguimiento en sus centros educativos en la metodología CCEPREB
Educadores (as) recibiendo seguimiento en sus centros educativos en la metodología CCEPREB
Educadores (as) comunitarias recibiendo estipendios.
Educadores (as) comunitarias recibiendo estipendios.
Fortalecimiento de la calidad de la oferta educativa en los dos primeros ciclos de Básica
Fortalecimiento de la calidad de la oferta educativa en los dos primeros ciclos de Básica
Directivos capacitados en gestión pedagógica
Directivos capacitados en gestión pedagógica
Docentes capacitados en español, matemática y uso educativo de tecnología
Docentes capacitados en español, matemática y uso educativo de tecnología
Docentes capacitados en español, matemática y uso educativo de tecnología
Docentes capacitados en español, matemática y uso educativo de tecnología
Directivos capacitados en gestión pedagógica
Directivos capacitados en gestión pedagógica
Centros educativos que han recibido textos de español y matemática para estudiantes de 1° a 6°
Centros educativos que han recibido textos de español y matemática para estudiantes de 1° a 6°
Centros educativos que han recibido textos de español y matemática para estudiantes de 1° a 6°
Centros educativos que han recibido textos de español y matemática para estudiantes de 1° a 6°
Centros Educativos beneficiados con Asistencia Técnica
Centros Educativos beneficiados con Asistencia Técnica
Centros Educativos beneficiados con Asistencia Técnica
Centros Educativos beneficiados con Asistencia Técnica
Directivos capacitados en gestión pedagógica
Directivos capacitados en gestión pedagógica
Docentes capacitados en español, matemática y uso educativo de tecnología
Docentes capacitados en español, matemática y uso educativo de tecnología
Centros Educativos aplicando guías pedagógicas para Español y Matemática con uso de tecnología de 1° a 6°
Centros Educativos aplicando guías pedagógicas para Español y Matemática con uso de tecnología de 1° a 6°
Introducción de la Tecnología para el mejoramiento de la Educación Básica
Introducción de la Tecnología para el mejoramiento de la Educación Básica
Computadoras portatiles para docentes distribuidas
Computadoras portatiles para docentes distribuidas
Centros Educativos habilitados y conectados a Internet
Centros Educativos habilitados y conectados a Internet
Computadoras portatiles para docentes distribuidas
Computadoras portatiles para docentes distribuidas
Computadoras portatiles para estudiantes distribuidas
Computadoras portatiles para estudiantes distribuidas
Computadoras portatiles para estudiantes distribuidas
Computadoras portatiles para estudiantes distribuidas
Centros Educativos habilitados y conectados a Internet
Centros Educativos habilitados y conectados a Internet
XI-IATI-IADB-HO-L1203
Inter-American Development Bank
Renovation of the Francisco Morazán Hydropower Plant to Facilitate the Integration of Renewable Energy
Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integracion de Energías Renovables
The general objective of the program is to improve and recover the role of the Francisco Morazán hydroelectric power station (CHFM by its acronym in Spanish) as an effective asset to provide flexibility and integration of variable renewable energy (ERV) to the Honduran electricity system. The specific objectives are: (i) to improve the plant's operational reliability and efficiency as an asset to increase ERV's participation in the National Interconnected System (SNI) and its integration to the System Operator (OdS); (ii) have techincal studies to evaluate the increase in its generation capacity; and (iii) strengthen the local capacity and operative units of the plant.
El objetivo general del programa es mejorar y recuperar el papel de la central hidroeléctrica Francisco Morazán (CHFM) - El Cajón como un activo efectivo para proporcionar flexibilidad e integración de la Energía Renovable Variable (ERV) al sistema eléctrico de Honduras. Los objetivos específicos son: (i) mejorar la confiabilidad y eficiencia operativa de la central como un activo para incrementar la participación de ERV en el Sistema Nacional Interconectado (SNI) y su integración al Operador del Sistema (OdS); (ii) contar con insumos técnicosevaluar la factibilidad técnica y financiera para un potencial incremento de la capacidad instalada; y (iii) el fortalecimiento de las capacidades locales y unidades operativas de la planta.
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
EMPRESA NACIONAL DE ENERGIA ELECTRICA
EMPRESA NACIONAL DE ENERGIA ELECTRICA
Clean Technology Fund
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Consultorías para la elaboración de documentación técnica para la adquisición de equipos para la modernización Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integracion de Energías Renovables, Honduras
nan
ENERGY
ENERGIA
183240.0
193680.0
204480.0
215100.0
226260.0
237240.0
248220.0
259200.0
270180.0
280800.0
291240.0
301140.0
310500.0
319500.0
327600.0
334980.0
341640.0
347400.0
351900.0
355680.0
358020.0
359460.0
359640.0
358920.0
356760.0
353520.0
349560.0
344160.0
337860.0
330840.0
323100.0
314280.0
305280.0
295380.0
285300.0
274680.0
263880.0
252900.0
241920.0
230760.0
219960.0
208800.0
198180.0
187740.0
177480.0
167580.0
157860.0
148500.0
139860.0
131040.0
122940.0
115200.0
107820.0
100800.0
94140.0
87840.0
81900.0
76140.0
71100.0
3258920.0
250000
Disbursement in forth quarter of 2023
Honduras. Propuesta de préstamo para el proyecto Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la.pdf
Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovables.pdf
HO-L1203_P2096143_SP.pdf
Honduras. Loan proposal for the project Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Inte.pdf
HO-L1203_P1183891_GN.pdf
Contrato de Préstamo No. 5133-TC-HO - Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovable -
HO-L1203_P2069590_SP.pdf
HO-L1203 First period Jan-Jun 2021 - Public Report.pdf
HO-L1203_P2069590_1_SP.pdf
HO-L1203 Second period Jan-Dec 2022 - Public Report.PDF
HO-L1203 First period Jan-Jun 2022 - Public Report.PDF
HO-L1203_P1196998_GN.pdf
HO-L1203_P1183906_GN.pdf
HO-L1203_P2069590_2_SP.pdf
Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Integration of Renewable Energies - CTF.pdf
HO-L1203 First period Jan-Jun 2023 - Public Report.PDF
Contrato de Préstamo No. 5132-BL-HO - Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovable -
Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Integration of Renewable Energies.pdf
HO-L1203 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1203 Second period Jan-Dec 2020 - Public Report.pdf
Modernización de la Central
Modernización de la Central
Consultorías para la elaboración de documentación técnica para la adquisición de equipos para la modernización
Consultorías para la elaboración de documentación técnica para la adquisición de equipos para la modernización
XI-IATI-IADB-HO-L1090
Inter-American Development Bank
Program for Improved Accessibility and Quality of Health Services and Networks
Programa de Mejoramiento del Acceso y Calidad de Servicios y Redes de Salud
The objective of the program is to support the Ministry of Health (SESAL) in improving the coverage and quality of health services through the decentralized management modality, giving priority to the populations of the country¿s poorest municipios and strengthening implementation of the family- and community-based comprehensive health care model. The expected outcomes are: (i) improved access to, and quality of, the guaranteed package of services for the project¿s beneficiary population; (ii) strengthened maternal and child health networks in the beneficiary municipios and departments; and (iii) improved institutional capacity of SESAL to set policy, provide leadership, and manage the health services provided through management bodies under the decentralized management modality.
el programa tiene como objetivo apoyar a la Secretaría de Salud (SESAL) en la expansión de la cobertura y calidad de servicios de salud a través de la modalidad de gestión descentralizada de dichos servicios, priorizando las poblaciones de los municipios más pobres del país, fortaleciendo la implementación del modelo de atención integral en salud familiar-comunitario. Los resultados esperados son: (i) mejorar el acceso y calidad del conjunto garantizado de servicios prestados a la población beneficiaria del proyecto; (ii) fortalecer las redes materno infantiles de salud en los municipios y departamentos beneficiados; y (iii) mejorar la capacidad institucional de la SESAL para normar, conducir y gestionar los servicios de salud que son provistos con gestores bajo la modalidad de gestión descentralizada de dichos servicios
REPUBLICA DE HONDURAS
SECRETARÍA DE ESTADO EN EL DESPACHO DE SALUD (SESAL)
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
BLENDED LOANS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Gestores abastecidos de micronutrientes Programa de Mejoramiento del Acceso y Calidad de Servicios y Redes de Salud, Honduras
15.15, -88.26667
HEALTH
SALUD
3000000
Disbursement in second quarter of 2014
7000000
Disbursement in second quarter of 2014
2100000
Disbursement in forth quarter of 2014
4900000
Disbursement in forth quarter of 2014
3431.51
Interest repayment in forth quarter of 2014
36081.65
Interest repayment in forth quarter of 2014
11900000
Loan repayment in first quarter of 2015
1200000
Disbursement in second quarter of 2015
2800000
Disbursement in second quarter of 2015
6696.57
Interest repayment in second quarter of 2015
166413.05
Interest repayment in second quarter of 2015
900000
Disbursement in third quarter of 2015
2100000
Disbursement in third quarter of 2015
8387.68
Interest repayment in forth quarter of 2015
227323.09
Interest repayment in forth quarter of 2015
2100000
Disbursement in forth quarter of 2015
4900000
Disbursement in forth quarter of 2015
9800000
Loan repayment in first quarter of 2016
2100000
Disbursement in second quarter of 2016
4900000
Disbursement in second quarter of 2016
11467.58
Interest repayment in second quarter of 2016
397336.64
Interest repayment in second quarter of 2016
3000000
Disbursement in third quarter of 2016
7000000
Disbursement in third quarter of 2016
11900000
Loan repayment in forth quarter of 2016
17065.57
Interest repayment in forth quarter of 2016
513013.98
Interest repayment in forth quarter of 2016
2000000
Disbursement in second quarter of 2017
639805.53
Interest repayment in second quarter of 2017
153.42
Interest repayment in third quarter of 2017
611834.92
Interest repayment in forth quarter of 2017
602802.58
Interest repayment in second quarter of 2018
613579
Interest repayment in forth quarter of 2018
603574.99
Interest repayment in second quarter of 2019
613579
Interest repayment in forth quarter of 2019
729166.68
Loan repayment in forth quarter of 2019
593311.36
Interest repayment in second quarter of 2020
729166.68
Loan repayment in second quarter of 2020
587124.99
Interest repayment in forth quarter of 2020
729166.68
Loan repayment in forth quarter of 2020
579445.41
Interest repayment in second quarter of 2021
729166.68
Loan repayment in second quarter of 2021
580057.63
Interest repayment in forth quarter of 2021
729166.68
Loan repayment in forth quarter of 2021
558187.89
Interest repayment in second quarter of 2022
729166.68
Loan repayment in second quarter of 2022
554682.99
Interest repayment in forth quarter of 2022
729166.68
Loan repayment in forth quarter of 2022
527275.25
Interest repayment in second quarter of 2023
729166.68
Loan repayment in second quarter of 2023
521818.12
Interest repayment in forth quarter of 2023
729166.68
Loan repayment in forth quarter of 2023
HO-L1090 First period Jan-Jun 2016-Public Report [40799123].PDF
Programa de Mejoramiento del Acceso y Calidad de Servicios y Redes de Salud [37788271].PDF
HO-L1090 Second period Jan-Dec 2013-Public Report [40174672].PDF
Program for Improved Accessibility and Quality of Health Services and Networks [37788275].PDF
Report for Publication_PMR-_HO-L1090-2013-1º-Period [38267533].PDF
HO-L1090 [39579417].PDF
Enlace Análisis Social y Ambiental [37661412].PDF
HO-L1090 [39045394].PDF
Enlace - Estrategia CONE [37640981].doc
Relatório para publicação_PMR-_HO-L1090-2013-1º-Período [38265530].PDF
Enlace - Marco Político de la Reforma [37641051].PDF
Safeguard and Screening Form and Classification of Projects [37664834].docx
HO-L1090 First period Jan-Jun 2015-Public Report [40193973].PDF
HO-L1090 First period Jan-Jun 2014-Public Report [40182078].PDF
Informe para Publicación_PMR-_HO-L1090-2013-1º-Periodo [38266859].PDF
HO-L1090 [40101329].PDF
Enlace - Plan Nacional de Salud [37640994].PDF
Link Obligatorio 2_ Plan de Ejecución del Proyecto_ [37640983].PDF
Rapport pour Publication_PMR-_HO-L1090-2013-1º-Período [38266194].PDF
HO-L1090 First period Jan-Jun 2017-Public Report.pdf
HO-L1090 [40084518].PDF
Contrato - Programa de Mejoramiento del Acceso y Calidad de Servicios y Redes de Salud [38736760].PDF
HO-L1090 Second period Jan-Dec 2016-Public Report.pdf
HO-L1090 Second period Jan-Dec 2014-Public Report [40185545].PDF
Enlace - Programación financiera [37640987].docx
Estimación de Costo de Prestaciones de Salud [37814438].docx
HO-L1090 [38915639].PDF
HO-L1090 [38822035].PDF
Mejora de la Cobertura de Servicios de Salud con Gestión Descentralizada
Mejora de la Cobertura de Servicios de Salud con Gestión Descentralizada
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de El Paraíso
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de El Paraíso
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Lempira
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Lempira
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Copán
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Copán
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Valle
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Valle
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Valle
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Valle
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Copán
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Copán
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Comayagua
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Comayagua
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Ocotepeque
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Ocotepeque
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Intibucá
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Intibucá
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Olancho
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Olancho
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de La Paz
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de La Paz
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Comayagua
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Comayagua
Hospitales de salud que proveen servicios de salud con convenios de gestión descentralizadas
Hospitales de salud que proveen servicios de salud con convenios de gestión descentralizadas
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Choluteca
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Choluteca
Hospitales de salud que proveen servicios de salud con convenios de gestión descentralizadas
Hospitales de salud que proveen servicios de salud con convenios de gestión descentralizadas
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Intibucá
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Intibucá
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Gracias a Dios
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Gracias a Dios
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Lempira
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Lempira
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Gracias a Dios
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Gracias a Dios
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de La Paz
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de La Paz
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Choluteca
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Choluteca
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Santa Bárbara
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Santa Bárbara
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Olancho
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Olancho
Gestores abastecidos de micronutrientes
Gestores abastecidos de micronutrientes
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Santa Bárbara
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de Santa Bárbara
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de El Paraíso
Población que recibe un paquete de prestaciones mediante el modelo descentralizado en el departamento de El Paraíso
XI-IATI-IADB-HO-L1059
Inter-American Development Bank
Strengthen Decentralized Management and Supply of Health Services in Honduras
Fortalecimiento de la Gestión y Oferta Descentralizada de los Servicios de Salud
The objective is to help enhance the coverage and quality of health services, with an emphasis on maternal and child health care, using a performance-based financing model, giving priority to the Departments of La Paz, Intibucá, Copán, Lempira, Gracias a Dios, Olancho, Ocotepeque, Santa Bárbara, and Cortés. The expected outcomes of the program include: (i) increased coverage, quality, and usage of essential health services among the poor; (ii) strengthened management capacity at the various levels of care; and (iii) strengthened leadership capacity of SESAL.
El objetivo es contribuir a mejorar la cobertura y calidad de los servicios desalud, con énfasis en los servicios de atención materno-infantil, bajo un modelo de financiamiento basado en el logro de metas, priorizando los Departamentos de La Paz, Intibucá, Copán, Lempira, Gracias a Dios, Olancho, Ocotepeque, Sandra Bárbara y Cortés. Entre los resultados esperados del programa se incluyen: (i) aumento en la cobertura, calidad y uso de servicios esenciales de salud en poblaciones pobres; (ii) fortalecimiento de la capacidad gerencial de los diferentes niveles de atención; y (iii) fortalecimiento de la capacidad rectora de la SESAL.
SECRETARIA DE SALUD
REPUBLICA DE HONDURAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
ESTÁNDARES DE HABILITACIÓN DEFINIDOS Fortalecimiento de la Gestión y Oferta Descentralizada de los Servicios de Salud, Honduras
15.15, -88.26667
HEALTH
SALUD
1355330.7
Disbursement in third quarter of 2011
3162438.3
Disbursement in third quarter of 2011
1761.53
Disbursement in first quarter of 2012
1761.53
Interest repayment in first quarter of 2012
20161.5
Disbursement in first quarter of 2012
20161.5
Interest repayment in first quarter of 2012
3000000
Disbursement in third quarter of 2012
7000000
Disbursement in third quarter of 2012
1705.64
Disbursement in third quarter of 2012
1705.64
Interest repayment in third quarter of 2012
17387.88
Disbursement in third quarter of 2012
17387.88
Interest repayment in third quarter of 2012
10199987.68
Loan repayment in forth quarter of 2012
1500000
Disbursement in first quarter of 2013
3500000
Disbursement in first quarter of 2013
105145.41
Interest repayment in first quarter of 2013
5498.59
Disbursement in first quarter of 2013
5498.59
Interest repayment in first quarter of 2013
158856.19
Disbursement in first quarter of 2013
105371.33
Interest repayment in first quarter of 2013
7441.99
Interest repayment in third quarter of 2013
209055.46
Interest repayment in third quarter of 2013
1500000
Disbursement in forth quarter of 2013
3500000
Disbursement in forth quarter of 2013
7053484.86
Loan repayment in first quarter of 2014
9037.24
Interest repayment in first quarter of 2014
267274.02
Interest repayment in first quarter of 2014
9281.03
Interest repayment in third quarter of 2014
344216.88
Interest repayment in third quarter of 2014
810000
Disbursement in forth quarter of 2014
1890000
Disbursement in forth quarter of 2014
9706.7
Interest repayment in first quarter of 2015
344772.78
Interest repayment in first quarter of 2015
75703.54
Disbursement in third quarter of 2015
10301.85
Interest repayment in third quarter of 2015
127561.7
Disbursement in third quarter of 2015
355503.55
Interest repayment in third quarter of 2015
10270.51
Interest repayment in first quarter of 2016
396825.88
Interest repayment in first quarter of 2016
10368.85
Interest repayment in third quarter of 2016
393048.9
Interest repayment in third quarter of 2016
390412.88
Interest repayment in first quarter of 2017
401479.88
Loan repayment in first quarter of 2017
374745.05
Interest repayment in third quarter of 2017
401032.34
Loan repayment in third quarter of 2017
358743.45
Interest repayment in first quarter of 2018
401032.34
Loan repayment in first quarter of 2018
711580.92
Interest repayment in third quarter of 2018
799618.66
Loan repayment in third quarter of 2018
682619.25
Interest repayment in first quarter of 2019
802044.95
Loan repayment in first quarter of 2019
339348.61
Interest repayment in third quarter of 2019
401032.34
Loan repayment in third quarter of 2019
327694.92
Interest repayment in first quarter of 2020
401032.34
Loan repayment in first quarter of 2020
322622.14
Interest repayment in third quarter of 2020
401032.33
Loan repayment in third quarter of 2020
314708.39
Interest repayment in first quarter of 2021
401032.34
Loan repayment in first quarter of 2021
316670.61
Interest repayment in third quarter of 2021
401032.34
Loan repayment in third quarter of 2021
303782.37
Interest repayment in first quarter of 2022
401032.34
Loan repayment in first quarter of 2022
300964.28
Interest repayment in third quarter of 2022
401032.34
Loan repayment in third quarter of 2022
286591.77
Interest repayment in first quarter of 2023
401032.34
Loan repayment in first quarter of 2023
281720.08
Interest repayment in third quarter of 2023
401032.34
Loan repayment in third quarter of 2023
Relatório para publicação_PMR-_HO-L1059-2012-2º-Período [37873300].PDF
Relatório para publicação_PMR-_HO-L1059-2010-2º-Período [36310291].PDF
Relatório para publicação_PMR-_HO-L1059-2013-1º-Período [38265521].PDF
Report for Publication_PMR-_HO-L1059-2010-2º-Period [36313353].PDF
Rapport pour Publication_PMR-_HO-L1059-2012-1º-Período [37352857].PDF
HO-L1059 Second period Jan-Dec 2014-Public Report [40185535].PDF
Relatório para publicação_PMR-_HO-L1059-2012-1º-Período [37352194].PDF
Informe para Publicación_PMR-_HO-L1059-2013-1º-Periodo [38266850].PDF
Relatório para publicação_PMR-_HO-L1059-2011-1º-Período [36624055].PDF
Informe para Publicación_PMR-_HO-L1059-2012-1º-Periodo [37353514].PDF
HO-L1059 Second period Jan-Dec 2015-Public Report [40377445].PDF
Informe para Publicación_PMR-_HO-L1059-2012-2º-Periodo [37874628].PDF
Report for Publication_PMR-_HO-L1059-2011-2º-Period [37298391].PDF
Report for Publication_PMR-_HO-L1059-2013-1º-Period [38267524].PDF
Rapport pour Publication_PMR-_HO-L1059-2013-1º-Período [38266185].PDF
HO-L1059 Second period Jan-Dec 2013-Public Report [40174674].PDF
HO-L1059 First period Jan-Jun 2014-Public Report [40182069].PDF
Rapport pour Publication_PMR-_HO-L1059-2011-1º-Período [36624636].PDF
Informe para Publicación_PMR-_HO-L1059-2011-1º-Periodo [36625191].PDF
Informe para Publicación_PMR-_HO-L1059-2011-2º-Periodo [37298195].PDF
HO-L1059 [36673605].PDF
Report for Publication_PMR-_HO-L1059-2012-1º-Period [37354178].PDF
HO-L1059 [39539585].PDF
Report for Publication_PMR-_HO-L1059-2012-2º-Period [37875454].PDF
HO-L1059 [39115918].PDF
Rapport pour Publication_PMR-_HO-L1059-2010-2º-Período [36312192].PDF
Rapport pour Publication_PMR-_HO-L1059-2012-2º-Período [37873968].PDF
Relatório para publicação_PMR-_HO-L1059-2011-2º-Período [37297813].PDF
Report for Publication_PMR-_HO-L1059-2011-1º-Period [36625753].PDF
Programa de Fortalecimiento de la gestión y Oferta Descentralizada de los Servicios de Salud - Informe de Termin [40725202].PDF
HO-L1059 First period Jan-Jun 2015-Public Report [40193966].PDF
Informe para Publicación_PMR-_HO-L1059-2010-2º-Periodo [36312779].PDF
Rapport pour Publication_PMR-_HO-L1059-2011-2º-Período [37298005].PDF
HO-L1059 [39167987].PDF
Fortalecimiento de la Funcion rectora de La Secretaría de Salud
Fortalecimiento de la Funcion rectora de La Secretaría de Salud
ESTÁNDARES DE HABILITACIÓN DEFINIDOS
ESTÁNDARES DE HABILITACIÓN DEFINIDOS
Marco metodológico de evaluación del desempeño del sistema de salud elaborado
Marco metodológico de evaluación del desempeño del sistema de salud elaborado
Sistema de costos de atención en funcionamiento y costeo de cartera de servicios por grupo de edad y sexo, incluyendo AIN-C elaborado
Sistema de costos de atención en funcionamiento y costeo de cartera de servicios por grupo de edad y sexo, incluyendo AIN-C elaborado
Fortalecimiento de las Redes de Servicios de Salud
Fortalecimiento de las Redes de Servicios de Salud
Talleres de capacitacion para personal Secretaria de Salud impartidos
Talleres de capacitacion para personal Secretaria de Salud impartidos
Talleres de capacitacion para personal Secretaria de Salud impartidos
Talleres de capacitacion para personal Secretaria de Salud impartidos
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
NÚMERO DE HOSPITALES QUE CUMPLEN CON LOS CRITERIOS ORGANIZACIONALES PARA EL NUEVO SISTEMA DE GESTIÓN ADMINISTRATIVO-FINANCIERO, GESTION CLINICA, GESTION DE PACIENTES Y DISEÑO DE ESTRUCTURA ORGANIZACIONAL
NÚMERO DE HOSPITALES QUE CUMPLEN CON LOS CRITERIOS ORGANIZACIONALES PARA EL NUEVO SISTEMA DE GESTIÓN ADMINISTRATIVO-FINANCIERO, GESTION CLINICA, GESTION DE PACIENTES Y DISEÑO DE ESTRUCTURA ORGANIZACIONAL
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Talleres de Capacitacion impartidos a Gestores de Servicios de Salud Descentralizados
Talleres de Capacitacion impartidos a Gestores de Servicios de Salud Descentralizados
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Talleres de capacitacion para personal Secretaria de Salud impartidos
Talleres de capacitacion para personal Secretaria de Salud impartidos
Medicion de Satisfacion usuarios externos de Servicios Hospitalarios realizada
Medicion de Satisfacion usuarios externos de Servicios Hospitalarios realizada
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
Poblacion Adicional cubierta por los modelos descentralizados de salud (Modelo public-social)
XI-IATI-IADB-HO-L1063
Inter-American Development Bank
Program of Support for the Implementation of the Comprehensive Civic Coexistence
Prog. de Apoyo a la Implement. de la Política Integral de Convivencia y Seg.
The program's general objective is to contribute to crime prevention and prosecution by improving: (i) the effectiveness of the institutional and operational management of the Department of Security/National Police Force; (ii) criminal investigation capacity; and (iii) management on the subnational level of civic coexistence and public safety in the beneficiary municipios.
El objetivo general del programa es contribuir a la prevención y resolución del delito, a través del mejoramiento de: (i) la efectividad de la gestión institucional y operativa de la SS/PN; (ii) la capacidad de investigación del delito; y (iii) la gestión a nivel territorial de la convivencia y la seguridad ciudadana en los municipios beneficiados.
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
SECRETARÍA DE ESTADO EN EL DESPACHO DE SEGURIDAD
SECRETARÍA DE ESTADO EN EL DESPACHO DE SEGURIDAD
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
2.3 Nueva currícula para formación especializada diseñado. Prog. de Apoyo a la Implement. de la Política Integral de Convivencia y Seg., Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
226907.67
Disbursement in first quarter of 2013
529451.23
Disbursement in first quarter of 2013
240.9
Interest repayment in third quarter of 2013
2635.51
Interest repayment in third quarter of 2013
823092.3
Disbursement in forth quarter of 2013
1920548.7
Disbursement in forth quarter of 2013
815.91
Interest repayment in first quarter of 2014
8700.78
Interest repayment in first quarter of 2014
2025124.77
Disbursement in second quarter of 2014
4725291.14
Disbursement in second quarter of 2014
2397.5
Interest repayment in third quarter of 2014
26214.92
Interest repayment in third quarter of 2014
3875.5
Interest repayment in first quarter of 2015
40049.92
Interest repayment in first quarter of 2015
1650000
Disbursement in second quarter of 2015
3850000
Disbursement in second quarter of 2015
11025291.07
Loan repayment in third quarter of 2015
5236.28
Interest repayment in third quarter of 2015
57692.54
Interest repayment in third quarter of 2015
4500000
Disbursement in forth quarter of 2015
10500000
Disbursement in forth quarter of 2015
10500000
Loan repayment in first quarter of 2016
8381.77
Interest repayment in first quarter of 2016
299828.22
Interest repayment in first quarter of 2016
11468.39
Interest repayment in third quarter of 2016
466247.97
Interest repayment in third quarter of 2016
1800000
Disbursement in third quarter of 2016
4200000
Disbursement in third quarter of 2016
5400000
Disbursement in forth quarter of 2016
12600000
Disbursement in forth quarter of 2016
16800000
Loan repayment in first quarter of 2017
539595.17
Interest repayment in first quarter of 2017
5049584.19
Disbursement in third quarter of 2017
775557.03
Interest repayment in third quarter of 2017
96.83
Interest repayment in first quarter of 2018
782501.24
Interest repayment in first quarter of 2018
783932.33
Interest repayment in third quarter of 2018
870362.95
Loan repayment in third quarter of 2018
779670.35
Interest repayment in first quarter of 2019
870362.95
Loan repayment in first quarter of 2019
750937.25
Interest repayment in third quarter of 2019
870362.95
Loan repayment in third quarter of 2019
746843.89
Interest repayment in first quarter of 2020
870362.95
Loan repayment in first quarter of 2020
721156.66
Interest repayment in third quarter of 2020
870362.95
Loan repayment in third quarter of 2020
713780.81
Interest repayment in first quarter of 2021
870362.95
Loan repayment in first quarter of 2021
710675
Interest repayment in third quarter of 2021
870362.95
Loan repayment in third quarter of 2021
701007.66
Interest repayment in first quarter of 2022
870362.95
Loan repayment in first quarter of 2022
673300.61
Interest repayment in third quarter of 2022
870362.95
Loan repayment in third quarter of 2022
667912.89
Interest repayment in first quarter of 2023
870362.95
Loan repayment in first quarter of 2023
630359.49
Interest repayment in third quarter of 2023
870362.95
Loan repayment in third quarter of 2023
626263.71
Interest repayment in first quarter of 2024
870362.95
Loan repayment in first quarter of 2024
HO-L1063 [39834203].PDF
HO-L1063 [39887425].PDF
HO-L1063 [39733907].PDF
HO-L1063 [39670827].PDF
HO-L1063 [40098560].PDF
Informe para Publicación_PMR-_HO-L1063-2012-1º-Periodo [37353518].PDF
Program of Support for the Implementation of the Comprehensive Civic Coexistence and Public Safety Policy - Loan [36937181].PDF
HO-L1063 [40275906].PDF
Program of Support for the Implementation of the Comprehensive Civic Coexistence and Public Safety Policy - Loan [36946633].PDF
HO-L1063 [40150535].PDF
Relatório para publicação_PMR-_HO-L1063-2013-1º-Período [38265524].PDF
HO-L1063 [40045802].PDF
HO-L1063 First period Jan-Jun 2015-Public Report [40193967].PDF
HO-L1063 [40268251].PDF
HO-L1063 [38973341].PDF
HO-L1063 First period Jan-Jun 2016-Public Report [40799114].PDF
HO-L1063 [40227802].PDF
HO-X1021 [40709611].PDF
HO-L1063 First period Jan-Jun 2014-Public Report [40182076].PDF
HO-L1063 [40274386].PDF
HO-L1063 [38842252].PDF
HO-L1063 Second period Jan-Dec 2015-Public Report [40377448].PDF
Relatório para publicação_PMR-_HO-L1063-2012-1º-Período [37352197].PDF
HO-L1063 [40418930].PDF
HO-L1063 [40275970].PDF
Contrato - Programa de Apoyo a la Implementación de la Política Integral.pdf
Informe de Terminación de Proyecto HO-L1063 - HO-G1244.pdf
HO-L1063 [39811555].PDF
HO-L1063 Second period Jan-Dec 2014-Public Report [40185540].PDF
HO-L1063 [39622579].PDF
HO-L1063 [39795396].PDF
HO-L1063 [40117197].PDF
Report for Publication_PMR-_HO-L1063-2013-1º-Period [38267527].PDF
HO-L1063 [40274397].PDF
HO-L1063 [40323190].PDF
Rapport pour Publication_PMR-_HO-L1063-2013-1º-Período [38266188].PDF
HO-L1063 [40182323].PDF
HO-L1063 [39742055].PDF
HO-L1063 [40450801].PDF
HO-L1063 [40268250].PDF
Informe para Publicación_PMR-_HO-L1063-2013-1º-Periodo [38266853].PDF
HO-L1063 [39763771].PDF
HO-L1063 Second period Jan-Dec 2013-Public Report [40174680].PDF
HO-L1063 [38978697].PDF
HO-L1063 [39763741].PDF
Programa de Apoyo a la Implementación de la Política Integral de Convivencia y Seguridad Ciudadana - Propuesta d [36946624].PDF
HO-L1063 [39772981].PDF
HO-L1063 Second period Jan-Dec 2016-Public Report.pdf
HO-L1063 [40275910].PDF
HO-L1063 [39729732].PDF
HO-L1063 [40257261].PDF
HO-L1063 [39659622].PDF
HO-L1063 [39692793].PDF
Programa de Apoyo a la Implementación de la Política Integral de Convivencia y Seguridad Ciudadana - Propuesta d [36937221].PDF
Rapport pour Publication_PMR-_HO-L1063-2012-1º-Período [37352860].PDF
HO-L1063 [38990347].PDF
HO-L1063 [39142715].PDF
HO-L1063 [39539682].PDF
HO-L1063 [40229303].PDF
HO-L1063 [39764527].PDF
HO-L1063 [39849078].PDF
HO-L1063 [40084532].PDF
HO-L1063 [40274390].PDF
Rapport pour Publication_PMR-_HO-L1063-2012-2º-Período [37873971].PDF
HO-L1063 [39091768].PDF
HO-L1063 First period Jan-Jun 2017-Public Report.pdf
Relatório para publicação_PMR-_HO-L1063-2012-2º-Período [37873303].PDF
Report for Publication_PMR-_HO-L1063-2012-1º-Period [37354181].PDF
2. Fortalecimiento del sistema de IC (US$13.29 millones)
2. Fortalecimiento del sistema de IC (US$13.29 millones)
2.3 Nueva currícula para formación especializada diseñado.
2.3 Nueva currícula para formación especializada diseñado.
2.5 Funcionarios formados bajo nuevo currículo.
2.5 Funcionarios formados bajo nuevo currículo.
3. Fortalecimiento de la Seguridad Comunitaria (US$12.9 millones).
3. Fortalecimiento de la Seguridad Comunitaria (US$12.9 millones).
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.4. Infraestructura de postas policiales mejorada -d
3.4. Infraestructura de postas policiales mejorada -d
3.3. Observatorio Local de la Violencia funcionando -d
3.3. Observatorio Local de la Violencia funcionando -d
3.7 Programas municipales de prevención funcionando
3.7 Programas municipales de prevención funcionando
3.7 Programas municipales de prevención funcionando
3.7 Programas municipales de prevención funcionando
3.1. Municipios certificados -d
3.1. Municipios certificados -d
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
3.6 Policías capacitados en filosofía de "Policía comunitaria"
XI-IATI-IADB-HO-L1032
Inter-American Development Bank
Integrated Support for the Social Safety Net Program
Programa de Apoyo Integral a la Red de Protección Social
(i) consolidate the conditional cash transfer program of the Programa de Asignación Familiar [Family Allowance Program] (PRAF) from a technical and operational standpoint, expand the scope of coverage, and coordinate the program with the social safety net; (ii) design and implement a gradual intervention scheme with an integrated approach to ensure the program's financial sustainability, and create synergies with intersector services; and (iii) encourage household participation in improving health services and education through supply-side support by means of community intervention strategies.
(i) la consolidación técnico-operativa y ampliación de cobertura del programa de transferencias condicionadas de PRAF, y su articulación con la RPS; (ii) el diseño e implementación de un esquema gradual de intervenciones que permita un enfoque integral, la sostenibilidad financiera del Programa, y genera sinergias con la oferta de servicios intersectoriales; y (iii) promover la participación de los hogares en el mejoramiento de servicios de salud, educación mediante un esquema de acompañamiento de la oferta a través de estrategias de intervención comunitaria.
PROGRAMA DE ASIGNACION FAMILIAR
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SOCIAL INVESTMENT
INVERSIONES SOCIALES
1958286
Disbursement in forth quarter of 2010
4569334
Disbursement in forth quarter of 2010
1362627
Disbursement in second quarter of 2011
3179463
Disbursement in second quarter of 2011
2776.48
Interest repayment in second quarter of 2011
89774.27
Interest repayment in second quarter of 2011
625800
Disbursement in second quarter of 2011
1460200
Disbursement in second quarter of 2011
1271460
Disbursement in third quarter of 2011
2966740
Disbursement in third quarter of 2011
5131.35
Interest repayment in forth quarter of 2011
159644.64
Interest repayment in forth quarter of 2011
216446.7
Disbursement in first quarter of 2012
505042.3
Disbursement in first quarter of 2012
7076.19
Interest repayment in second quarter of 2012
190949.81
Interest repayment in second quarter of 2012
565380.3
Disbursement in second quarter of 2012
1319220.7
Disbursement in second quarter of 2012
7456.03
Interest repayment in forth quarter of 2012
192707.87
Interest repayment in forth quarter of 2012
7432.4
Interest repayment in second quarter of 2013
192760.66
Interest repayment in second quarter of 2013
7561.64
Interest repayment in forth quarter of 2013
185946.84
Interest repayment in forth quarter of 2013
7438.36
Interest repayment in second quarter of 2014
175678.9
Interest repayment in second quarter of 2014
7561.64
Interest repayment in forth quarter of 2014
174129.32
Interest repayment in forth quarter of 2014
7438.36
Interest repayment in second quarter of 2015
164689.86
Interest repayment in second quarter of 2015
7561.64
Interest repayment in forth quarter of 2015
162131.51
Interest repayment in forth quarter of 2015
297872.34
Loan repayment in forth quarter of 2015
7464.97
Interest repayment in second quarter of 2016
187142.23
Interest repayment in second quarter of 2016
297872.34
Loan repayment in second quarter of 2016
7540.98
Interest repayment in forth quarter of 2016
177104.63
Interest repayment in forth quarter of 2016
297872.34
Loan repayment in forth quarter of 2016
175040.39
Interest repayment in second quarter of 2017
297872.34
Loan repayment in second quarter of 2017
180760.77
Interest repayment in forth quarter of 2017
297872.34
Loan repayment in forth quarter of 2017
183128.85
Interest repayment in second quarter of 2018
297872.34
Loan repayment in second quarter of 2018
203541.4
Interest repayment in forth quarter of 2018
297872.34
Loan repayment in forth quarter of 2018
224318.8
Interest repayment in second quarter of 2019
297872.34
Loan repayment in second quarter of 2019
240026.19
Interest repayment in forth quarter of 2019
297872.34
Loan repayment in forth quarter of 2019
222478.97
Interest repayment in second quarter of 2020
297872.34
Loan repayment in second quarter of 2020
189723.04
Interest repayment in forth quarter of 2020
297872.34
Loan repayment in forth quarter of 2020
163653.21
Interest repayment in second quarter of 2021
297872.34
Loan repayment in second quarter of 2021
158350.82
Interest repayment in forth quarter of 2021
297872.34
Loan repayment in forth quarter of 2021
158679
Interest repayment in second quarter of 2022
297872.34
Loan repayment in second quarter of 2022
160747.43
Interest repayment in forth quarter of 2022
297872.34
Loan repayment in forth quarter of 2022
185055.79
Interest repayment in second quarter of 2023
297872.34
Loan repayment in second quarter of 2023
218024.44
Interest repayment in forth quarter of 2023
297872.34
Loan repayment in forth quarter of 2023
Rapport pour Publication_PMR-_HO-L1032-2012-1º-Período [37352851].PDF
HO-L1032 [36320803].PDF
Relatório para publicação_PMR-_HO-L1032-2011-2º-Período [37297807].PDF
Report for Publication_PMR-_HO-L1032-2011-2º-Period [37298385].PDF
Rapport pour Publication_PMR-_HO-L1032-2011-1º-Período [36624631].PDF
ADQUISICIÓN DE OCHO VEHICULOS PICK UP Transport [35532115].PDF
Relatório para publicação_PMR-_HO-L1032-2011-1º-Período [36624050].PDF
Relatório para publicação_PMR-_HO-L1032-2012-2º-Período [37873294].PDF
Informe para Publicación_PMR-_HO-L1032-2011-1º-Periodo [36625186].PDF
Report for Publication_PMR-_HO-L1032-2011-1º-Period [36625748].PDF
Informe para Publicación_PMR-_HO-L1032-2012-2º-Periodo [37874622].PDF
Report for Publication_PMR-_HO-L1032-2012-2º-Period [37875447].PDF
Informe para Publicación_PMR-_HO-L1032-2010-2º-Periodo [36312775].PDF
Programa de Apoyo Integral a la Red de Protección Social (HO-L1032) [1906166].PDF
Report for Publication_PMR-_HO-L1032-2010-2º-Period [36313349].PDF
Integrated Support for the Social Safety Net Program (HO-L1032) [1919134].PDF
Informe para Publicación_PMR-_HO-L1032-2012-1º-Periodo [37353507].PDF
HO-L1032 [36346013].PDF
Programa de Apoyo Integral a la Red de Protección Social - Informe de Terminación de Proyecto [38917094].PDF
Report for Publication_PMR-_HO-L1032-2012-1º-Period [37354171].PDF
Informe para Publicación_PMR-_HO-L1032-2011-2º-Periodo [37298189].PDF
Contrato - Primer Programa de Apoyo Integral a la Red de Protección Social.pdf
Relatório para publicação_PMR-_HO-L1032-2010-2º-Período [36310287].PDF
HO-L1032_pdf [35873108].PDF
Rapport pour Publication_PMR-_HO-L1032-2012-2º-Período [37873962].PDF
Rapport pour Publication_PMR-_HO-L1032-2011-2º-Período [37297999].PDF
Rapport pour Publication_PMR-_HO-L1032-2010-2º-Período [36312188].PDF
Relatório para publicação_PMR-_HO-L1032-2012-1º-Período [37352186].PDF
XI-IATI-IADB-HO-L1013
Inter-American Development Bank
Multiphase Program of Road Rehabiltation in Sections of the PPP Touristic Corrid
Multifase de Rehabilitación de Tramos del Corredor Turístico del PPP
The general objective of the I multiphase program is to improve the efficiency and safety conditions of the San Pedro Sula - Trujillo road corridor, which will contribute to the sustainable economic development of the country's norther region. The specific objectivves include facilitating fluid, safe, predictable transit of the orad in any season of the year, while reducing transportation costs and travel times, by improving the capacity and rehabilitating the primary road connecting the country's commercial hub with the Caribbean zone, which has the best conditions in Honduras for investment in tourism infrastructure.
El objetivo general del Programa es posibilitar el desarrollo sostenido y sustentable del sector turismo en Honduras, mediante una ampliación de la integración de los Departamentos del Norte-Este al sistema económico nacional y a los mercados de turismo internacional. El objetivo específico del Proyecto es mejorar la conexión vial entre San Pedro Sula y Trujillo, de manera de permitir el tránsito fluido, permanente, seguro, y con menores costos de transporte y tiempos de viaje. La primera Fase del Programa financiará la rehabilitación del tramo El Progreso - Tela.
BLENDED LOANS
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Diseño de obras de reparación de fallas realizado Multifase de Rehabilitación de Tramos del Corredor Turístico del PPP, Honduras
14.824173968, -86.600264243
TRANSPORT
TRANSPORTE
20000
Disbursement in second quarter of 2010
29504.62
Disbursement in third quarter of 2010
68844.12
Disbursement in third quarter of 2010
600568.75
Disbursement in third quarter of 2010
1401327.09
Disbursement in third quarter of 2010
700000
Disbursement in third quarter of 2010
20000
Disbursement in third quarter of 2010
128.22
Interest repayment in forth quarter of 2010
494.8
Interest repayment in forth quarter of 2010
16255.97
Interest repayment in forth quarter of 2010
20000
Disbursement in forth quarter of 2010
4399.45
Interest repayment in second quarter of 2011
781.12
Interest repayment in second quarter of 2011
25154.83
Interest repayment in second quarter of 2011
671678.05
Disbursement in second quarter of 2011
495131.78
Disbursement in third quarter of 2011
1155307.49
Disbursement in third quarter of 2011
6018.67
Interest repayment in forth quarter of 2011
1211.2
Interest repayment in forth quarter of 2011
37423.02
Interest repayment in forth quarter of 2011
703152.6
Disbursement in forth quarter of 2011
1640689.4
Disbursement in forth quarter of 2011
2144559
Disbursement in forth quarter of 2011
2373927.26
Disbursement in second quarter of 2012
14550.36
Interest repayment in second quarter of 2012
2231.02
Interest repayment in second quarter of 2012
58645.92
Interest repayment in second quarter of 2012
588.89
Interest repayment in third quarter of 2012
536776.2
Disbursement in forth quarter of 2012
1252477.8
Disbursement in forth quarter of 2012
31177.77
Interest repayment in forth quarter of 2012
624609
Disbursement in forth quarter of 2012
1457421
Disbursement in forth quarter of 2012
2297.94
Interest repayment in forth quarter of 2012
57229.09
Interest repayment in forth quarter of 2012
2297.94
Interest repayment in forth quarter of 2012
3132436.63
Disbursement in forth quarter of 2012
7309018.79
Disbursement in forth quarter of 2012
1687954.37
Disbursement in first quarter of 2013
3938560.21
Disbursement in first quarter of 2013
29048.05
Interest repayment in second quarter of 2013
8308.83
Interest repayment in second quarter of 2013
215286.18
Interest repayment in second quarter of 2013
4155000
Disbursement in second quarter of 2013
9695000
Disbursement in second quarter of 2013
34866.05
Disbursement in third quarter of 2013
81354.1
Disbursement in third quarter of 2013
270.82
Interest repayment in forth quarter of 2013
59385.57
Interest repayment in forth quarter of 2013
99155.66
Loan repayment in forth quarter of 2013
14412.09
Interest repayment in forth quarter of 2013
351790.55
Interest repayment in forth quarter of 2013
58341.56
Interest repayment in second quarter of 2014
99155.66
Loan repayment in second quarter of 2014
14876.71
Interest repayment in second quarter of 2014
350713.42
Interest repayment in second quarter of 2014
.67
Interest repayment in forth quarter of 2014
57667.84
Interest repayment in forth quarter of 2014
99155.66
Loan repayment in forth quarter of 2014
15122.98
Interest repayment in forth quarter of 2014
347698.51
Interest repayment in forth quarter of 2014
595733.48
Loan repayment in forth quarter of 2014
56358.45
Interest repayment in second quarter of 2015
99155.66
Loan repayment in second quarter of 2015
14876.42
Interest repayment in second quarter of 2015
321374.18
Interest repayment in second quarter of 2015
595732.14
Loan repayment in second quarter of 2015
55673.87
Interest repayment in forth quarter of 2015
99155.65
Loan repayment in forth quarter of 2015
15122.99
Interest repayment in forth quarter of 2015
309929.58
Interest repayment in forth quarter of 2015
595732.81
Loan repayment in forth quarter of 2015
54580.26
Interest repayment in second quarter of 2016
99155.67
Loan repayment in second quarter of 2016
14926.95
Interest repayment in second quarter of 2016
359885.67
Interest repayment in second quarter of 2016
595732.81
Loan repayment in second quarter of 2016
53544.06
Interest repayment in forth quarter of 2016
99155.65
Loan repayment in forth quarter of 2016
15081.67
Interest repayment in forth quarter of 2016
339931
Interest repayment in forth quarter of 2016
595732.81
Loan repayment in forth quarter of 2016
52355.01
Interest repayment in second quarter of 2017
99155.67
Loan repayment in second quarter of 2017
333791.94
Interest repayment in second quarter of 2017
595732.81
Loan repayment in second quarter of 2017
51702.21
Interest repayment in forth quarter of 2017
99155.66
Loan repayment in forth quarter of 2017
346926.25
Interest repayment in forth quarter of 2017
595732.81
Loan repayment in forth quarter of 2017
50430.84
Interest repayment in second quarter of 2018
99155.66
Loan repayment in second quarter of 2018
350536.76
Interest repayment in second quarter of 2018
595732.81
Loan repayment in second quarter of 2018
49713.66
Interest repayment in forth quarter of 2018
99155.66
Loan repayment in forth quarter of 2018
391316.02
Interest repayment in forth quarter of 2018
595732.81
Loan repayment in forth quarter of 2018
48453.16
Interest repayment in second quarter of 2019
99155.66
Loan repayment in second quarter of 2019
430736.76
Interest repayment in second quarter of 2019
595732.81
Loan repayment in second quarter of 2019
47725.11
Interest repayment in forth quarter of 2019
99155.66
Loan repayment in forth quarter of 2019
457722.6
Interest repayment in forth quarter of 2019
595732.81
Loan repayment in forth quarter of 2019
46650.6
Interest repayment in second quarter of 2020
99155.66
Loan repayment in second quarter of 2020
420188.94
Interest repayment in second quarter of 2020
595732.81
Loan repayment in second quarter of 2020
45606.18
Interest repayment in forth quarter of 2020
99155.66
Loan repayment in forth quarter of 2020
355562.5
Interest repayment in forth quarter of 2020
595732.81
Loan repayment in forth quarter of 2020
44441.54
Interest repayment in second quarter of 2021
99155.66
Loan repayment in second quarter of 2021
308352.83
Interest repayment in second quarter of 2021
595732.81
Loan repayment in second quarter of 2021
43737.16
Interest repayment in forth quarter of 2021
99155.66
Loan repayment in forth quarter of 2021
299550.96
Interest repayment in forth quarter of 2021
595732.81
Loan repayment in forth quarter of 2021
42520.12
Interest repayment in second quarter of 2022
99155.66
Loan repayment in second quarter of 2022
300718.82
Interest repayment in second quarter of 2022
595732.81
Loan repayment in second quarter of 2022
41759.47
Interest repayment in forth quarter of 2022
99155.66
Loan repayment in forth quarter of 2022
303052.9
Interest repayment in forth quarter of 2022
595732.81
Loan repayment in forth quarter of 2022
40542.44
Interest repayment in second quarter of 2023
99155.66
Loan repayment in second quarter of 2023
353366.91
Interest repayment in second quarter of 2023
595732.81
Loan repayment in second quarter of 2023
39770.93
Interest repayment in forth quarter of 2023
99155.66
Loan repayment in forth quarter of 2023
412671.81
Interest repayment in forth quarter of 2023
595732.81
Loan repayment in forth quarter of 2023
Informe para Publicación_PMR-_HO-L1013-2012-1º-Periodo [37353500].PDF
Rapport pour Publication_PMR-_HO-L1013-2011-2º-Período [36922696].PDF
Report for Publication_PMR-_HO-L1013-2012-2º-Period [37875441].PDF
HO-L1013 [36509760].PDF
CONSULTORÍA_ APOYO PARA LA LIBERACIÓN DEL DERECHO DE VÍA, TRAMO_ EL PROGRESO-TELA Consultants [35532133].PDF
Informe para Publicación_PMR-_HO-L1013-2010-2º-Periodo [36312768].PDF
Relatório para publicação_PMR-_HO-L1013-2011-2º-Período [36918688].PDF
Report for Publication_PMR-_HO-L1013-2012-1º-Period [37354163].PDF
Rapport pour Publication_PMR-_HO-L1013-2012-1º-Período [37352843].PDF
Relatório para publicação_PMR-_HO-L1013-2012-1º-Período [37352180].PDF
Rapport pour Publication_PMR-_HO-L1013-2012-2º-Período [37873956].PDF
Informe para Publicación_PMR-_HO-L1013-2012-2º-Periodo [37874616].PDF
Informe para Publicación_PMR-_HO-L1013-2011-1º-Periodo [36625179].PDF
Rapport pour Publication_PMR-_HO-L1013-2010-2º-Período [36312181].PDF
Honduras_ Multifase de Rehabilitación de Tramos del Corredor Turístico del PPP - Fase I [1231813].PDF
HO-L1013 [36514991].PDF
Relatório para publicação_PMR-_HO-L1013-2013-1º-Período [38265511].PDF
Report for Publication_PMR-_HO-L1013-2010-2º-Period [36313342].PDF
Report for Publication_PMR-_HO-L1013-2013-1º-Period [38267514].PDF
Informe para Publicación_PMR-_HO-L1013-2011-2º-Periodo [36925281].PDF
Relatório para publicação_PMR-_HO-L1013-2010-2º-Período [36310280].PDF
Report for Publication_PMR-_HO-L1013-2011-1º-Period [36625741].PDF
Rapport pour Publication_PMR-_HO-L1013-2013-1º-Período [38266175].PDF
Informe para Publicación_PMR-_HO-L1013-2013-1º-Periodo [38266840].PDF
HO-L1013 Second period Jan-Dec 2013-Public Report [40174719].PDF
Relatório para publicação_PMR-_HO-L1013-2011-1º-Período [36624043].PDF
Honduras_ Multiphase Program for Road Rehabilitation of Sections of the PPP Tourism Corridor - Phase I [1231814].PDF
Rapport pour Publication_PMR-_HO-L1013-2011-1º-Período [36624624].PDF
Relatório para publicação_PMR-_HO-L1013-2012-2º-Período [37873288].PDF
Report for Publication_PMR-_HO-L1013-2011-2º-Period [36928021].PDF
Administración del Programa
Administración del Programa
Evaluación y Auditoria Realizada
Evaluación y Auditoria Realizada
Evaluación y Auditoria Realizada
Evaluación y Auditoria Realizada
Evaluación y Auditoria Realizada
Evaluación y Auditoria Realizada
Apoyo en obras de emergencia y reconstrucción por Depresión Tropical No. 16
Apoyo en obras de emergencia y reconstrucción por Depresión Tropical No. 16
Reparación de falla Est. 6+500 realizada
Reparación de falla Est. 6+500 realizada
Supervisión de falla Est. 6+500 realizada.
Supervisión de falla Est. 6+500 realizada.
Diseño y rehabilitación de puentes y obras de protección realizada.
Diseño y rehabilitación de puentes y obras de protección realizada.
Diseño de obras de reparación de fallas realizado
Diseño de obras de reparación de fallas realizado
Rehabilitación de Puente sobre Río Selguapa realizada.
Rehabilitación de Puente sobre Río Selguapa realizada.
XI-IATI-IADB-HO-L1201
Inter-American Development Bank
Comprehensive Rural Development and Productivity Project
Proyecto Integral de Desarrollo Rural y Productividad.
The project's general objective is to sustainably increase the income of the beneficiary rural households in the Dry Corridor of Honduras. Its specific objective is to improve productive development in the project's target area by providing technologies, production-related technical assistance, and access to financing for the beneficiary population.
El objetivo general consiste en incrementar de manera sostenible los ingresos de los hogares rurales beneficiarios en el Corredor Seco de Honduras (CSH). El objetivo específico es la mejora en el desarrollo productivo en la zona de intervención mediante la provisión de tecnologías, asistencia técnica productiva y acceso al financiamiento de la población beneficiaria.
BLENDED LOANS
SECRETARIA DE AGRICULTURA Y GANADERIA
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
BOULEVARD MIRAFLORES AV LA FAO , ,TEGUCIGALPA, , BOULEVARD MIRAFLORES AV LA FAO, SECRETARIA DE AGRICULTURA Y GANADERIA, Honduras
14.824173968, -86.600264243
PRIVATE FIRMS AND SME DEVELOPMENT
EMPRESAS PRIV Y DESARROLLO DE PYME
290969.0
303840.0
316711.0
329160.0
341398.0
353003.0
363975.0
374525.0
384020.0
392671.0
400478.0
407230.0
412505.0
416936.0
419679.0
421367.0
421578.0
420734.0
418202.0
414404.0
409762.0
403432.0
396047.0
387818.0
378745.0
368406.0
357856.0
346251.0
334435.0
321986.0
309326.0
296455.0
283584.0
270502.0
257842.0
244760.0
232311.0
220073.0
208046.0
196441.0
185047.0
174075.0
163947.0
153608.0
144113.0
135040.0
126389.0
118160.0
110353.0
102968.0
96005.0
89253.0
83345.0
1188234.0
4402000
Disbursement in forth quarter of 2021
13548.39
Interest repayment in second quarter of 2022
31398.71
Interest repayment in forth quarter of 2022
48178.87
Interest repayment in second quarter of 2023
54801.76
Interest repayment in forth quarter of 2023
HO-L1201 - POD_Analisis Economico.docx
HO-L1211_SPF _ SSF.pdf
EEO13 Programas de la Alianza para el Corredor Seco y Marco Institucional.docx
HO-L1201 Second period Jan-Dec 2019-Public Report.pdf
EEO5 Desarrollo Productivo Sostenible (DPR).docx
HO-L1201 First period Jan-Jun 2022 - Public Report.PDF
Comprehensive Rural Development and Productivity Project - ORC.pdf
Proyecto Integral de Desarrollo Rural y Productividad.pdf
HO-L1201 Second period Jan-Dec 2022 - Public Report.PDF
POD - Plan de Adquisiciones - HO-L1201.xlsx
HO-L1201_P532467_GN.pdf
HO-L1201_P777282_SP.pdf
HO-L1201 First period Jan-Jun 2020 - Public Report.pdf
POD - IGAS - HO-L1201.docx
EEO7 Tecnologias de Informacion y Comunicacion (TIC).doc
EEO13 Referencias Bibliograficas Electronicas.doc
Propuesta de Prestamo - Proyecto Integral de Desarrollo Rural y Productividad HO-L1201 y HO-L1211.pdf
POD - Analisis de cadena de Valor - HO-L1201.pdf
EEO4 Analisis de Demanda.docx
HO-L1201 Second period Jan-Dec 2021 - Public Report.PDF
EEO10 Anexo Comparativo de Productividad.doc
EEO3 Reglamento Operativo del Programa - HO-L1201.doc
HO-L1201 First period Jan-Jun 2023 - Public Report.PDF
HO-L1201_SPF_20190923_1222.pdf
HO-L1201 Second period Jan-Dec 2020 - Public Report.pdf
Loan Proposal_ Disclosure (Inglés) - HO-L1201.pdf
POD - PEP-POA - HO-L1201.pdf
EEO6 Consideración de Género e Inclusión de la Juventud (CGJ).docx
HO-L1201 - POD_Plan de Monitoreo y Evaluacion.docx
EEO8 Experiencias y Lecciones Aprendidas en Proyectos de Desarrollo Integral (ELA).docx
HO-L1201 First period Jan-Jun 2021 - Public Report.pdf
EEO9 Anexo de Cambio Climatico.docx
EEO11 Caracterizacion de Clusteres.docx
XI-IATI-IADB-HO-L1117
Inter-American Development Bank
CIUDAD MUJER
Ciudad Mujer
The general objective is to improve the living conditions of Honduran women aged 15 and
older in terms of labor force participation, sexual and reproductive health, prevention of and response to violence against
women, and prevention of adolescent pregnancy. The specific objectives for the target departments are to: (i) increase the
percentage of women aged 15 and older who are participating in the labor force; (ii) reduce the maternal mortality rate and
the breast cancer and cervical-uterine cancer mortality rates in women aged 15 and older; (iii) reduce the prevalence of
violence (physical or sexual violence committed by a partner, as well as homicides) against women aged 15 and older;
(iv) reduce the pregnancy rate among adolescents aged 15 to 19; and (v) expand the coverage of specialized and
integrated services for women aged 15 and older by creating and/or strengthening Ciudad Mujer Centers in the departments
of Francisco Morazán, Cortés, Olancho, and Atlántida.
El objetivo general del Proyecto es mejorar las condiciones de vida de las mujeres
de 15 años o más de edad en Honduras en términos de su participación laboral, salud sexual y reproductiva, prevención
y atención a la violencia contra las mujeres, y prevención del embarazo en adolescentes. Los objetivos específicos para
los departamentos objetivo son: (i) incrementar el porcentaje de mujeres mayores a 15 años de edad que participan en
la fuerza laboral; (ii) reducir la tasa de mortalidad materna y por cáncer de mama y cérvico-uterino en mujeres de 15
años o más; (iii) reducir la prevalencia de violencia (física o sexual ejercida por la pareja y homicidios) contra mujeres de
15 años o más; (iv) reducir la tasa del embarazo en adolescentes de 15 a 19 años; y (v) ampliar la cobertura de la
atención especializada e integrada para las mujeres de 15 años o más mediante la creación y/o fortalecimiento de
Centros Ciudad Mujer en los departamentos de Francisco Morazán, Cortés, Olancho y Atlántida
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
SECRETARÍA DE DESARROLLO E INCLUSIÓN SOCIAL, GOBIERNO DE LA REPÚBLICA DE HONDURA
Inter-American Development Bank
Actual start
Planned end
Planned start
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Centros CM construidos Ciudad Mujer, Honduras
14.824173968, -86.600264243
SOCIAL INVESTMENT
INVERSIONES SOCIALES
600000
Disbursement in third quarter of 2017
118250
Disbursement in third quarter of 2017
2300000
Disbursement in forth quarter of 2017
11502.23
Interest repayment in first quarter of 2018
262000
Disbursement in first quarter of 2018
4870400
Disbursement in second quarter of 2018
48428.96
Interest repayment in third quarter of 2018
256000
Disbursement in forth quarter of 2018
2626600
Disbursement in forth quarter of 2018
96917.83
Interest repayment in first quarter of 2019
3617900
Disbursement in second quarter of 2019
174865.36
Interest repayment in third quarter of 2019
260000
Disbursement in third quarter of 2019
795900
Disbursement in third quarter of 2019
181633.95
Interest repayment in first quarter of 2020
200000
Disbursement in first quarter of 2020
181397.83
Interest repayment in third quarter of 2020
1810000
Disbursement in third quarter of 2020
183572.73
Interest repayment in first quarter of 2021
250000
Disbursement in first quarter of 2021
630700
Disbursement in second quarter of 2021
545500
Disbursement in second quarter of 2021
192513.89
Interest repayment in third quarter of 2021
500000
Disbursement in forth quarter of 2021
197936.82
Interest repayment in first quarter of 2022
203853.32
Interest repayment in third quarter of 2022
356750
Disbursement in forth quarter of 2022
356750
Disbursement in forth quarter of 2022
250420.96
Interest repayment in first quarter of 2023
249789.45
Loan repayment in first quarter of 2023
269988.82
Interest repayment in third quarter of 2023
249789.45
Loan repayment in third quarter of 2023
271747.73
Interest repayment in first quarter of 2024
249384.42
Loan repayment in first quarter of 2024
HO-L1117 First period Jan-Jun 2021 - Public Report.pdf
HO-L1117 Second period Jan-Dec 2021 - Public Report.PDF
HO-L1117_P956079_SP.pdf
HO-L1117 First period Jan-Jun 2023 - Public Report.PDF
HO-L1117 Second period Jan-Dec 2017-Public Report.pdf
HO-L1117 Second period Jan-Dec 2018-Public Report.pdf
PROPUESTA DE PRESTAMO_ Enlace Requerido_ Plan de Monitoreo y Evaluación (HO-L1117) [40489238].PDF
HO-L1117 First period Jan-Jun 2018-Public Report.pdf
Propuesta de Préstamo_ Enlace Opcional_ Filtros SPF y SSF (HO-L1117) [40489235].PDF
HO-L1117 First period Jan-Jun 2020 - Public Report.pdf
HO-L1117 First period Jan-Jun 2022 - Public Report.PDF
HO-L1117 First period Jan-Jun 2019-Public Report.pdf
HO-L1117 Second period Jan-Dec 2016-Public Report.pdf
HO-L1117_6079_1_SP.pdf
Propuesta de Préstamo_ Enlace Opcional_ Metodología de Selección para las Localización de los Centros Ciudad Mu [40489249].PDF
HO-L1117 Second period Jan-Dec 2022 - Public Report.PDF
Propuesta de Préstamo_ Enlace Opcional_ Matriz de Lógica Vertical del Proyecto (HO-L1117) [40489252].XLSX
Propuesta de Préstamo_ Enlace Opcional_ Entidades Participantes en el Programa Ciudad Mujer (HO-L1117) [40388257].PDF
Propuesta de Préstamo_ Enlace Opcional_ Resumen de Nota de Políitca de Género en Honduras (HO-L1117) [40388210].PDF
Propuesta de Préstamo - Anexo I_ DEM validado (HO-L1117) [40544923].PDF
Propuesta de Préstamo_ Enlace Opcional_ Presupuesto Detallado (HO-L1117) [40489247].XLSX
Propuesta de Préstamo_ Anexo III_ Acuerdos y Requisitos Fiduciarios (HO-L1117) [40608801].PDF
Propuesta de Préstamo_ Enlace Opcional_ Análisis Econométrico de Factores Causales (HO-L1117) [40394530].PDF
HO-L1117 Second period Jan-Dec 2020 - Public Report.pdf
HO-L1117 First period Jan-Jun 2017-Public Report.pdf
Propuesta de Préstamo_ Anexo II, Matriz de Resultados (HO-L1117) [40489234].PDF
Propuesta de Préstamo_ Enlace Opcional_ Compendio de Notas de Pie de Página (HO-L1117) [40544847].PDF
Propuesta de Préstamo_ Enlace Opcional_ Manual Operativo del Proyecto (HO-L1117) [40489255].PDF
HO-L1117 Second period Jan-Dec 2019-Public Report.pdf
Honduras_ Propuesta de préstamo para el proyecto Ciudad Mujer (HO-L1117) [40701437].PDF
Propuesta de Préstamo_ Enlace Opcional_ Instancias de Coordinación Interinstitucional del Programa (HO-L1117 [40388258].PDF
PROPUESTA DE PRESTAMO_ Enlace Requerido_ Plan Operativo Anual (HO-L1117) [40489244].PDF
Propuesta de Préstamo_ Enlace IGAS, (HO-L1117) [40489239].PDF
Contrato - Ciudad Mujer.pdf
Honduras_ Proposal for a loan for the project Ciudad Mujer (HO-L1117) [40701436].PDF
Propuesta de Préstamo_ Enlace Opcional_ Evaluación de la Capacidad Institucional (HO-L1117) [40489270].PDF
Propuesta de Préstamo_ Enlace Opcional_ Elementos para el Análisis de la Sostenibilidad Fiscal (HO-L1117) [40544991].PDF
Componente 1. Atención integral para el empleo y la generación de ingresos de las mujeres.
Componente 1. Atención integral para el empleo y la generación de ingresos de las mujeres.
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas por servicios de bolsas de empleo
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas en asistencias técnicas empresariales
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas en asistencias técnicas empresariales
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres que completan los cursos de educación financiera
Mujeres que completan los cursos de educación financiera
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas por servicios de bolsas de empleo
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan los cursos de educación financiera
Mujeres que completan los cursos de educación financiera
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas en asistencias técnicas empresariales
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres atendidas en asistencias técnicas empresariales
Mujeres atendidas en asistencias técnicas empresariales
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan los cursos de educación financiera
Mujeres que completan los cursos de educación financiera
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas por servicios de bolsas de empleo
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan los cursos de educación financiera
Mujeres que completan los cursos de educación financiera
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan cursos de formación técnica vocacional (en aula)
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres que completan cursos de capacitación (micro)empresarial
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres con créditos aprobados
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres que completan capacitación en habilidades para la vida en el MAE
Mujeres atendidas por servicios de bolsas de empleo
Mujeres atendidas por servicios de bolsas de empleo
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de nivelación de estudios (alfabetización, básico y medio)
Mujeres que completan los cursos de educación financiera
Mujeres que completan los cursos de educación financiera
Componente 2. Atención integral en salud sexual y reproductiva (SSR) para las mujeres.
Componente 2. Atención integral en salud sexual y reproductiva (SSR) para las mujeres.
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan una citología
Mujeres que se realizan una citología
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan una colposcopia
Mujeres que se realizan una colposcopia
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan una citología
Mujeres que se realizan una citología
Mujeres que se realizan una colposcopia
Mujeres que se realizan una colposcopia
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan una colposcopia
Mujeres que se realizan una colposcopia
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan una citología
Mujeres que se realizan una citología
Mujeres que se realizan una citología
Mujeres que se realizan una citología
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles postnatales
Mujeres que se realizan controles postnatales
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles prenatales
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan controles pre-concepcionales Pendiente DNCM
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan controles de planificación familiar
Mujeres que se realizan una mamografía
Mujeres que se realizan una mamografía
Componente 3. Atención integral a la violencia contra la mujer (VCM).
Componente 3. Atención integral a la violencia contra la mujer (VCM).
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Protocolo interinstitucional para la atención integral a casos de VCM con entidades externas en los territorios diseñado y funcionando
Protocolo interinstitucional para la atención integral a casos de VCM con entidades externas en los territorios diseñado y funcionando
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de hombres capacitados en programas comunitarios de prevención de la violencia de género
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Mujeres atendidas al Módulo de atención a la violencia contra las mujeres (MVCM) por primera vez
Sistema de referencias y contra referencias implementado en los territorios de CM y funcionando
Sistema de referencias y contra referencias implementado en los territorios de CM y funcionando
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Mujeres atendidas en los CCM con planes de vida y seguridad elaborados
Componente 4. Atención integral a mujeres adolescentes.
Componente 4. Atención integral a mujeres adolescentes.
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que son atendidas por el módulo de SSR
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes que reciben atención psicológica en el MAA
Mujeres adolescentes que reciben atención psicológica en el MAA
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Número de jóvenes hombres capacitados en programas comunitarios de prevención de la violencia de género
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes certificadas en cursos de formación técnico vocacional del MAE
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Mujeres adolescentes que han finalizado los talleres sobre habilidades para la vida/habilidades socioemocionales con enfoque de derechos humanos y de género en el MAA
Funcionarias (personal de servicios) de CM capacitadas en atención amigable y estrategias efectivas de alcance a adolescentes
Funcionarias (personal de servicios) de CM capacitadas en atención amigable y estrategias efectivas de alcance a adolescentes
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes que han completado las actividades de orientación vocacional del MAA
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes víctimas de VCM atendidas por el módulo de MVCM
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que cuentan con plan de vida formulado y registrado
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Mujeres adolescentes que reciben consejería preventiva en SSR integral en el MAA.
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Número de jóvenes mujeres capacitadas en programas comunitarios de prevención de la violencia de género
Componente 5. Ampliación y fortalecimiento del Programa Ciudad Mujer (CM)
Componente 5. Ampliación y fortalecimiento del Programa Ciudad Mujer (CM)
Estrategia de Comunicación de CM implementada
Estrategia de Comunicación de CM implementada
Estrategia de Comunicación de CM implementada
Estrategia de Comunicación de CM implementada
Funcionarias capacitadas en la capacitación de inducción
Funcionarias capacitadas en la capacitación de inducción
Estrategia de Comunicación de CM implementada
Estrategia de Comunicación de CM implementada
Funcionarias capacitadas en la capacitación de inducción
Funcionarias capacitadas en la capacitación de inducción
Centros CM construidos
Centros CM construidos
Centros CM equipados y funcionando
Centros CM equipados y funcionando
XI-IATI-IADB-HO-L1079
Inter-American Development Bank
Support Prog. for Reform of Pension Institutions and the HHRR Management System
Prog. de Apoyo a la Ref. de los Inst. Prev. y del Sist. de Gestión de RRHH
The specific objectives are to support efforts by the Government of Honduras to reform its pension institutions and to introduce improvements in systems for administrative and budgetary control over the central government¿s human resources so as to lay the groundwork for building a more equitable and sustainable pension system and for improving human resources management in the central government.
Los objetivos específicos son apoyar al Gobierno de Honduras en su esfuerzo por reformar los institutos previsionales e introducir mejoras en los sistemas de control administrativo y presupuestal de los recursos humanos de la Administración Central, con el fin de sentar las bases para construir un sistema de pensiones más equitativo y sostenible, y mejorar la gestión de los recursos humanos de la Administración Central.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
SECRETARIA DE FINANZAS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SOCIAL INVESTMENT
INVERSIONES SOCIALES
12000000
Disbursement in forth quarter of 2011
28000000
Disbursement in forth quarter of 2011
13607.68
Interest repayment in second quarter of 2012
423470.91
Interest repayment in second quarter of 2012
15000
Interest repayment in forth quarter of 2012
509600
Interest repayment in forth quarter of 2012
14953.96
Interest repayment in second quarter of 2013
535038.73
Interest repayment in second quarter of 2013
15041.1
Interest repayment in forth quarter of 2013
541880.54
Interest repayment in forth quarter of 2013
14958.9
Interest repayment in second quarter of 2014
540146.85
Interest repayment in second quarter of 2014
15041.1
Interest repayment in forth quarter of 2014
543284.38
Interest repayment in forth quarter of 2014
14958.9
Interest repayment in second quarter of 2015
540315.62
Interest repayment in second quarter of 2015
15041.1
Interest repayment in forth quarter of 2015
543284.38
Interest repayment in forth quarter of 2015
15004.94
Interest repayment in second quarter of 2016
621274.48
Interest repayment in second quarter of 2016
15000
Interest repayment in forth quarter of 2016
583800
Interest repayment in forth quarter of 2016
560140.31
Interest repayment in second quarter of 2017
558325.48
Interest repayment in forth quarter of 2017
571428.57
Loan repayment in forth quarter of 2017
538235.92
Interest repayment in second quarter of 2018
571428.57
Loan repayment in second quarter of 2018
529298.33
Interest repayment in forth quarter of 2018
571428.57
Loan repayment in forth quarter of 2018
515640.54
Interest repayment in second quarter of 2019
571428.57
Loan repayment in second quarter of 2019
507529.56
Interest repayment in forth quarter of 2019
571428.57
Loan repayment in forth quarter of 2019
495391.68
Interest repayment in second quarter of 2020
571428.57
Loan repayment in second quarter of 2020
484314.29
Interest repayment in forth quarter of 2020
571428.57
Loan repayment in forth quarter of 2020
482467.64
Interest repayment in second quarter of 2021
571428.57
Loan repayment in second quarter of 2021
475499.18
Interest repayment in forth quarter of 2021
571428.57
Loan repayment in forth quarter of 2021
461731.5
Interest repayment in second quarter of 2022
571428.57
Loan repayment in second quarter of 2022
453037.81
Interest repayment in forth quarter of 2022
571428.57
Loan repayment in forth quarter of 2022
434572.21
Interest repayment in second quarter of 2023
571428.57
Loan repayment in second quarter of 2023
425215.65
Interest repayment in forth quarter of 2023
571428.57
Loan repayment in forth quarter of 2023
Programa de Apoyo a la Reforma de los Institutos Previsionales y del Sistema de Gestión de Recursos Humanos pic [36503987].PDF
Contrato - Programa de Apoyo a la Reforma de los Institutos Previsionales y del Sistema de Gestión de Recursos Humanos.pdf
Support Program for the Reform of Pension Institutions and Human Resources Management pic [36504042].PDF
XI-IATI-IADB-HO-L1020
Inter-American Development Bank
Supplemental Financing Improvement PPP Atlantic Corridor
Financiamiento Suplementario Mejoramiento Corredor Atlántico del PPP
EN
Se mantienen los objetivos previstos para la operación original HO 0207: mejorar la competitividad de Honduras y apoyar el proceso de integración vial con los países del Plan Puebla Panamá (PPP), mejorar las condiciones del transporte de personas y mercancías en la carretera del Norte CA-5 y facilitar el comercio por vía terrestre entre los países que se conectan mediante el corredor del Atlántico del PPP (Honduras, México, Belice, Guatemala y El Salvador).
CUENTA DEL DESAFÍO DEL MILENIO HONDURAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
GO CONSULTORES S. DE R.L.
GO CONSULTORES S. DE R.L.
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRANSPORT
TRANSPORTE
300000
Disbursement in forth quarter of 2010
700000
Disbursement in forth quarter of 2010
314.38
Interest repayment in second quarter of 2011
10085.18
Interest repayment in second quarter of 2011
258205.36
Disbursement in third quarter of 2011
602479.18
Disbursement in third quarter of 2011
590.3
Interest repayment in forth quarter of 2011
18233.73
Interest repayment in forth quarter of 2011
1714606.86
Disbursement in forth quarter of 2011
4000749.34
Disbursement in forth quarter of 2011
2733.23
Interest repayment in second quarter of 2012
71583.49
Interest repayment in second quarter of 2012
1246451.33
Disbursement in second quarter of 2012
2908386.43
Disbursement in second quarter of 2012
1056935.55
Disbursement in third quarter of 2012
2466182.94
Disbursement in third quarter of 2012
2760551.1
Disbursement in forth quarter of 2012
6441285.9
Disbursement in forth quarter of 2012
4674.91
Interest repayment in forth quarter of 2012
121384.7
Interest repayment in forth quarter of 2012
9863.18
Interest repayment in second quarter of 2013
255773.66
Interest repayment in second quarter of 2013
1663249.8
Disbursement in second quarter of 2013
3880916.21
Disbursement in second quarter of 2013
11239.94
Interest repayment in forth quarter of 2013
274848.45
Interest repayment in forth quarter of 2013
11157.53
Interest repayment in second quarter of 2014
262994.79
Interest repayment in second quarter of 2014
11342.47
Interest repayment in forth quarter of 2014
260745.2
Interest repayment in forth quarter of 2014
446808.51
Loan repayment in forth quarter of 2014
11156.78
Interest repayment in second quarter of 2015
240927.23
Interest repayment in second quarter of 2015
446755.95
Loan repayment in second quarter of 2015
11341.16
Interest repayment in forth quarter of 2015
232391.43
Interest repayment in forth quarter of 2015
446755.95
Loan repayment in forth quarter of 2015
11193.97
Interest repayment in second quarter of 2016
269974.78
Interest repayment in second quarter of 2016
446755.95
Loan repayment in second quarter of 2016
11310.17
Interest repayment in forth quarter of 2016
254987.3
Interest repayment in forth quarter of 2016
446755.95
Loan repayment in forth quarter of 2016
250218.76
Interest repayment in second quarter of 2017
446755.95
Loan repayment in second quarter of 2017
260331.83
Interest repayment in forth quarter of 2017
446755.95
Loan repayment in forth quarter of 2017
262940.55
Interest repayment in second quarter of 2018
446755.95
Loan repayment in second quarter of 2018
293668.39
Interest repayment in forth quarter of 2018
446755.95
Loan repayment in forth quarter of 2018
323217.73
Interest repayment in second quarter of 2019
446755.95
Loan repayment in second quarter of 2019
343353.53
Interest repayment in forth quarter of 2019
446755.95
Loan repayment in forth quarter of 2019
314974.09
Interest repayment in second quarter of 2020
446755.95
Loan repayment in second quarter of 2020
266380.96
Interest repayment in forth quarter of 2020
446755.95
Loan repayment in forth quarter of 2020
231107.91
Interest repayment in second quarter of 2021
446755.95
Loan repayment in second quarter of 2021
224606.17
Interest repayment in forth quarter of 2021
446755.95
Loan repayment in forth quarter of 2021
225665.69
Interest repayment in second quarter of 2022
446755.95
Loan repayment in second quarter of 2022
227241.3
Interest repayment in forth quarter of 2022
446755.95
Loan repayment in forth quarter of 2022
265340.8
Interest repayment in second quarter of 2023
446755.95
Loan repayment in second quarter of 2023
309817.21
Interest repayment in forth quarter of 2023
446755.95
Loan repayment in forth quarter of 2023
Rapport pour Publication_PMR-_HO-L1020-2010-2º-Período [36312185].PDF
HO-L1020_Second_period_Jan-Dec_2013-Public_Report [39813926].PDF
Relatório para publicação_PMR-_HO-L1020-2012-2º-Período [37873292].PDF
HO-L1020 Second period Jan-Dec 2014-Public Report [39824163].PDF
Informe para Publicación_PMR-_HO-L1020-2011-2º-Periodo [37298187].PDF
Informe para Publicación_PMR-_HO-L1020-2013-1º-Periodo [38266844].PDF
Rapport pour Publication_PMR-_HO-L1020-2012-1º-Período [37352849].PDF
Relatório para publicação_PMR-_HO-L1020-2011-2º-Período [37297805].PDF
Rapport pour Publication_PMR-_HO-L1020-2013-1º-Período [38266179].PDF
Relatório para publicação_PMR-_HO-L1020-2010-2º-Período [36310284].PDF
Rapport pour Publication_PMR-_HO-L1020-2012-2º-Período [37873960].PDF
SUPERVISION DE LAS OBRAS Roadways [35570933].PDF
Relatório para publicação_PMR-_HO-L1020-2013-1º-Período [38265515].PDF
HO-L1020 First period Jan-Jun 2015-Public Report (1) [40194303].PDF
Relatório para publicação_PMR-_HO-L1020-2012-1º-Período [37352184].PDF
Report for Publication_PMR-_HO-L1020-2011-2º-Period [37298382].PDF
Rapport pour Publication_PMR-_HO-L1020-2011-1º-Período [36624628].PDF
Honduras_ Financiamiento Suplementario para el Programa de Mejoramiento del Corredor Atlántico del Plan Puebla Pa [1231625].PDF
Rapport pour Publication_PMR-_HO-L1020-2011-2º-Período [37297997].PDF
Report for Publication_PMR-_HO-L1020-2010-2º-Period [36313346].PDF
Report for Publication_PMR-_HO-L1020-2013-1º-Period [38267518].PDF
Informe para Publicación_PMR-_HO-L1020-2010-2º-Periodo [36312772].PDF
HO-L1020 First period Jan-Jun 2014-Public Report [39823328].PDF
Report for Publication_PMR-_HO-L1020-2012-1º-Period [37354169].PDF
Informe para Publicación_PMR-_HO-L1020-2012-2º-Periodo [37874620].PDF
Relatório para publicação_PMR-_HO-L1020-2011-1º-Período [36624047].PDF
Report for Publication_PMR-_HO-L1020-2011-1º-Period [36625745].PDF
Informe para Publicación_PMR-_HO-L1020-2012-1º-Periodo [37353504].PDF
Honduras_ Supplemental Financing for Improvement of the Puebla-Pana Plan's Atlantic Corridor (Sections of the CA- [1231627].PDF
Report for Publication_PMR-_HO-L1020-2012-2º-Period [37875445].PDF
Informe para Publicación_PMR-_HO-L1020-2011-1º-Periodo [36625183].PDF
XI-IATI-IADB-HO-L1055
Inter-American Development Bank
Puerto Cortés Customs Modernization
Modernización de la Aduana en Puerto Cortés
The project's objective is to align the office of Puerto Cortes and the effort made by the Government to constitute the port in regional logistics hub, offering services in customs operations of high quality and low cost for the administration and foreign trade operator ensuring proper control and quasi-fiscal and security and thereby supporting the improvement in competitiveness. Specific project objectives are: (i) strengthening technical and operational coordination of customs in Puerto Cortes, (ii) provision of infrastructure and operating equipment, as well as the massive use of technology aimed at improving control and facilitation of operations.
El objetivo general es fortalecer la Aduana de Puerto Cortés para que brinde servicios de calidad y bajo costo para el operador, garantice el control y la seguridad, alineándola con el esfuerzo del gobierno para lograr que Puerto Cortés sea un hub logístico regional competitivo. Son objetivos específicos: (i) fortalecer la capacidad de control y seguridad de la aduana para que Puerto Cortés pueda mantener su estatus de reconocimiento internacional como puerto seguro; (ii) mejorar la coordinación operativa para reducir costos logísticos; y (iii) mejorar la infraestructura y el equipamiento para garantizar una atención al usuario permanente y de calidad.
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS
BLENDED LOANS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRADE
COMERCIO
150000
Disbursement in second quarter of 2012
350000
Disbursement in second quarter of 2012
86.07
Interest repayment in third quarter of 2012
883.61
Interest repayment in third quarter of 2012
188.6
Interest repayment in first quarter of 2013
1800.19
Interest repayment in first quarter of 2013
185.96
Interest repayment in third quarter of 2013
2097.99
Interest repayment in third quarter of 2013
390000
Disbursement in forth quarter of 2013
910000
Disbursement in forth quarter of 2013
189.04
Interest repayment in first quarter of 2014
2029.52
Interest repayment in first quarter of 2014
784.31
Interest repayment in third quarter of 2014
8531.53
Interest repayment in third quarter of 2014
900000
Disbursement in forth quarter of 2014
2100000
Disbursement in forth quarter of 2014
3360000
Loan repayment in first quarter of 2015
1025.76
Interest repayment in first quarter of 2015
10672.49
Interest repayment in first quarter of 2015
1785.21
Interest repayment in third quarter of 2015
58061.53
Interest repayment in third quarter of 2015
1339418.7
Disbursement in forth quarter of 2015
3125310.3
Disbursement in forth quarter of 2015
3125310.3
Loan repayment in first quarter of 2016
2281.17
Interest repayment in first quarter of 2016
66990.71
Interest repayment in first quarter of 2016
3455.29
Interest repayment in third quarter of 2016
121794.74
Interest repayment in third quarter of 2016
220581.3
Disbursement in forth quarter of 2016
514689.7
Disbursement in forth quarter of 2016
121828.15
Interest repayment in first quarter of 2017
288.85
Interest repayment in second quarter of 2017
115394.13
Interest repayment in third quarter of 2017
148936.16
Loan repayment in third quarter of 2017
116150.54
Interest repayment in first quarter of 2018
148936.16
Loan repayment in first quarter of 2018
511.46
Interest repayment in second quarter of 2018
110910.5
Interest repayment in third quarter of 2018
147041.87
Loan repayment in third quarter of 2018
112118.38
Interest repayment in first quarter of 2019
147041.87
Loan repayment in first quarter of 2019
107756.53
Interest repayment in third quarter of 2019
147041.87
Loan repayment in third quarter of 2019
107035.79
Interest repayment in first quarter of 2020
147041.87
Loan repayment in first quarter of 2020
103201.33
Interest repayment in third quarter of 2020
147041.87
Loan repayment in third quarter of 2020
101925.48
Interest repayment in first quarter of 2021
147041.87
Loan repayment in first quarter of 2021
101371.7
Interest repayment in third quarter of 2021
147041.87
Loan repayment in third quarter of 2021
100056.07
Interest repayment in first quarter of 2022
147041.87
Loan repayment in first quarter of 2022
95876.2
Interest repayment in third quarter of 2022
147041.87
Loan repayment in third quarter of 2022
94972.77
Interest repayment in first quarter of 2023
147041.87
Loan repayment in first quarter of 2023
89458.07
Interest repayment in third quarter of 2023
147041.87
Loan repayment in third quarter of 2023
88591.52
Interest repayment in first quarter of 2024
147041.87
Loan repayment in first quarter of 2024
HO-L1055 [39997349].PDF
Relatório para publicação_PMR-_HO-L1055-2012-1º-Período [37352193].PDF
Informe para Publicación_PMR-_HO-L1055-2010-2º-Periodo [36312778].PDF
Report for Publication_PMR-_HO-L1055-2010-2º-Period [36313352].PDF
Contrato - Proyecto de Modernización de la Aduana de Puerto Cortés.pdf
HO-L1055 [39266500].PDF
HO-L1055 [40183702].PDF
Rapport pour Publication_PMR-_HO-L1055-2012-2º-Período [37873967].PDF
Relatório para publicação_PMR-_HO-L1055-2011-2º-Período [37297812].PDF
HO-L1055 [39368975].PDF
HO-L1055 [39625027].PDF
Relatório para publicação_PMR-_HO-L1055-2010-2º-Período [36310290].PDF
Informe para Publicación_PMR-_HO-L1055-2011-2º-Periodo [37298194].PDF
Rapport pour Publication_PMR-_HO-L1055-2010-2º-Período [36312191].PDF
HO-L1055 [40026450].PDF
HO-L1055 [40142571].PDF
Rapport pour Publication_PMR-_HO-L1055-2011-2º-Período [37298004].PDF
Relatório para publicação_PMR-_HO-L1055-2013-1º-Período [38265520].PDF
HO-L1055 [39184034].PDF
HO-L1055 First period Jan-Jun 2017-Public Report.pdf
Report for Publication_PMR-_HO-L1055-2013-1º-Period [38267523].PDF
Report for Publication_PMR-_HO-L1055-2012-1º-Period [37354177].PDF
Rapport pour Publication_PMR-_HO-L1055-2012-1º-Período [37352856].PDF
HO-L1055_ Modernización de la Aduana de Puerto Cortes_ Propuesta de Préstamo aprobada_ [35836636].PDF
Relatório para publicação_PMR-_HO-L1055-2012-2º-Período [37873299].PDF
HO-L1055 [39468581].PDF
Rapport pour Publication_PMR-_HO-L1055-2013-1º-Período [38266184].PDF
HO-L1055 [39250668].PDF
HO-L1055_ Modernization of Customs at Puerto Cortés_ Approved Loan Proposal [35836643].PDF
HO-L1055 Second period Jan-Dec 2016-Public Report.pdf
HO-L1055 [40098551].PDF
HO-L1055 [39323103].PDF
Report for Publication_PMR-_HO-L1055-2011-2º-Period [37298390].PDF
HO-L1055 [40045402].PDF
Informe para Publicación_PMR-_HO-L1055-2013-1º-Periodo [38266849].PDF
HO-L1055 [39997303].PDF
Informe para Publicación_PMR-_HO-L1055-2012-1º-Periodo [37353513].PDF
HO-L1055 [39625854].PDF
HO-L1055 Second period Jan-Dec 2017-Public Report.pdf
XI-IATI-IADB-HO0174
Inter-American Development Bank
Supplemental Water Supply and Sanitation Investment Program
Complemento del Programa de Inversión en Agua Potable y Saneamiento
The loan will supplement loan 1048/SF-HO, approved in December 1999, for a potable water and sanitation program. The program will finance technical assistance and civil works for medium-sized municipalities that are reforming their provision of potable water and sewerage services.
Fund for Special Operations
REPUBLICA DE HONDURAS
FONDO HONDURENO DE INVERSION SOCIAL
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Municipalidades con cambio institucional implementado Complemento del Programa de Inversión en Agua Potable y Saneamiento, Honduras
14.824173968, -86.600264243
WATER AND SANITATION
AGUA Y SANEAMIENTO
24000
Disbursement in first quarter of 2008
23000
Disbursement in second quarter of 2008
78.69
Interest repayment in third quarter of 2008
23000
Disbursement in third quarter of 2008
23000
Disbursement in forth quarter of 2008
330.68
Interest repayment in first quarter of 2009
23000
Disbursement in first quarter of 2009
500000
Disbursement in second quarter of 2009
23000
Disbursement in second quarter of 2009
2157.81
Disbursement in third quarter of 2009
2157.81
Interest repayment in third quarter of 2009
23000
Disbursement in third quarter of 2009
23000
Disbursement in forth quarter of 2009
3326.66
Disbursement in first quarter of 2010
3326.66
Interest repayment in first quarter of 2010
23000
Disbursement in first quarter of 2010
23000
Disbursement in second quarter of 2010
3517.94
Disbursement in third quarter of 2010
3517.94
Interest repayment in third quarter of 2010
23000
Disbursement in third quarter of 2010
23000
Disbursement in forth quarter of 2010
3824.94
Disbursement in first quarter of 2011
3824.94
Interest repayment in first quarter of 2011
23000
Disbursement in first quarter of 2011
4010.57
Disbursement in third quarter of 2011
4010.57
Interest repayment in third quarter of 2011
1861967
Disbursement in third quarter of 2011
12274.19
Disbursement in first quarter of 2012
12274.19
Interest repayment in first quarter of 2012
3407505
Disbursement in second quarter of 2012
21388.58
Disbursement in third quarter of 2012
21388.58
Interest repayment in third quarter of 2012
3192162
Disbursement in forth quarter of 2012
40554.95
Disbursement in first quarter of 2013
40554.95
Interest repayment in first quarter of 2013
2715570.94
Disbursement in first quarter of 2013
551420.06
Disbursement in first quarter of 2013
57626.71
Disbursement in third quarter of 2013
57626.71
Interest repayment in third quarter of 2013
6000000
Disbursement in forth quarter of 2013
63698.16
Disbursement in first quarter of 2014
78537.66
Interest repayment in first quarter of 2014
92934.85
Disbursement in third quarter of 2014
92934.85
Interest repayment in third quarter of 2014
10721375
Disbursement in forth quarter of 2014
84092.06
Disbursement in forth quarter of 2014
84092.06
Interest repayment in forth quarter of 2014
23482.3
Interest repayment in first quarter of 2015
176.66
Interest repayment in second quarter of 2015
147045.79
Interest repayment in third quarter of 2015
149176.32
Interest repayment in first quarter of 2016
147387.22
Interest repayment in third quarter of 2016
149068.98
Interest repayment in first quarter of 2017
293957.96
Interest repayment in third quarter of 2017
493990.12
Loan repayment in third quarter of 2017
293822.62
Interest repayment in first quarter of 2018
493990.12
Loan repayment in first quarter of 2018
284159.36
Interest repayment in third quarter of 2018
493990.12
Loan repayment in third quarter of 2018
283834.55
Interest repayment in first quarter of 2019
493990.12
Loan repayment in first quarter of 2019
274360.76
Interest repayment in third quarter of 2019
493990.12
Loan repayment in third quarter of 2019
273813.78
Interest repayment in first quarter of 2020
493990.12
Loan repayment in first quarter of 2020
265296.99
Interest repayment in third quarter of 2020
493990.12
Loan repayment in third quarter of 2020
263355.2
Interest repayment in first quarter of 2021
493990.12
Loan repayment in first quarter of 2021
254763.56
Interest repayment in third quarter of 2021
493990.12
Loan repayment in third quarter of 2021
254005.66
Interest repayment in first quarter of 2022
493990.12
Loan repayment in first quarter of 2022
244883.77
Interest repayment in third quarter of 2022
493990.12
Loan repayment in third quarter of 2022
244044.66
Interest repayment in first quarter of 2023
493990.12
Loan repayment in first quarter of 2023
235112.23
Interest repayment in third quarter of 2023
493990.12
Loan repayment in third quarter of 2023
233959.25
Interest repayment in first quarter of 2024
493990.12
Loan repayment in first quarter of 2024
Relatório para publicação_PMR-_HO0174-2011-1º-Período [36624061].PDF
HO0174 First period Jan-Jun 2014-Public Report [40182057].PDF
Informe para Publicación_PMR-_HO0174-2013-1º-Periodo [38266861].PDF
Relatório para publicação_PMR-_HO0174-2013-1º-Período [38265532].PDF
HO0174 Second period Jan-Dec 2013-Public Report [40174708].PDF
Relatório para publicação_PMR-_HO0174-2012-2º-Período [37873310].PDF
Informe para Publicación_PMR-_HO0174-2012-2º-Periodo [37874637].PDF
Rapport pour Publication_PMR-_HO0174-2012-2º-Período [37873977].PDF
Report for Publication_PMR-_HO0174-2011-2º-Period [37298396].PDF
Relatório para publicação_PMR-_HO0174-2012-1º-Período [37352202].PDF
Report for Publication_PMR-_HO0174-2011-1º-Period [36625758].PDF
Report for Publication_PMR-_HO0174-2012-2º-Period [37875466].PDF
Rapport pour Publication_PMR-_HO0174-2012-1º-Período [37352865].PDF
HO0174 Second period Jan-Dec 2014-Public Report [40185554].PDF
HO0174 First period Jan-Jun 2015-Public Report [40193956].PDF
Rapport pour Publication_PMR-_HO0174-2011-2º-Período [37298009].PDF
Suplemento del Programa de Inversión en Agua Potable y Saneamiento [802442].DOC
HO0174 [36277639].PDF
HO0174 [38990057].PDF
HO0174 [38908420].PDF
Informe para Publicación_PMR-_HO0174-2011-1º-Periodo [36625197].PDF
Relatório para publicação_PMR-_HO0174-2010-2º-Período [36310294].PDF
Report for Publication_PMR-_HO0174-2012-1º-Period [37354186].PDF
Suplemento del Programa de Inversión en Agua Potable y Saneamiento [802110].DOC
SERVICIOS DE CONSULTORÍA PARA EL ESTUDIO DE FACTIBILIDAD RIO DEL [36224117].PDF
SUPERVISIÓN DEL PROYECTO ALCANTARILLADO SANITARIO DE LA MUNICI [35237982].PDF
Rapport pour Publication_PMR-_HO0174-2010-2º-Período [36312195].PDF
Rapport pour Publication_PMR-_HO0174-2013-1º-Período [38266196].PDF
Informe para Publicación_PMR-_HO0174-2010-2º-Periodo [36312782].PDF
Report for Publication_PMR-_HO0174-2013-1º-Period [38267535].PDF
CAPACITACIÓN Y ASISTENCIA TÉCNICA A LAS MUNICIPALIDADES PARTICIPA [35238317].PDF
Suplemento del Programa de Inversión en Agua Potable y Saneamiento [802994].DOC
CONSTRUCCIÓN DEL I ETAPA DEL SISTEMA DE ALCANTARILLADO SANITARIO [36029007].PDF
Report for Publication_PMR-_HO0174-2010-2º-Period [36313356].PDF
Relatório para publicação_PMR-_HO0174-2011-2º-Período [37297817].PDF
Informe para Publicación_PMR-_HO0174-2012-1º-Periodo [37353523].PDF
Rapport pour Publication_PMR-_HO0174-2011-1º-Período [36624641].PDF
Informe para Publicación_PMR-_HO0174-2011-2º-Periodo [37298200].PDF
Componente I: Asistencia Tecnica para el cambio Institucional
Componente I: Asistencia Tecnica para el cambio Institucional
Municipalidades con cambio institucional implementado
Municipalidades con cambio institucional implementado
Municipalidades con cambio institucional implementado
Municipalidades con cambio institucional implementado
Municipalidades con cambio institucional implementado
Municipalidades con cambio institucional implementado
Componente II. Obras Civiles construidas
Componente II. Obras Civiles construidas
Sistemas de Saneamiento construidos
Sistemas de Saneamiento construidos
Sistemas de Saneamiento construidos
Sistemas de Saneamiento construidos
Sistemas de Saneamiento construidos
Sistemas de Saneamiento construidos
XI-IATI-IADB-HO-L1009
Inter-American Development Bank
Sectorial-Social Program Associated to the ERP
Programa Sectorial Social Asociado a la ERP
EN
El objetivo general de esta operación es apoyar reformas en áreas sociales orientadas a mejorar la capacidad de desarrollo social y económico, y reducir la vulnerabilidad en el marco de la ERP.
Fund for Special Operations
INTER AMERICAN DEVELOPMENT BANK
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS, HONDURAS
SECRETARIA DE FINANZAS, HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
SOCIAL INVESTMENT
INVERSIONES SOCIALES
10000000
Disbursement in second quarter of 2007
34000
Disbursement in second quarter of 2007
35000
Disbursement in third quarter of 2007
38726.09
Interest repayment in forth quarter of 2007
35000
Disbursement in forth quarter of 2007
35000
Disbursement in first quarter of 2008
50514.9
Interest repayment in second quarter of 2008
35000
Disbursement in second quarter of 2008
35000
Disbursement in third quarter of 2008
50804.02
Interest repayment in forth quarter of 2008
35000
Disbursement in forth quarter of 2008
35000
Disbursement in first quarter of 2009
50949.85
Interest repayment in second quarter of 2009
7378.44
Interest repayment in forth quarter of 2009
95422.11
Interest repayment in second quarter of 2010
17621000
Disbursement in third quarter of 2010
51535.81
Interest repayment in forth quarter of 2010
6517.36
Interest repayment in first quarter of 2011
145635.16
Interest repayment in second quarter of 2011
139882.19
Interest repayment in forth quarter of 2011
139671.25
Interest repayment in second quarter of 2012
139500
Interest repayment in forth quarter of 2012
138946.56
Interest repayment in second quarter of 2013
139882.19
Interest repayment in forth quarter of 2013
139117.81
Interest repayment in second quarter of 2014
139882.19
Interest repayment in forth quarter of 2014
139117.81
Interest repayment in second quarter of 2015
139882.19
Interest repayment in forth quarter of 2015
139671.25
Interest repayment in second quarter of 2016
139500
Interest repayment in forth quarter of 2016
138946.56
Interest repayment in second quarter of 2017
279764.38
Interest repayment in forth quarter of 2017
465000
Loan repayment in forth quarter of 2017
273598.36
Interest repayment in second quarter of 2018
465000
Loan repayment in second quarter of 2018
270438.9
Interest repayment in forth quarter of 2018
465000
Loan repayment in forth quarter of 2018
264323.84
Interest repayment in second quarter of 2019
465000
Loan repayment in second quarter of 2019
261113.42
Interest repayment in forth quarter of 2019
465000
Loan repayment in forth quarter of 2019
256063.97
Interest repayment in second quarter of 2020
465000
Loan repayment in second quarter of 2020
250998.35
Interest repayment in forth quarter of 2020
465000
Loan repayment in forth quarter of 2020
245421.42
Interest repayment in second quarter of 2021
465000
Loan repayment in second quarter of 2021
242411.51
Interest repayment in forth quarter of 2021
465000
Loan repayment in forth quarter of 2021
236347.39
Interest repayment in second quarter of 2022
465000
Loan repayment in second quarter of 2022
233136.99
Interest repayment in forth quarter of 2022
465000
Loan repayment in forth quarter of 2022
227225.75
Interest repayment in second quarter of 2023
465000
Loan repayment in second quarter of 2023
223811.51
Interest repayment in forth quarter of 2023
465000
Loan repayment in forth quarter of 2023
PIC_ Social Sector Program to Support the Poverty Reduction Strategy [855112].PDF
Programa Sectorial Asociado a la Estrategia para la Reducción de la Pobreza (ERP) [817232].DOC
Programa Sectorial Social Asociado a la Estrategia para la Reducción de la Pobreza [36329780].PDF
Programa Sectorial Asociado a la Estrategia para la Reducción de la Pobreza (ERP) [813247].DOC
PIC_ Propuesta de préstamo para un programa sectorial asociado a la Estrategia para la Reducción de la Pobreza (HO [855099].PDF
XI-IATI-IADB-HO-L1015
Inter-American Development Bank
Fiscal and Municipal Management Consolidation Program
Programa para la Consolidación de la Gestión Fiscal y Municipal
To continue supporting the GHO in the improvement of fiscal and municipal management, in order to promote greater efectiveness and transparency in the use of public resources.
Continuar apoyando al GdH en el mejoramiento de la gestión fiscal y municipal, a fin de promover una mayor efectividad y transparencia en el uso de los recursos públicos.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
SECRETARIA DE FINANZAS
SECRETARIA DE FINANZAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada Programa para la Consolidación de la Gestión Fiscal y Municipal, Honduras
14.824173968, -86.600264243
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
78702.19
Disbursement in third quarter of 2010
183638.45
Disbursement in third quarter of 2010
429000
Disbursement in third quarter of 2010
1001000
Disbursement in third quarter of 2010
458673.35
Disbursement in forth quarter of 2010
1070237.82
Disbursement in forth quarter of 2010
384396.39
Disbursement in forth quarter of 2010
896924.9
Disbursement in forth quarter of 2010
293.84
Disbursement in forth quarter of 2010
293.84
Interest repayment in forth quarter of 2010
9653.48
Disbursement in forth quarter of 2010
9653.48
Interest repayment in forth quarter of 2010
320143.04
Disbursement in second quarter of 2011
747000.43
Disbursement in second quarter of 2011
1782.83
Disbursement in second quarter of 2011
1782.83
Interest repayment in second quarter of 2011
57380.19
Disbursement in second quarter of 2011
57380.19
Interest repayment in second quarter of 2011
337239.35
Disbursement in third quarter of 2011
786891.82
Disbursement in third quarter of 2011
348152.39
Disbursement in forth quarter of 2011
812355.58
Disbursement in forth quarter of 2011
335318
Disbursement in forth quarter of 2011
782408.66
Disbursement in forth quarter of 2011
2540.39
Disbursement in forth quarter of 2011
2540.39
Interest repayment in forth quarter of 2011
79220.36
Disbursement in forth quarter of 2011
79220.36
Interest repayment in forth quarter of 2011
288640.34
Disbursement in first quarter of 2012
673494.12
Disbursement in first quarter of 2012
3772.41
Disbursement in second quarter of 2012
8802.28
Disbursement in second quarter of 2012
256391.8
Disbursement in second quarter of 2012
598247.53
Disbursement in second quarter of 2012
417170.56
Disbursement in second quarter of 2012
973397.98
Disbursement in second quarter of 2012
10407.89
Interest repayment in second quarter of 2012
3730.61
Disbursement in second quarter of 2012
3730.61
Interest repayment in second quarter of 2012
82336.37
Disbursement in second quarter of 2012
82336.37
Interest repayment in second quarter of 2012
556236.61
Disbursement in third quarter of 2012
1297885.43
Disbursement in third quarter of 2012
1050000
Disbursement in forth quarter of 2012
2450000
Disbursement in forth quarter of 2012
5173.24
Interest repayment in forth quarter of 2012
141507.03
Interest repayment in forth quarter of 2012
1410000
Disbursement in second quarter of 2013
3290000
Disbursement in second quarter of 2013
6750.59
Interest repayment in second quarter of 2013
177555.64
Interest repayment in second quarter of 2013
8568.76
Interest repayment in forth quarter of 2013
210041.33
Interest repayment in forth quarter of 2013
8329.85
Interest repayment in second quarter of 2014
198030.42
Interest repayment in second quarter of 2014
945000
Disbursement in forth quarter of 2014
8375.61
Interest repayment in forth quarter of 2014
2205000
Disbursement in forth quarter of 2014
194298.82
Interest repayment in forth quarter of 2014
9514.33
Interest repayment in second quarter of 2015
210727.95
Interest repayment in second quarter of 2015
512733.75
Disbursement in forth quarter of 2015
1050000
Disbursement in forth quarter of 2015
9560.1
Interest repayment in forth quarter of 2015
206066.14
Interest repayment in forth quarter of 2015
383103.73
Loan repayment in forth quarter of 2015
10200.86
Interest repayment in second quarter of 2016
259411.27
Interest repayment in second quarter of 2016
404566.04
Loan repayment in second quarter of 2016
274225.5
Disbursement in forth quarter of 2016
1358571.65
Disbursement in forth quarter of 2016
10174.9
Interest repayment in forth quarter of 2016
243237.05
Interest repayment in forth quarter of 2016
404566.04
Loan repayment in forth quarter of 2016
322.65
Interest repayment in second quarter of 2017
251243.5
Interest repayment in second quarter of 2017
427903.73
Loan repayment in second quarter of 2017
262716.52
Interest repayment in forth quarter of 2017
427903.73
Loan repayment in forth quarter of 2017
265812.18
Interest repayment in second quarter of 2018
425675.99
Loan repayment in second quarter of 2018
298621.34
Interest repayment in forth quarter of 2018
425675.99
Loan repayment in forth quarter of 2018
332714.06
Interest repayment in second quarter of 2019
425675.99
Loan repayment in second quarter of 2019
345284.85
Interest repayment in forth quarter of 2019
425675.99
Loan repayment in forth quarter of 2019
313590.1
Interest repayment in second quarter of 2020
425675.99
Loan repayment in second quarter of 2020
257721.99
Interest repayment in forth quarter of 2020
425675.99
Loan repayment in forth quarter of 2020
230820.69
Interest repayment in second quarter of 2021
425675.99
Loan repayment in second quarter of 2021
225085.63
Interest repayment in forth quarter of 2021
425675.99
Loan repayment in forth quarter of 2021
231483.54
Interest repayment in second quarter of 2022
425675.99
Loan repayment in second quarter of 2022
228941.55
Interest repayment in forth quarter of 2022
414971.87
Loan repayment in forth quarter of 2022
10704.12
Loan repayment in forth quarter of 2022
281210.63
Interest repayment in second quarter of 2023
425675.99
Loan repayment in second quarter of 2023
320986.23
Interest repayment in forth quarter of 2023
425675.99
Loan repayment in forth quarter of 2023
HO-L1015 First period Jan-Jun 2016-Public Report [40799106].PDF
HO-L1015 First period Jan-Jun 2017-Public Report.pdf
HO-L1015 Second period Jan-Dec 2017-Public Report.pdf
CCLIP _ Programa de Apoyo Integral a la Red de Protección Social [40414268].PDF
HO-L1015 First period Jan-Jun 2015-Public Report [40193961].PDF
HO-L1015 First period Jan-Jun 2014-Public Report [40182074].PDF
Contrato Modificatorio - Programa de Consolidación Fiscal y Municipal_ [35183611].PDF
Programa de Consolidación de la Gestión Fiscal y Municipal [40414322].PDF
HO-L1015 Second period Jan-Dec 2016-Public Report.pdf
HO-L1015 Second period Jan-Dec 2013-Public Report [40174686].PDF
PCR Aprobado 2032-BL-HO (HO-L1015).pdf
HO-L1015 Second period Jan-Dec 2015-Public Report [40377438].PDF
HO-L1015 Second period Jan-Dec 2014-Public Report [40185543].PDF
Administración tributaria y aduanera
Administración tributaria y aduanera
Edificios de las oficinas tributarias y aduaneras readecuados
Edificios de las oficinas tributarias y aduaneras readecuados
Sistemas de gestión y fiscalización de tributos internos implementado
Sistemas de gestión y fiscalización de tributos internos implementado
Edificios de las oficinas tributarias y aduaneras readecuados
Edificios de las oficinas tributarias y aduaneras readecuados
Sistemas de gestión y fiscalización de tributos internos implementado
Sistemas de gestión y fiscalización de tributos internos implementado
Edificios de las oficinas tributarias y aduaneras readecuados
Edificios de las oficinas tributarias y aduaneras readecuados
Edificios de las oficinas tributarias y aduaneras readecuados
Edificios de las oficinas tributarias y aduaneras readecuados
Consolidación del Sist Integrado de Admin Financiera e implantación del Sist de Admin Municipal
Consolidación del Sist Integrado de Admin Financiera e implantación del Sist de Admin Municipal
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Municipios con Sistema de Administracion Municipal Integrado
Municipios con Sistema de Administracion Municipal Integrado
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Sitio alterno de Operación del Sistema Integrado de Administración Financiera establecido
Sitio alterno de Operación del Sistema Integrado de Administración Financiera establecido
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Municipios con Sistema de Administracion Municipal Integrado
Municipios con Sistema de Administracion Municipal Integrado
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacidad tecnológica para la atención de usuarios Sistema Integrado de Administración Financiera incrementada
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Capacitaciones a los recursos humanos del Sistema Integrado de Administración Financiera entregadas
Estadísticas Fiscales y Monetarias del Banco Central
Estadísticas Fiscales y Monetarias del Banco Central
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Sub Sistemas del Macrosistema Integrado de Estadísticas Macroeconómicas del Banco Cental de Honduras implementado
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
Indicadores y estadísticas adaptadas a las mejores prácticas internacionales
XI-IATI-IADB-HO-L1232
Inter-American Development Bank
Transparency and Integrity Program for Sustainable Development
Programa de Transparencia e Integridad para el Desarrollo Sostenible
The general development objective of this operation is to increase the accountability of the Government of Honduras. The specific development objectives are to increase: (i) public transparency will contribute; (ii) the effectiveness of public integrity policies; and (iii) the efficiency of the control systems.
El objetivo general de desarrollo de esta operación es aumentar la rendición de cuentas por parte del Gobierno de Honduras, al cual contribuirán los objetivos de desarrollo específicos de incrementar: (i) la transparencia pública; (ii) la eficacia de las políticas de integridad pública; y (iii) la eficiencia en los sistemas de control.
BLENDED LOANS
SECRETARIA DE FINANZAS
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
195000000
Disbursement in forth quarter of 2022
3106737.94
Interest repayment in second quarter of 2023
4298935.61
Interest repayment in forth quarter of 2023
Honduras. Propuesta de prestamo para el Programa de Transparencia e Integridad para el Desarrollo Sostenible.pdf
Contrato de Préstamo No. 5593-BL-HO - Programa de Transparencia e Integridad para el Desarrollo Sostenible.pdf
Honduras. Loan proposal for the Transparency and Integrity Program for Sustainable Development.pdf
Programa de Transparencia e Integridad para el Desarrollo Sostenible.pdf
Transparency and Integrity Program for Sustainable Development.pdf
XI-IATI-IADB-HO-L1193
Inter-American Development Bank
Program to Support Social Protection Reforms
Programa de Apoyo a Reformas en Protección Social
The development objective of this programmatic series is to support the adoption of policymeasures conducive to a reduction in extreme poverty among households in Honduras through the design andimplementation of policies to improve the financial sustainability and efficiency of redistributive social protection spending,with an emphasis on human capital formation for children and adolescents, consolidation of the basic social welfare serviceofferings in health and education as a complement to redistributive programs, and strengthening of governance ininformation management and coordination capacity in the social sector. The objective of this first operation is to contributeto the design and enactment of legal instruments to strengthen the policy framework and facilitate the implementation ofredistributive social protection policies that provide relief to households in conditions of extreme poverty.This operation was designed as a programmatic policy-based loan (PBP) and is the first of two individual operations
El objetivo de desarrollo de esta serie programática es apoyar la adopción demedidas de política que conducen a la reducción de la pobreza extrema de los hogares en Honduras. Lo anterior medianteel diseño e implementación de políticas dirigidas a mejorar la sostenibilidad financiera y eficiencia del gasto en protecciónsocial redistributiva con énfasis en la formación de capital humano de los niños, niñas y adolescentes, la consolidaciónde la oferta de servicios básicos de protección social de salud y educación para la complementariedad de los programasredistributivos y el fortalecimiento de la gobernanza en la gestión de la información y capacidad de coordinación en elsector social. El objetivo de esta primera operación es contribuir con el diseño y promulgación de instrumentos legalesque fortalecerán el marco normativo y facilitarán la implementación de políticas de protección social redistributiva para elalivio de la situación de pobreza extrema de los hogares.Esta operación fue diseñada como un Préstamo Programático de Apoyo a Reformas de Políticas (PBP) y es la primerade dos operaciones individuales.
SECRETARIA DE FINANZAS
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Acta de Comité Técnico del programa Bono Vida Mejor, publicado en Diario Oficial “La Gaceta”, conteniendo el documento aprobado de la Estrategia de Desconcentración Operativa. Programa de Apoyo a Reformas en Protección Social, Honduras
nan
SOCIAL INVESTMENT
INVERSIONES SOCIALES
49780000
Disbursement in forth quarter of 2018
491460.89
Interest repayment in second quarter of 2019
514340.61
Interest repayment in forth quarter of 2019
406028.42
Interest repayment in second quarter of 2020
235644.37
Interest repayment in forth quarter of 2020
207608.26
Interest repayment in second quarter of 2021
202903.28
Interest repayment in forth quarter of 2021
214850.47
Interest repayment in second quarter of 2022
563883.53
Interest repayment in forth quarter of 2022
889913.97
Interest repayment in second quarter of 2023
1017574.81
Interest repayment in forth quarter of 2023
EER5- Monitoreo y Evaluacion HO-L1093.docx
Contrato - Programa de Apoyo a Reformas en Protección Social.pdf
Programa de Apoyo a Reformas en Protección Social - Propuesta de Préstamo.pdf
EER3 - Medios de Verificacion de Matriz de Politicas.docx
PCR aprobado HO-L1193 HO-L1204_Progrma de Apoyo a Reformas en Protección Social I y II.pdf
Program to Support Social Protection Reforms - Loan Proposal.pdf
XI-IATI-IADB-HO-L1037
Inter-American Development Bank
Puerto Cortés Expansion and Modernization Program
Programa Ampliación y Modernización de Puerto Cortés
The general objective of the project is to improve the capacity and efficiency of the Port operations. The specific objectives are: (i) to reducing operational costs and delays in cargo handling; (ii) contribute to improve the logistic operations of the Port and to avoid contamination risks caused by a lack of adequate storage and separation of organic and inorganic bulk; (ii) to avoid risks of contamination produced by operations with bulks and interferences with the urban transit, by means of the use of specializing equipment and storage in the port.
El objetivo general del proyecto es de mejorar la capacidad y eficiencia de las operacions del Puerto. Los objetivos específicos: (i) reducir los costos de operación y los costos de tiempo de los buques y mercaderías, así como posibilitar el desarrollo de las operaciones logísticas típicas de las terminales especializadas (contenedores y graneles orgánicos); (ii) evitar riesgos de contaminación producida por operaciones con graneles e interferencias con el tránsito urbano, mediante el uso de equipamiento especializado y almacenamiento en el puerto.
INVERSION ESTRATEGICA DE HONDURAS INVESTH
BLENDED LOANS
EMPRESA NACIONAL PORTUARIA
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
TRANSPORT
TRANSPORTE
273331.8
Disbursement in second quarter of 2014
637774.2
Disbursement in second quarter of 2014
374.43
Interest repayment in forth quarter of 2014
3942.84
Interest repayment in forth quarter of 2014
340.73
Interest repayment in second quarter of 2015
3687.55
Interest repayment in second quarter of 2015
23343.61
Disbursement in forth quarter of 2015
54468.42
Disbursement in forth quarter of 2015
353.79
Interest repayment in forth quarter of 2015
3969.11
Interest repayment in forth quarter of 2015
4412159.4
Disbursement in second quarter of 2016
10295038.6
Disbursement in second quarter of 2016
370.93
Interest repayment in second quarter of 2016
9061.61
Interest repayment in second quarter of 2016
4477603.8
Disbursement in forth quarter of 2016
10447742.2
Disbursement in forth quarter of 2016
6277.83
Interest repayment in forth quarter of 2016
121895.77
Interest repayment in forth quarter of 2016
235209.39
Interest repayment in second quarter of 2017
13950590
Disbursement in second quarter of 2017
30508193.8
Loan repayment in third quarter of 2017
29259254
Disbursement in forth quarter of 2017
632215.11
Interest repayment in forth quarter of 2017
24628682
Disbursement in second quarter of 2018
870875.5
Interest repayment in second quarter of 2018
1123519.87
Loan repayment in second quarter of 2018
15056988
Disbursement in forth quarter of 2018
2642719.19
Interest repayment in forth quarter of 2018
3210214.24
Loan repayment in forth quarter of 2018
38088.13
Interest repayment in first quarter of 2019
10439703
Disbursement in second quarter of 2019
3025684.89
Interest repayment in second quarter of 2019
3718749.14
Loan repayment in second quarter of 2019
11032239
Disbursement in forth quarter of 2019
1725873.66
Interest repayment in forth quarter of 2019
2086533.29
Loan repayment in forth quarter of 2019
1577570.27
Interest repayment in second quarter of 2020
2086533.28
Loan repayment in second quarter of 2020
1488070.9
Interest repayment in forth quarter of 2020
2086533.28
Loan repayment in forth quarter of 2020
1521719.22
Interest repayment in second quarter of 2021
2086533.28
Loan repayment in second quarter of 2021
1506496.22
Interest repayment in forth quarter of 2021
2086533.28
Loan repayment in forth quarter of 2021
1486675.9
Interest repayment in second quarter of 2022
2090737.73
Loan repayment in second quarter of 2022
1431843.04
Interest repayment in forth quarter of 2022
2086533.28
Loan repayment in forth quarter of 2022
1369918.07
Interest repayment in second quarter of 2023
2086533.28
Loan repayment in second quarter of 2023
1338882.69
Interest repayment in forth quarter of 2023
2086533.28
Loan repayment in forth quarter of 2023
HO-L1037 Second period Jan-Jun 2017-Public Report.pdf
Relatório para publicação_PMR-_HO-L1037-2011-1º-Período [36624052].PDF
HO-L1037 First period Jan-Jun 2020 - Public Report.pdf
HO-L1037 [40286714].PDF
HO-L1037 First period Jan-Jun 2019-Public Report.pdf
HO-L1037 First period Jan-Jun 2022 - Public Report.PDF
PCR Programa de integracion vial regional (HO-L1037 y L1104)_PostQRR.pdf
HO-L1037 [40183729].PDF
HO-L1037 Second period Jan-Dec 2018-Public Report.pdf
HO-L1104 [39863593].PDF
HO-L1037 Second period Jan-Dec 2019-Public Report.pdf
Rapport pour Publication_PMR-_HO-L1037-2011-2º-Período [37298001].PDF
HO-L1037 First period Jan-Jun 2014-Public Report [40182082].PDF
Report for Publication_PMR-_HO-L1037-2010-2º-Period [36313351].PDF
Rapport pour Publication_PMR-_HO-L1037-2012-2º-Período [37873964].PDF
Programa de Ampliación y Modernización de Puerto Cortés_ [36667422].PDF
HO-L1037 Second period Jan-Dec 2022 - Public Report.PDF
Report for Publication_PMR-_HO-L1037-2013-1º-Period [38267521].PDF
HO-L1037 [38840489].PDF
HO-L1037 First period Jan-Jun 2016-Public Report [40799933].PDF
HO-L1037 Second period Jan-Dec 2015-Public Report [40382890].PDF
Informe para Publicación_PMR-_HO-L1037-2010-2º-Periodo [36312777].PDF
HO-L1037 [40281141].PDF
HO-L1037 Second period Jan-Dec 2016-Public Report.pdf
Relatório para publicação_PMR-_HO-L1037-2010-2º-Período [36310289].PDF
HO-L1037 Second period Jan-Dec 2014-Public Report [40185548].PDF
Report for Publication_PMR-_HO-L1037-2012-1º-Period [37354173].PDF
HO-L1037 Second period Jan-Dec 2021 - Public Report.PDF
Informe para Publicación_PMR-_HO-L1037-2011-2º-Periodo [37298191].PDF
Rapport pour Publication_PMR-_HO-L1037-2012-1º-Período [37352853].PDF
Informe para Publicación_PMR-_HO-L1037-2013-1º-Periodo [38266847].PDF
Rapport pour Publication_PMR-_HO-L1037-2011-1º-Período [36624633].PDF
Rapport pour Publication_PMR-_HO-L1037-2013-1º-Período [38266182].PDF
Relatório para publicação_PMR-_HO-L1037-2012-1º-Período [37352189].PDF
HO-L1037 First period Jan-Jun 2021 - Public Report.pdf
Relatório para publicação_PMR-_HO-L1037-2011-2º-Período [37297809].PDF
Report for Publication_PMR-_HO-L1037-2011-2º-Period [37298387].PDF
Informe para Publicación_PMR-_HO-L1037-2011-1º-Periodo [36625188].PDF
HO-L1037 [40411756].PDF
Report for Publication_PMR-_HO-L1037-2011-1º-Period [36625750].PDF
Informe para Publicación_PMR-_HO-L1037-2012-1º-Periodo [37353509].PDF
HO-L1037 First period Jan-Jun 2015-Public Report [40193975].PDF
HO-L1037 First period Jan-Jun 2018-Public Report.pdf
HO-L1037 [38827809].PDF
HO-L1037 First period Jan-Jun 2017-Public Report.pdf
Relatório para publicação_PMR-_HO-L1037-2012-2º-Período [37873296].PDF
HO-L1037 Second period Jan-Dec 2020 - Public Report.pdf
Relatório para publicação_PMR-_HO-L1037-2013-1º-Período [38265518].PDF
Rapport pour Publication_PMR-_HO-L1037-2010-2º-Período [36312190].PDF
Puerto Cortés Expansion and ModernizationProgram_ [36667468].PDF
HO-L1037 Second period Jan-Dec 2013-Public Report [40174665].PDF
XI-IATI-IADB-HO-L1072
Inter-American Development Bank
Mother and Child Hospital Network Strengthening Program
Fortalecimiento de la Red Hospitalaria Materno Infantil
The general objective of the program will be to contribute to reducing maternal and infant mortality in the departments of Intibucá, Lempira, and Valle by cutting maternal and neonatal hospital mortality rates in these three departments¿ area hospitals and their referral network. Specifically, the project aims to improve the coverage and quality of maternal and child hospital care in the three hospitals so as to significantly increase the rates of institutional births, improve care for mothers and newborns during the postpartum period, and enhance resolution capacity in obstetric and neonatal complications.
El objetivo general del programa será contribuir a la reducción de la mortalidadmaterno-infantil de los departamentos de Intibucá, Lempira y Valle, a través de lareducción de la mortalidad hospitalaria materno-neonatal en los hospitales de áreade esos tres departamentos y su red de derivación. Más específicamente, elproyecto espera mejorar la cobertura y calidad de las atenciones hospitalariasmaterno-infantiles en estos tres hospitales para aumentar significativamente elnúmero de partos institucionales, mejorar los cuidados en el período post-parto dela madre y el recién nacido, así como la capacidad de resolución de lascomplicaciones obstétricas y neonatales.
INTER AMERICAN DEVELOPMENT BANK
BLENDED LOANS
REPUBLICA DE HONDURAS
SECRETARÍA DE ESTADO EN EL DESPACHO DE SALUD (SESAL)
SECRETARÍA DE ESTADO EN EL DESPACHO DE SALUD (SESAL)
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Estrategia de comunicación Fortalecimiento de la Red Hospitalaria Materno Infantil, Honduras
14.824173968, -86.600264243
HEALTH
SALUD
1890000
Disbursement in third quarter of 2013
4410000
Disbursement in third quarter of 2013
2006.51
Interest repayment in forth quarter of 2013
21911.05
Interest repayment in forth quarter of 2013
450000
Disbursement in second quarter of 2014
1050000
Disbursement in second quarter of 2014
2356.03
Interest repayment in second quarter of 2014
25207.07
Interest repayment in second quarter of 2014
5460000
Loan repayment in third quarter of 2014
3065.54
Interest repayment in forth quarter of 2014
99120.7
Interest repayment in forth quarter of 2014
900000
Disbursement in first quarter of 2015
2100000
Disbursement in first quarter of 2015
3521.1
Interest repayment in second quarter of 2015
121918.98
Interest repayment in second quarter of 2015
4061.1
Interest repayment in forth quarter of 2015
128695.59
Interest repayment in forth quarter of 2015
1200000
Disbursement in forth quarter of 2015
2800000
Disbursement in forth quarter of 2015
5502.93
Interest repayment in second quarter of 2016
177307.39
Interest repayment in second quarter of 2016
2460000
Disbursement in second quarter of 2016
5740000
Disbursement in second quarter of 2016
10640000
Loan repayment in third quarter of 2016
8255.33
Interest repayment in forth quarter of 2016
271096.82
Interest repayment in forth quarter of 2016
7000000
Disbursement in first quarter of 2017
299435.42
Interest repayment in second quarter of 2017
335814.55
Interest repayment in forth quarter of 2017
358769.67
Interest repayment in second quarter of 2018
367261.25
Interest repayment in forth quarter of 2018
437500
Loan repayment in forth quarter of 2018
357878.63
Interest repayment in second quarter of 2019
437500
Loan repayment in second quarter of 2019
352428.73
Interest repayment in forth quarter of 2019
437500
Loan repayment in forth quarter of 2019
344208.89
Interest repayment in second quarter of 2020
437500
Loan repayment in second quarter of 2020
336673.82
Interest repayment in forth quarter of 2020
437500
Loan repayment in forth quarter of 2020
336191.04
Interest repayment in second quarter of 2021
437500
Loan repayment in second quarter of 2021
331934.65
Interest repayment in forth quarter of 2021
437500
Loan repayment in forth quarter of 2021
322192.88
Interest repayment in second quarter of 2022
437500
Loan repayment in second quarter of 2022
316621.69
Interest repayment in forth quarter of 2022
437500
Loan repayment in forth quarter of 2022
303757.79
Interest repayment in second quarter of 2023
437500
Loan repayment in second quarter of 2023
297266.29
Interest repayment in forth quarter of 2023
437500
Loan repayment in forth quarter of 2023
Relatório para publicação_PMR-_HO-L1072-2013-1º-Período [38265526].PDF
HO-L1072 Second period Jan-Dec 2014-Public Report [40185546].PDF
HO-L1072 First period Jan-Jun 2015-Public Report [40193983].PDF
Informe para Publicación_PMR-_HO-L1072-2013-1º-Periodo [38266855].PDF
Rapport pour Publication_PMR-_HO-L1072-2012-1º-Período [37352862].PDF
HO-L1072 [40183492].PDF
HO-L1072 [39840648].PDF
HO-L1072 [39751609].PDF
HO-L1072 First period Jan-Jun 2014-Public Report [40182050].PDF
HO-L1072 First period Jan-Jun 2016-Public Report [40799119].PDF
HO-L1072 Second period Jan-Dec 2016-Public Report.pdf
Report for Publication_PMR-_HO-L1072-2012-1º-Period [37354183].PDF
Fortalecimiento de la Red Hospitalaria Materno Infantil - Propuesta de Préstamo [36908097].PDF
HO-L1072 [39731728].PDF
Relatório para publicação_PMR-_HO-L1072-2012-2º-Período [37873305].PDF
HO-L1072 Second period Jan-Dec 2015-Public Report [40377512].PDF
HO-L1072 [40186537].PDF
Contrato Modificatorio No_ 2 - Programa de Fortalecimiento de la Red Hospitalaria [40844930].PDF
HO-L1072 [39682823].PDF
Report for Publication_PMR-_HO-L1072-2012-2º-Period [37875461].PDF
HO-L1072 [40411670].PDF
Informe para Publicación_PMR-_HO-L1072-2012-1º-Periodo [37353520].PDF
Mother and Child Hospital Network Strengthening Program - Loan Proposal [36908129].PDF
Rapport pour Publication_PMR-_HO-L1072-2012-2º-Período [37873973].PDF
Rapport pour Publication_PMR-_HO-L1072-2013-1º-Período [38266190].PDF
HO-L1072 [40666814].PDF
Relatório para publicação_PMR-_HO-L1072-2012-1º-Período [37352199].PDF
Informe para Publicación_PMR-_HO-L1072-2012-2º-Periodo [37874633].PDF
HO-L1072 [39830473].PDF
Contrato - Fortalecimiento de la Red Hospitalaria Materno Infantil [40844872].PDF
HO-L1072 [39892929].PDF
Contrato Modificatorio - Programa de Fortalecimiento de la Red Hospitalaria [40844915].PDF
Report for Publication_PMR-_HO-L1072-2013-1º-Period [38267529].PDF
HO-L1072 Second period Jan-Dec 2013-Public Report [40174682].PDF
HO-L1072 [39628739].PDF
HO-L1072 [39742117].PDF
HO-L1072 First period Jan-Jun 2017-Public Report.pdf
Componente 1. Fortalecimiento de la Red
Componente 1. Fortalecimiento de la Red
Personas atendidas por gestores del hospital Juan Manuel Galvez (Lempira )
Personas atendidas por gestores del hospital Juan Manuel Galvez (Lempira )
Personas atendidas por gestores del hospital San Lorenzo (Valle)
Personas atendidas por gestores del hospital San Lorenzo (Valle)
Población cubierta a través de gestores descentralizados de primer nivel
Población cubierta a través de gestores descentralizados de primer nivel
Personas atendidas por gestores del hospital San Lorenzo (Valle)
Personas atendidas por gestores del hospital San Lorenzo (Valle)
Personas atendidas por gestores del hospital Enrique Aguilar Cerrato (Intibucá)
Personas atendidas por gestores del hospital Enrique Aguilar Cerrato (Intibucá)
Componente 2. Fortalecimiento de la Capacidad Institucional de la SESAL
Componente 2. Fortalecimiento de la Capacidad Institucional de la SESAL
Monitorias realizadas a gestores descentralizados
Monitorias realizadas a gestores descentralizados
Estrategia de comunicación
Estrategia de comunicación
Estrategia de comunicación
Estrategia de comunicación
Estrategia de comunicación
Estrategia de comunicación
Gestión de hospitales fortalecida
Gestión de hospitales fortalecida
Monitorias realizadas a gestores descentralizados
Monitorias realizadas a gestores descentralizados
Gestión de hospitales fortalecida
Gestión de hospitales fortalecida
Gestión de hospitales fortalecida
Gestión de hospitales fortalecida
Evaluación de Impacto
Evaluación de Impacto
Gestores de Hospitales Capacitados
Gestores de Hospitales Capacitados
Planos arquitectónicos elaborados y Supervisados
Planos arquitectónicos elaborados y Supervisados
Monitorias realizadas a gestores descentralizados
Monitorias realizadas a gestores descentralizados
Monitorias realizadas a gestores descentralizados
Monitorias realizadas a gestores descentralizados
Gestión de hospitales fortalecida
Gestión de hospitales fortalecida
XI-IATI-IADB-HO-L1222
Inter-American Development Bank
Tropical Storm ETA Emergency Response Program
Programa de Emergencia en Respuesta a la Tormenta Tropical ETA
The objective of the program is to support the transition process of the population affected by ETA tropical storm towards the recovery of their regular social and economic activities, by restoring the level of access to the provision of basic public services.
El objetivo del programa es apoyar el proceso de transición de la población afectada por la tormenta tropical ETA hacia la recuperación de sus actividades sociales y económicas regulares, por medio del restablecimiento del nivel de acceso a la provisión de servicios públicos básicos.
BLENDED LOANS
SECRETARIA DESARROLLO COMUNITARIO AGUA Y SANAMIENTO
REPUBLICA DE HONDURAS
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
ENVIRONMENT AND NATURAL DISASTERS
MEDIO AMBIENTE Y DESASTRES NATURALE
20498.98
Disbursement in forth quarter of 2022
81679.11
Disbursement in forth quarter of 2022
274257.29
Disbursement in first quarter of 2023
3871.54
Interest repayment in second quarter of 2023
8189.09
Interest repayment in forth quarter of 2023
Proyectos AS_ HO_L1222 (fichas de agua).xlsx
Honduras. Loan proposal for the Tropical Storm Eta Emergency Response Program - HO-L1222.pdf
Analsis Economico - HO-L1222.pdf
Plan de Evaluacion y Monitoreo HO-L1222.pdf
PCM-112-2020 Reforma Declaracion de Emergencia ETA.pdf
Programa de Emergencia en Respuesta a la Tormenta Tropical ETA.pdf
HO-L1222_P746072_SP.pdf
Contrato - Programa de Emergencia en Respuesta a la Tormenta Tropical ETA.pdf
Tropical Storm ETA Emergency Response Program.pdf
HO-L1222 - Resumen Ejecutivo - Programa de Emergencia en Respuesta a la Tormenta Tropical ETA.pdf
EEO 4 Fichas remocion de escombros - LP.xlsx
HO-L1222 Solicitud operación de financ para Tormenta Tropical ETA.pdf
HO-L1122 - Executive sumary -Tropical Storm Eta Emergency Response Program.pdf
Honduras. Propuesta de préstamo para el Programa de Emergencia en Respuesta a la Tormenta Tropical ETA - HO-L1222.pdf
Fichas proyectos viales HO_L1222.xlsx
XI-IATI-IADB-HO-L1044
Inter-American Development Bank
Support the 2012 Population and Housing Census and Integrated System of House
Apoyo Censo Población y Vivienda 2012 y Sistema Integrado de Encuestas Hogares
The objective of the program is to help upgrade the quality of the basic statistics needed by the country to facilitate better-informed public decision-making, with quality defined as timely, reliable, and sufficient information. To this end, the program will finance: (i) the 2012 National Population and Housing Census (CNPV); (ii) an increase in the periodicity of the Continuous Multipurpose Household Survey; (iii) implementation of the 2011-2012 National Demographic and Health Survey (ENDESA); and (iv) staff training for the National Statistics Institute (INE) and the National Statistics System (SEN).
El objetivo del proyecto es contribuir a mejorar la calidad de la estadística básica requerida por el país para facilitar la toma de decisiones públicas mejor informadas; entendiendo por calidad la oportunidad, confiabilidad y suficiencia de ésta información. Para lo cual, el programa financiará: (i) la realización del Censo Nacional de Población y Vivienda (CNPV) 2012; (ii) el incremento en la periodicidad de la Encuesta Permanente de Hogares de Propósitos Múltiples; (iii) la realización de la Encuesta Nacional de Demografía y Salud (ENDESA) 2011-2012; y (iv) capacitación del personal del Instituto Nacional de Estadística (INE) y del Sistema Estadístico Nacional (SEN).
REPUBLICA DE HONDURAS
BLENDED LOANS
INELEC
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
Base de datos de la ENDESA construida Apoyo Censo Población y Vivienda 2012 y Sistema Integrado de Encuestas Hogares, Honduras
14.824173968, -86.600264243
REFORM / MODERNIZATION OF THE STATE
REFORMA/MODERNIZACIÓN DEL ESTADO
1383338.63
Disbursement in first quarter of 2012
3227790.13
Disbursement in first quarter of 2012
2040.99
Interest repayment in forth quarter of 2012
21061.78
Interest repayment in forth quarter of 2012
824381.1
Disbursement in forth quarter of 2012
1923555.9
Disbursement in forth quarter of 2012
260285.95
Disbursement in forth quarter of 2012
607333.88
Disbursement in forth quarter of 2012
28043.47
Disbursement in forth quarter of 2012
65434.77
Disbursement in forth quarter of 2012
5824114.68
Loan repayment in first quarter of 2013
3927125.4
Disbursement in first quarter of 2013
9163292.6
Disbursement in first quarter of 2013
9163292.6
Loan repayment in second quarter of 2013
2984.55
Interest repayment in second quarter of 2013
68412.44
Interest repayment in second quarter of 2013
8884.81
Interest repayment in forth quarter of 2013
295558.38
Interest repayment in forth quarter of 2013
8006.97
Interest repayment in second quarter of 2014
285229.66
Interest repayment in second quarter of 2014
8050.97
Interest repayment in forth quarter of 2014
287118.9
Interest repayment in forth quarter of 2014
330000
Disbursement in forth quarter of 2014
770000
Disbursement in forth quarter of 2014
8386.7
Interest repayment in second quarter of 2015
289585.16
Interest repayment in second quarter of 2015
300000
Disbursement in third quarter of 2015
700000
Disbursement in third quarter of 2015
8624.87
Interest repayment in forth quarter of 2015
293485.67
Interest repayment in forth quarter of 2015
165000
Disbursement in first quarter of 2016
385000
Disbursement in first quarter of 2016
8884.24
Interest repayment in second quarter of 2016
336939.38
Interest repayment in second quarter of 2016
246000
Disbursement in second quarter of 2016
574000
Disbursement in second quarter of 2016
9242.84
Interest repayment in forth quarter of 2016
330267.52
Interest repayment in forth quarter of 2016
339280.37
Interest repayment in second quarter of 2017
341315.08
Interest repayment in forth quarter of 2017
362841.82
Loan repayment in forth quarter of 2017
330066.81
Interest repayment in second quarter of 2018
362841.82
Loan repayment in second quarter of 2018
323224.74
Interest repayment in forth quarter of 2018
362841.82
Loan repayment in forth quarter of 2018
314745.11
Interest repayment in second quarter of 2019
362841.82
Loan repayment in second quarter of 2019
309649.61
Interest repayment in forth quarter of 2019
362841.82
Loan repayment in forth quarter of 2019
302350.02
Interest repayment in second quarter of 2020
362841.82
Loan repayment in second quarter of 2020
295191.14
Interest repayment in forth quarter of 2020
362841.82
Loan repayment in forth quarter of 2020
291496.86
Interest repayment in second quarter of 2021
362841.82
Loan repayment in second quarter of 2021
289626.89
Interest repayment in forth quarter of 2021
362841.82
Loan repayment in forth quarter of 2021
281075.74
Interest repayment in second quarter of 2022
362841.82
Loan repayment in second quarter of 2022
275460.18
Interest repayment in forth quarter of 2022
362841.82
Loan repayment in forth quarter of 2022
265187.84
Interest repayment in second quarter of 2023
362841.82
Loan repayment in second quarter of 2023
258287.46
Interest repayment in forth quarter of 2023
362841.82
Loan repayment in forth quarter of 2023
HO-L1044 Second period Jan-Dec 2015-Public Report [40377443].PDF
Report for Publication_PMR-_HO-L1044-2013-1º-Period [38267522].PDF
Enlace Obligatorio _ 1_ Plan Operativo Anual (POA) [36049390].PDF
HO-L1044 [40187025].PDF
Enlace Obligatorio _ 3_ Plan de Adquisiciones [36049574].docx
HO-L1044 [36564267].PDF
Relatório para publicação_PMR-_HO-L1044-2012-1º-Período [37352192].PDF
Report for Publication_PMR-_HO-L1044-2012-2º-Period [37875451].PDF
Rapport pour Publication_PMR-_HO-L1044-2011-1º-Período [36624635].PDF
Informe para Publicación_PMR-_HO-L1044-2011-2º-Periodo [37298193].PDF
Enlace Obligatorio _ 2_ Plan de Monitoreo y Evaluación [36049484].docx
Rapport pour Publication_PMR-_HO-L1044-2011-2º-Período [37298003].PDF
Enlace Opcional _ 1_ Análisis Económico [36063388].PDF
HO-L1044 First period Jan-Jun 2016-Public Report [40799110].PDF
Rapport pour Publication_PMR-_HO-L1044-2013-1º-Período [38266183].PDF
HO-L1044 Second period Jan-Dec 2013-Public Report [40174699].PDF
Report for Publication_PMR-_HO-L1044-2012-1º-Period [37354176].PDF
HO-L1044 First period Jan-Jun 2015-Public Report [40193991].PDF
Informe para Publicación_PMR-_HO-L1044-2013-1º-Periodo [38266848].PDF
Informe para Publicación_PMR-_HO-L1044-2011-1º-Periodo [36625190].PDF
Informe para Publicación_PMR-_HO-L1044-2012-1º-Periodo [37353512].PDF
Rapport pour Publication_PMR-_HO-L1044-2012-2º-Período [37873966].PDF
Anexo IV (POD)_ Formularios de Salvaguardia [35989149].DOCX
HO-L1044 [36564243].PDF
HO-L1044 [39907974].PDF
Relatório para publicação_PMR-_HO-L1044-2013-1º-Período [38265519].PDF
Report for Publication_PMR-_HO-L1044-2011-1º-Period [36625752].PDF
HO-L1044 Second period Jan-Dec 2014-Public Report [40185551].PDF
Report for Publication_PMR-_HO-L1044-2011-2º-Period [37298389].PDF
Publicacion - HO-L1044 PCR - Programa de Apoyo al Censo de Población y Vivienda 2012 y Sistema Integral de Honduras .pdf
Contrato - Programa de Apoyo al Censo de Población y Vivienda 2012 y Sistema Integrado de Encuestas de Hogares de Honduras.pdf
Relatório para publicação_PMR-_HO-L1044-2011-1º-Período [36624054].PDF
Informe para Publicación_PMR-_HO-L1044-2012-2º-Periodo [37874626].PDF
Rapport pour Publication_PMR-_HO-L1044-2012-1º-Período [37352855].PDF
HO-L1044 First period Jan-Jun 2014-Public Report [40182042].PDF
Relatório para publicação_PMR-_HO-L1044-2012-2º-Período [37873298].PDF
Relatório para publicação_PMR-_HO-L1044-2011-2º-Período [37297811].PDF
Apoyo a la ejecución del CNPV 2012
Apoyo a la ejecución del CNPV 2012
Directorio de Segmentos censales elaborados
Directorio de Segmentos censales elaborados
Planos cartográficos digitalizados
Planos cartográficos digitalizados
Informes de Seguimiento formulados
Informes de Seguimiento formulados
Censo (empadronamiento) realizado
Censo (empadronamiento) realizado
Informes de Seguimiento formulados
Informes de Seguimiento formulados
Resultados del CNPV publicados
Resultados del CNPV publicados
Estudios temáticos post-censales publicados
Estudios temáticos post-censales publicados
Planos cartográficos para todo el territorio nacional actualizados
Planos cartográficos para todo el territorio nacional actualizados
Informes de Seguimiento formulados
Informes de Seguimiento formulados
Planos cartográficos para todo el territorio nacional actualizados
Planos cartográficos para todo el territorio nacional actualizados
Planos cartográficos digitalizados
Planos cartográficos digitalizados
Apoyo a la implementación de un sistema integrado de encuestas de hogares
Apoyo a la implementación de un sistema integrado de encuestas de hogares
ENDESA Piloto ejecutado
ENDESA Piloto ejecutado
EPHPM ejecutada
EPHPM ejecutada
Resultados de la ENDESA publicados
Resultados de la ENDESA publicados
Base de datos de la ENDESA construida
Base de datos de la ENDESA construida
EPHPM ejecutada
EPHPM ejecutada
EPHPM ejecutada
EPHPM ejecutada
EPHPM ejecutada
EPHPM ejecutada
Planos cartográficos para ENDESA actualizados
Planos cartográficos para ENDESA actualizados
Capacitación
Capacitación
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
Funcionarios públicos capacitados
XI-IATI-IADB-HO-L1207
Inter-American Development Bank
Central District Water and Sanitation Services Reform Program
Programa de Reforma de los Servicios de Agua y Saneamiento en el Distrito Central
The objective of this programmatic series is to help increase access and improve the quality of water and sanitation services in the Central District through a process of reforms that permit decentralization of those services to the municipal level, thereby enhancing sector governance and management in a context of climate change and with a view to achieving water security. The objective of this first operation is to contribute to the design and enactment of legal and sector instruments. The specific objectives are: (i) to promote operational and management development so as to increase the efficiency of water and sanitation services provided by the Municipal Water and Sanitation Unit (UMAPS); (ii) to help increase the financial sustainability of services provided by UMAPS; (iii) to strengthen UMAPS planning; and (iv) to strengthen the sector framework though better governance, regulation, and management of resources in a context of climate change, and improve service delivery to better meet demand. This is the first loan in a series of two consecutive single-tranche operations that are technically related to one another but independently financed as programmatic policy-based loans.
El objetivo de esta serie programática es contribuir a mejorar la calidad e incrementar el acceso a los servicios de Agua y Saneamiento (AyS) en el Distrito Central (DC) a través de un proceso de reformas que permitan consolidar la municipalización de los servicios de AyS mejorando la gobernanza sectorial y su gestión, en un contexto de cambio climático y conducente a la seguridad hídrica. El objetivo de esta primera operación es contribuir con el diseño y promulgación de instrumentos legales y sectoriales. Los objetivos específicos son: (i) promover el desarrollo operativo y de gestión que permita incrementar la eficiencia en la prestación de AyS de UMAPS; (ii) contribuir a mejorar la sostenibilidad financiera de los servicios prestados por la UMAPS; (iii) fortalecer la planificación de la UMAPS; y (iv) fortalecer el marco sectorial a través de una mejor rectoría, regulación, gestión del recurso en un contexto de cambio climático, y prestación para atender mejor la demanda por los servicios. Esta es la primera operación de una serie de dos operaciones, consecutivas de un solo desembolso, independientes pero vinculadas técnicamente, bajo la modalidad de préstamo Programático Basado en Política (PBP).
SECRETARIA DE FINANZAS
Korea Infrastructure Development Co Financing Facility for Latin America and the Caribbean
INTER AMERICAN DEVELOPMENT BANK
INTER AMERICAN DEVELOPMENT BANK
SECRETARIA DE FINANZAS
BLENDED LOANS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
REPUBLICA DE HONDURAS
Inter-American Development Bank
Actual start
Planned end
Planned start
Actual end
INTER-AMERICAN DEVELOPMENT BANK
Loans and Grants accounting
2026231000
FIN-ACC-LGA@IADB.ORG
Honduras
2.1 Instrumentación de la entrada en funcionamiento de la UMAPS, focalizando en su reglamentación y marco institucional; estructura organizacional y responsabilidades; dirección y gobernanza; y alcance de los servicios de Agua y Saneamiento (AyS) a ser prestados aprobada Programa de Reforma de los Servicios de Agua y Saneamiento en el Distrito Central, Honduras
nan
WATER AND SANITATION
AGUA Y SANEAMIENTO
30000000
Disbursement in first quarter of 2020
30000000
Disbursement in first quarter of 2020
178278.69
Interest repayment in second quarter of 2020
120860.65
Interest repayment in second quarter of 2020
225000
Interest repayment in forth quarter of 2020
88775
Interest repayment in forth quarter of 2020
224326.3
Interest repayment in second quarter of 2021
89484.87
Interest repayment in second quarter of 2021
225616.44
Interest repayment in forth quarter of 2021
87441.78
Interest repayment in forth quarter of 2021
224383.56
Interest repayment in second quarter of 2022
109832.88
Interest repayment in second quarter of 2022
225616.44
Interest repayment in forth quarter of 2022
231286.76
Interest repayment in forth quarter of 2022
224383.56
Interest repayment in second quarter of 2023
339358.47
Interest repayment in second quarter of 2023
225616.44
Interest repayment in forth quarter of 2023
375028.14
Interest repayment in forth quarter of 2023
Programa de Reforma de los Servicios de Agua y Saneamiento en el Distrito Central - KIF.pdf
Honduras. Propuesta de préstamo para el Programa de Reforma de los Servicios de Agua y Saneamiento en el Distrito Central”.pdf
Honduras. Loan proposal for the Central District Water and Sanitation Services Reform Program”.pdf
Programa de Reforma de los Servicios de Agua y Saneamiento en el Distrito Central - ORC.pdf
HO-L1207 Second period Jan-Dec 2019-Public Report.pdf